Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai
by Mumbai Housing And Area Development Board · kanamwar Nagar, Mumbai 400083Also near Vikhroli East, Tagore Nagar
What’s in the report? →Possession date of Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai (MahaRERA PR1181012503058): 30 April 2033. It has 86 homes (1 BHK, 312 sq ft carpet), 0% sold or booked. No complaints on MahaRERA. How to check it yourself
Registered on MahaRERA under PR1181012503058, and currently active. Its completion date is now April 2033, including MahaRERA's automatic 4-month extension for all eligible projects; the builder hasn't asked for more time.
Source: MahaRERA website — records for PR1181012503058, read and compiled by GharKundli. Facts as filed on MahaRERA, no opinions.
What do you want to know about Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai?
Title report MahaRERA par nahi dikh rahi. Kya poochna hai?Tap a question. We’ll answer you on WhatsApp, free.
How the possession date of Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai has moved
31 December 2032
Completion date given when the project was registered
30 April 2033
MahaRERA's automatic 4-month extension for all eligible projects, not the builder's request
Source: Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai’s extension records on MahaRERA (PR1181012503058), read by GharKundli in October 2026. The builder’s reasons are quoted as filed. Your own possession date is the one in your agreement for sale.
What builders tell MahaRERA when they’re late: 14,973 applications analysed →GharKundli’s full report on Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai
Read from every filing on MahaRERA when you open it
- Risk & trust score, every point explained
- What the title report says about the land
- Each complaint and court case, and how it ended
- Construction pace against the April 2033 deadline
- Agreement clauses weaker than the RERA model
- Escrow audit, loans and the builder's record
- Questions to get answered in writing before you pay
- MahaRERA registration
- PR1181012503058
- Status
- Registered and active
- Builder
- Mumbai Housing And Area Development Board
- Location
- kanamwar Nagar, Mumbai · 400083
- Project type
- Residential / Group Housing
- Registered on
- 27 Mar 2026
- Completion date at registration
- December 2032
- Latest completion date
- April 2033
- MahaRERA's automatic extension
- +4 months (force majeure, all eligible projects)
- Homes
- 86
- Sold or booked
- 0%
- Towers
- 1
- Complaints on MahaRERA
- 0
- Court cases listed
- 0
- Title report on file
- Not found
- Builder's other MahaRERA projects
- 18
Construction progress of Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai, as filed by the builder
What the builder has reported to MahaRERA, as GharKundli read it in October 2026. GharKundli’s full report compares it with the deadline.
| Tower / wing | Plinth | Slabs (structure) | Internal work | Lifts, fire & electrical |
|---|---|---|---|---|
| Development of Pocket VII (Building No.16) | 100% | 80% | 40% | 0% |
Commencement certificate (CC), as filed on MahaRERA
- Development of Pocket VII (Building No.16): covers 23 floors
Latest CC order on MahaRERA: dated 25/06/2024.
Want to know when this changes? Kundli Watch sends a free WhatsApp update on Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai every 1–2 months.
Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai: buildings, flats and land, as filed on MahaRERA
| Type | Carpet area (sq ft) | Units |
|---|---|---|
| 1 BHK | 312 | 86 |
- Buildings: Development of Pocket VII (Building No.16) (23 floors, 86 units)
- Car parking: 12 covered
- Land: 823 sq m (about 0.2 acres) · sanctioned built-up 3,208 sq m
- Map: the location the builder filed on MahaRERA · Get directions
The builder’s record and reviews
Not enough of this builder’s other MahaRERA projects have reached their promised date to judge yet.
Read Google reviews of Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai →Reviews on Google are opinions by Google users; GharKundli doesn’t check them.
Kundli Watch
Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai: buyers & owners
Free: a construction progress update on WhatsApp every 1–2 months, and straight away when anything changes on MahaRERA — a later completion date, new complaints, a red flag. Your number stays private: never shown to other members or the builder.
Be the first to watch this project.
How are you connected to this project?
Watching needs only WhatsApp or your number. Bought here? No document needed now. From the builder’s team? Join to answer buyers’ questions; you never see members’ details. Owners and the builder’s team sign in with a one-time code, then come straight back here.
Common questions about Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai
What is the possession date of Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai?
According to GharKundli's check of MahaRERA records (updated October 2026), the latest completion date filed on MahaRERA for Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai in kanamwar Nagar, Mumbai is 30 April 2033, including MahaRERA's automatic 4-month extension for all eligible projects.
Is the builder's possession date different from the MahaRERA date for Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai?
Builders and listing sites often quote an earlier "target" date for handover. The completion date Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai's builder has filed on MahaRERA, the official one, is 30 April 2033, per GharKundli's check of MahaRERA records. If possession is late, what counts under RERA (Section 18) is the possession date written in your agreement for sale.
What is the RERA number of Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai?
According to GharKundli's check of MahaRERA records (updated October 2026), the MahaRERA registration number of Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai in kanamwar Nagar, Mumbai is PR1181012503058.
Is Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai registered with MahaRERA?
According to GharKundli's check of MahaRERA records (updated October 2026), Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai is registered as PR1181012503058 and its status is "Registered and active".
What is the current construction status of Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai? How much work is done?
According to GharKundli's check of MahaRERA records (updated October 2026), Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai's status on MahaRERA is "Registered and active". As filed by the builder, slab work on Development of Pocket VII (Building No.16) is 80% done and internal work 40%. GharKundli's full report compares construction progress with the deadline.
Does Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai have complaints on MahaRERA?
No complaints were listed on MahaRERA as of October 2026, per GharKundli's weekly check.
Is Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai safe to buy?
According to GharKundli's check of MahaRERA records (updated October 2026), Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai is registered on MahaRERA as PR1181012503058, its completion date has not been moved by the builder and no complaints are listed against it. GharKundli doesn't call a project safe or unsafe from these numbers alone: its full report gives a risk & trust score with every point explained.
How much GST is payable on a flat in Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai?
Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai is under construction, so GST applies to a new flat: 5% of the price, with no input tax credit. The lower 1% rate is only for "affordable" homes: carpet area up to 60 sq m (about 646 sq ft) in the Mumbai region, and price up to ₹45 lakh. Some flats in Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai are 312 sq ft carpet, small enough for 1% if the price is ₹45 lakh or less. There is no GST on stamp duty or registration, and none once the occupancy certificate is issued.
What is the stamp duty and registration cost for a flat in Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai?
For a flat in Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai (Mumbai), stamp duty is 6% of the agreement value, or of the ready reckoner value if that's higher, including 1% Metro Cess. A woman buying in her own name pays 5%. Registration is 1% of the value, capped at ₹30,000. On a ₹1 crore flat that's about ₹6 lakh in stamp duty plus ₹30,000 registration. GharKundli's property cost calculator works it out for your price: gharkundli.com/tools/property-cost-calculator
Has Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai received its OC? Is it ready to move in?
Not yet. According to GharKundli's check of MahaRERA records (updated October 2026), Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai is still under construction, with 30 April 2033 as the latest completion date filed on MahaRERA. A flat is ready to move in only once the occupancy certificate (OC) is issued, after construction is complete.
Has Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai uploaded its title report on MahaRERA?
According to GharKundli's check of MahaRERA records (updated October 2026), no title report for Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai was found on MahaRERA. Builders are expected to upload one; before booking, ask the builder for the advocate's title certificate in writing.
No title report is on MahaRERA for this project. See which documents are missing →
How can I get updates if Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai's possession date changes?
The latest dates are on Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai's MahaRERA page (PR1181012503058). GharKundli's Kundli Watch sends a free WhatsApp update on Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai every 1–2 months, and straight away when anything changes on MahaRERA: a later completion date, new complaints or a red flag. Your number is never shown to the builder.
How many floors does Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai have?
According to GharKundli's check of MahaRERA records (updated October 2026), Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai has one building filed: Development of Pocket VII (Building No.16) with 23 floors and 86 units.
What are the flat sizes (carpet area) in Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai?
According to GharKundli's check of MahaRERA records (updated October 2026), the builder has filed these homes for Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai: 1 BHK: 312 sq ft carpet (86 homes). Carpet area is the usable floor area inside the walls, as defined under RERA.
How much parking does Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai have?
According to GharKundli's check of MahaRERA records (updated October 2026), the builder has filed 12 covered car parking spaces for Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai.
How big is the land of Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai?
According to GharKundli's check of MahaRERA records (updated October 2026), Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai stands on 823 sq m of land (about 0.2 acres), with 3,208 sq m of sanctioned built-up area.
What are the reviews of Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai?
Google Maps has reviews of Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai written by Google users; GharKundli links to them on this page but doesn't check them. For facts rather than opinions: no complaints are listed on MahaRERA, and Kundli Watch shows verified owners of the project.
What is the address and pincode of Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai?
Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai by Mumbai Housing And Area Development Board is in kanamwar Nagar, Mumbai, pincode 400083 (near Vikhroli East, Tagore Nagar), Maharashtra, and is registered on MahaRERA as PR1181012503058, per GharKundli's check of MahaRERA records. GharKundli lists all 176 MahaRERA projects in Vikhroli East (400083).
How many flats are in Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai, and how many are sold?
According to GharKundli's check of MahaRERA records (updated October 2026), Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai has 86 homes in 1 tower registered on MahaRERA, and 0% of them are sold or booked.
When was Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai registered on MahaRERA?
According to GharKundli's check of MahaRERA records (updated October 2026), Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai was registered on MahaRERA on 27 March 2026. GharKundli did not find a title report on the land on file there.
Does Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai have any legal issues or court cases?
No court cases are listed for Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai on MahaRERA, per GharKundli's check of MahaRERA records (updated October 2026).
Who is the builder / developer of Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai?
According to GharKundli's check of MahaRERA records (updated October 2026), the builder is Mumbai Housing And Area Development Board, which has 18 other projects registered on MahaRERA.
Check it yourself on MahaRERA
- How to check the possession date of Construction of 86 EWS T/S on land bearing S. No.113(Pt), C.T.S. No.365A/2(pt.) Pocket VII (Govt) Land of Village Hariyali, kanamwar Nagar, Vikroli(E), Mumbai
- How to find and verify a MahaRERA number
- How to check construction status on MahaRERA
- Occupancy certificate (OC): what to check before possession
- Possession delayed? Work out the interest the builder owes
- How to file a MahaRERA complaint against a builder
- Where MahaRERA complaints are: the data
- Why builders ask MahaRERA for more time: the data
Other projects in Vikhroli East (400083)
- Signature
- Element 7 8
- Vaibhavlaxmi Bramhand
- Adityaraj Empire
- Kanakdhara
- Adityaraj Bliss
- Shree
- Silver Serenity
Other projects by Mumbai Housing And Area Development Board
- Construction of 70 LIG TS S. No.113(Pt) CTS 356A/2pt Pocket V kanamwar Nagar Mumbai
- Cons 1221 MIG T/S and 100 Shops S. No. 113 (pt), CTS 356/A (pt) Pocket II Kannamwar Nagar Mumbai
- Cons of Mig TS CTS 356 A Kannamwar Nagar Pocket VIII Bearing S No 113 PT
- Cons of 172 LIG TS & 24 Shops at CTS 356A2,Pocket VI Kannamwar Nagar, Vikhroli (E), Mumbai
- Cons of Mig TS CTS 356 A Kannamwar Nagar Pocket IX Bearing S No 113 PT
- Sector R-3 of Siddhartha Nagar Patra Chawl Redevelopment
- Proposed Bldg on Plot CTS No. 827 B, S.No. 239, in betn Shivneri CHS MCGM Pumphouse, Khadakpada
- Construction of Bldg on Plot CTS No 104 J Pt and 147 Pt of S.No 31 and 39, Old Dindoshi, Malad East
Data compiled by GharKundli (gharkundli.com) from MahaRERA public records, as of October 2026. Check the project’s MahaRERA page for the latest filings. Not legal advice.