MahaRERA projects in Chinchwadgaon, Pune (411033)

According to GharKundli's check of MahaRERA records, 370 housing projects are registered in pincode 411033 (Chinchwadgaon, Pune). 243 are still being built, 77 with possession due by the end of 2027. For 265, the completion date on MahaRERA is later than the one first promised. 115 have at least one complaint filed on MahaRERA.

Pincode 411033 also covers: Punawale, Chinchwad, Tathwade, Tathawade, Thergaon, Dange Chowk.

“Possession due” is the latest completion date the builder has filed on MahaRERA; “first promised” is the date given at registration. Open a project for its full MahaRERA record.

ProjectMahaRERA statusPossession due (MahaRERA)First promisedComplaints
Darekar Heights
Mangaldeep Radiant Developers
Abeyance29 Jun 2025passed30 Jun 20240
Kshitij Apartment
Siddhhidata Developer
Active30 Oct 2026passed30 Jun 20260
AURA BLUE
FORTUNE REALTY GROUP
Active31 Oct 2026passed31 Oct 20240
Pride Heritage
BHAKTI INFRA
Active31 Oct 2026passed31 Dec 20250
SURYA SKIES
SURYA DEVELOPER
Active30 Nov 202631 Dec 20250
Samarth Paradise
Samarth Associates
Active30 Dec 202628 Feb 20260
ABHISHEK SAHAKARI GRUHRACHANA SANSTHA MARYADIT
MORAYA ASSOCIATES
Active31 Dec 2026same0
HS PRIVITUDE
H S ASSOCIATES
Active31 Dec 2026same11
ISLE OF LIFE - BUILDING B and C
R R VENTURES
Active31 Dec 202631 Aug 20250
PANCHATATTVA HEIGHTS
RAJENDRA KUMAR PUGALIA
Active31 Dec 202630 Dec 20230
RAMAN STELLAR
SOHAM SHIVAM DEVELOPERS
Active31 Dec 202631 Dec 20250
SAI DARSHAN PHASE II
SAI SHRADDHA DEVELOPERS
Active31 Dec 202631 Dec 20250
Sai Residency
SAI DEVELOPERS
Active31 Dec 202630 Apr 20230
VIVANTA AARANYA
PUNAMIYA URBAN DEVELOPMENT LLP
Active31 Dec 2026same0
VISION ACE COMMERCIAL PHASE I
VISION ACE
Active28 Jan 202730 Jun 20230
AUSTIN ARENA
DIVYA ASSOCIATES
Active30 Jan 202731 Dec 20253
SHANTIVAN
TRIMURTI GROUP PROMOTERS & BUILDERS
Active30 Jan 202730 Mar 20230
SHREE HERITAGE
BHAKTI VENKATESHWARA DEVELOPERS
Active30 Jan 202730 Sep 20260
VIVANTA Next
SHREE SONIGARA PUNAMIYA DEVELOPERS
Active30 Jan 202730 Sep 20260
YOJANA HERITAGE
Bhakti Buildcon
Active30 Jan 202731 Dec 20250
NANAI HIGHTS
SAISAGAR PROPERTIES
Active31 Jan 202731 Jan 20210
Audumbar Green A Wing
Alankar Bagal Group
Active28 Feb 202730 Apr 20260
POOJA CO-OP. HSG. SOC. LTD.
PRATHMESH DEVELOPERS
Active28 Feb 202730 Jun 20250
Kendrai 7 Avenue
SAMARTH BUILDCON
Active31 Mar 2027same0
PRITHIVI SHOURYA SKY ONE
PRITHVI SHAURYA NIRMITEE INDIA PRIVATE LIMITED
Active31 Mar 202731 Jul 20190
YASHWANT AUDUMBAR A WING
AKRUTI PROMOTERS AND DEVELOPERS
Active31 Mar 202731 Mar 20260
YASHWANT AUDUMBAR B WING
AKRUTI PROMOTERS AND DEVELOPERS
Active31 Mar 202731 Mar 20260
10 Square
Nitin T Patil
Active30 Apr 202731 Dec 20260
Akshara Meadows
Garve Developers and Promoters
Active30 Apr 202731 Dec 20260
Arihant Greens
KONARK VENTURES
Active30 Apr 202731 Dec 20261
AUDUMBAR BLISS
ROYAL SRUSHTI DEVELOPERS
Active30 Apr 202731 Dec 20260
DAFFODIL HOMES
PRATHMESH DEVELOPERS
Active30 Apr 202731 Dec 20250
INFINITY AVANA
TULIP INFRA
Active30 Apr 202731 Dec 20261
Morya Residency
AVINASH JAYWANT DURGADE
Active30 Apr 202731 Dec 20260
ROYAL COURT
SHRI ANAND VENKATESHWARA ASSOCIATES
Active30 Apr 202731 Dec 20260
RUTUJA ENCLAVE
G S BUILDERS AND DEVELOPERS
Active30 Apr 202731 Dec 20260
Shantais Divine Vastu
Mahalaxmi Developers
Active30 Apr 202731 Dec 20250
SIGNATURE PARK BUILDING M MHADA
SHREE SONIGARA REALCON
Active30 Apr 202731 Dec 20250
SOHAM SRUSHTI
SOHAM DEVELOPERS
Active30 Apr 202731 Dec 20260
SOMANI TOWERS
SOMANI REALTY AOP
Active30 Apr 202731 Dec 202020
TRIO ALPHA
TRIO SPACES
Active30 Apr 202731 Dec 20250
UNIQUE INFINITY
UNIQUE GROUP
Active30 Apr 202731 Dec 20260
UNIQUE VRUNDAVAN
UNIQUE GROUP
Active30 Apr 202731 Dec 20260
VISION ONE PHASE TWO
SS GROUP
Active30 Apr 202728 May 20213
VLD Heritage
M/s VLD Associates
Active30 Apr 202731 Dec 20240
W P ROYAL ELEVIA
W P DEVELOPERS
Active30 Apr 202731 Dec 20260
41 Cosmo
MS ORANGE KRISALA REALTY LLP
Active30 May 202730 Nov 202571
Nest EWS
Mahindra Lifespace Developers limited
Active31 May 202731 Jan 20270
SAISHA
SAI SAMARTTHA PROPERTIES
Active31 May 202723 Jun 20241
SAISHA PHASE - 2
SAI SAMARTTHA PROPERTIES
Active31 May 202723 Dec 20240

250 more projects

  1. Glory · 30 Jun 2027
  2. EMERALD TOWERS · 31 Jul 2027
  3. Sai Mudra · 31 Jul 2027
  4. Sai Tatvaa · 31 Jul 2027
  5. THE RISE · 31 Jul 2027
  6. Visoka Keystone- A Building · 31 Jul 2027
  7. Rahul Downtown - Phase II · 30 Aug 2027
  8. VCC VIARA · 30 Aug 2027
  9. 41 Zillenia · 30 Sep 2027
  10. Evernest Empressa · 30 Sep 2027
  11. Mahindra Happinest Tathawade Phase 2 · 30 Sep 2027
  12. WESTMONT · 30 Sep 2027
  13. 41Cosmo · 29 Oct 2027
  14. AARNA REGENCY · 29 Oct 2027
  15. AISHWARYAM INSIGNIA · 30 Oct 2027
  16. Austin Avenue · 30 Oct 2027
  17. GANGA AMBER PH II · 30 Oct 2027
  18. NARMADA · 30 Oct 2027
  19. Nexus Westia · 30 Oct 2027
  20. SKY MERIDIEN · 30 Oct 2027
  21. The Corniche · 30 Oct 2027
  22. VISHNULAXMI RESIDENCY · 30 Oct 2027
  23. R K PRIDE · 30 Nov 2027
  24. 41 Zillenia Phase 2 · 31 Dec 2027
  25. PLATINUM PALLAZO PHASE II · 31 Dec 2027
  26. Vishnu Laxmi · 31 Dec 2027
  27. Vision New Ville · 31 Dec 2027
  28. PAVAN · 30 Jan 2028
  29. Pride Universal · 30 Jan 2028
  30. Aishwaryam Future · 15 Feb 2028
  31. ISLE OF LIFE BLD-D · 29 Feb 2028
  32. LIFE REPUBLIC SECTOR R17A/17A AVENUE-SOUND OF SOUL/SOUND SQUARE · 30 Mar 2028
  33. Vithai · 15 Apr 2028
  34. The 4th Axis Phase 2 · 25 Apr 2028
  35. Silveroak C3 · 26 Apr 2028
  36. ATLANTE · 30 Apr 2028
  37. AUDUMBER RESIDENCY · 30 Apr 2028
  38. F Signature MHADA · 30 Apr 2028
  39. F-SIGNATURE BY AISHWARYAM U · 30 Apr 2028
  40. ITREND PALACIO · 30 Apr 2028
  41. Life Republic Sector R35/35thAvenue Harmony Residency · 30 Apr 2028
  42. Moraya Sonadeep · 30 Apr 2028
  43. Nexus Skydale · 30 Apr 2028
  44. Nitin Residency · 30 Apr 2028
  45. PARK WEST · 30 Apr 2028
  46. Prayagraj · 30 Apr 2028
  47. RADHAA KRISHNA HEIGHTS · 30 Apr 2028
  48. Raman Legacy · 30 Apr 2028
  49. Rudraksh Vantage · 30 Apr 2028
  50. SAI KRUPA · 30 Apr 2028
  51. Sai Mehar · 30 Apr 2028
  52. Saishilp Empire · 30 Apr 2028
  53. SHASHWAT · 30 Apr 2028
  54. SHYNI GOLD MANGALAM · 30 Apr 2028
  55. Skylish Saai · 30 Apr 2028
  56. Sukhwani Sepia, 97 Sepia, Phase III · 30 Apr 2028
  57. SURYA SKIES A AND A1 WING · 30 Apr 2028
  58. Venkatesh Aveneu · 30 May 2028
  59. Avis Avante · 31 May 2028
  60. SKY HOMES · 31 May 2028
  61. Paradigam Vandan · 29 Jun 2028
  62. GAWADE GALORE · 31 Jul 2028
  63. BRRAMHA RESIDENCY · 30 Sep 2028
  64. Sky Lavish · 30 Sep 2028
  65. ANP AUTOGRAPH · 30 Oct 2028
  66. GURUDEO · 30 Oct 2028
  67. Sai Vilasita · 30 Oct 2028
  68. VARDHAMAN ALTEZZA · 30 Oct 2028
  69. 41 Luxovert · 30 Nov 2028
  70. 12th Avenue · 31 Dec 2028
  71. Bhagawati Chambers · 31 Dec 2028
  72. Construction of 24 LIG, 768 MIG and commercial building on S.No. 126 127/1 Tathawade, Pune. Phase-II · 31 Dec 2028
  73. Meridian Square · 31 Dec 2028
  74. Omkar Skyline · 31 Dec 2028
  75. ORIANA WORLD · 31 Dec 2028
  76. Shakai · 31 Dec 2028
  77. Sukhwani Kingsley · 31 Dec 2028
  78. SAI LANDMARK · 8 Feb 2029
  79. 24Life Altaa · 28 Feb 2029
  80. ROYAL PRESTIGE · 30 Mar 2029
  81. 18 Magnitude · 28 Apr 2029
  82. EMERALD GROVE · 29 Apr 2029
  83. 33 Central Avenue Wing F-3 · 30 Apr 2029
  84. AA Privilege · 30 Apr 2029
  85. Aeternaa - C Wing Phase 1 · 30 Apr 2029
  86. Akshara Grandeur · 30 Apr 2029
  87. ANIKA PICCADILLY PHASE 3 · 30 Apr 2029
  88. ASTER PARK · 30 Apr 2029
  89. Avenue 7 · 30 Apr 2029
  90. BASIL MAXIMUS WING F · 30 Apr 2029
  91. EH TOWERS · 30 Apr 2029
  92. IOS PRIME · 30 Apr 2029
  93. Itrend Vesta · 30 Apr 2029
  94. Legacy Ekam · 30 Apr 2029
  95. LUSH RESIDENCES · 30 Apr 2029
  96. MILLENNIUM FALCON · 30 Apr 2029
  97. NEWTON HOMES THERGAON-CHINCHWAD · 30 Apr 2029
  98. Nirman Serenopolis · 30 Apr 2029
  99. PANOREEVA GREENS · 30 Apr 2029
  100. PLEROMA GREENS · 30 Apr 2029
  101. ROHAN HARITA PHASE 2 · 30 Apr 2029
  102. SAMRUDDHI ASHWAMEDH · 30 Apr 2029
  103. SIGNATURE RITZ · 30 Apr 2029
  104. SUMANGAL CO-OP HSG. SOCIETY · 30 Apr 2029
  105. THE ORION · 30 Apr 2029
  106. Vishnu Crown · 30 Apr 2029
  107. West World · 30 Apr 2029
  108. F PREMIUM · 21 Jul 2029
  109. Siyona Phase - II · 30 Jul 2029
  110. Trio Sync · 31 Jul 2029
  111. SAMRUDDHI INDRAPRASTH RESIDENCY · 30 Sep 2029
  112. INFINITY EVANA · 30 Oct 2029
  113. Nexus Skydale E Wing · 30 Oct 2029
  114. SIENNA · 30 Oct 2029
  115. One Pearl · 30 Nov 2029
  116. Anika Piccadilly Phase 4 · 31 Dec 2029
  117. ORIANA WORLD PHASE 3 · 31 Dec 2029
  118. ROHAN HARITA PHASE 4 · 31 Dec 2029
  119. Venkateshwara Height · 31 Dec 2029
  120. Kairosa Cluster B · 30 Jan 2030
  121. QUE 154 A AND B WING · 30 Jan 2030
  122. QUE 154 G WING · 30 Jan 2030
  123. Alpine 21 · 28 Feb 2030
  124. Austin Yana · 16 Apr 2030
  125. 18 Altitude · 29 Apr 2030
  126. 33 Central Avenue Wing F-1 · 30 Apr 2030
  127. ARIA · 30 Apr 2030
  128. Arkaay Tower · 30 Apr 2030
  129. BASIL MAXIMUS WING G · 30 Apr 2030
  130. Basil Maximus Wing H · 30 Apr 2030
  131. GAIKWAD FLORIO · 30 Apr 2030
  132. Gokhale Park · 30 Apr 2030
  133. Infinity Solaria · 30 Apr 2030
  134. IOS PRIME B1 · 30 Apr 2030
  135. K SHIRE PHASE 3 · 30 Apr 2030
  136. KOHINOOR UPTOWN AVENUE · 30 Apr 2030
  137. Legacy Milestone · 30 Apr 2030
  138. Life Republic Sector R34/34th Avenue - Duet/Phase I · 30 Apr 2030
  139. MARIGOLD HEIGHTS · 30 Apr 2030
  140. Millennium Samriddhi · 30 Apr 2030
  141. MORYA SKYDALE · 30 Apr 2030
  142. Namrata Manifesta · 30 Apr 2030
  143. ORIANA WORLD PHASE 2 · 30 Apr 2030
  144. ROHAN HARITA PHASE 3 · 30 Apr 2030
  145. SAI SAHARA · 30 Apr 2030
  146. SIGNATURE PARK K L N BUILDINGS · 30 Apr 2030
  147. Sonigara Quorra · 30 Apr 2030
  148. UDYAM NAGARI · 30 Apr 2030
  149. Arise Capital · 31 Jul 2030
  150. LIFE REPUBLIC SECTOR R14/14TH AVENUE - QRIOUS/PHASE - I · 30 Aug 2030
  151. PETALS · 30 Aug 2030
  152. F Signature · 30 Oct 2030
  153. F-Signature By Aishwaryam · 30 Oct 2030
  154. NB EVO PLAZA · 30 Oct 2030
  155. SENTOSA EDGE · 30 Oct 2030
  156. The Privve · 30 Oct 2030
  157. Legacy Highpoint · 31 Dec 2030
  158. V Top VELESTA · 31 Dec 2030
  159. 108 ASTERA "WING D E & F" · 30 Apr 2031
  160. 6, Boulevard · 30 Apr 2031
  161. Ace Ayodhya · 30 Apr 2031
  162. ARIHANT SKYSUITES · 30 Apr 2031
  163. ASHOKA PRIME · 30 Apr 2031
  164. HARIVISHVA SKYFINIA PHASE 1 · 30 Apr 2031
  165. LIFE REPUBLIC SECTOR R14/14TH AVENUE - QRIOUS/PHASE – II · 30 Apr 2031
  166. LIFE REPUBLIC SECTOR R31/31st AVENUE – ECHOES/PHASE – 1 · 30 Apr 2031
  167. LIFE REPUBLIC SECTOR R34/34TH AVENUE-DUET/PHASE - II · 30 Apr 2031
  168. LIFE REPUBLIC SECTOR R5/5TH AVENUE-CANVAS/PHASE-II · 30 Apr 2031
  169. NEOPOLIS · 30 Apr 2031
  170. NIRMAN COSMOPOLIS · 30 Apr 2031
  171. SKY LUXE · 30 Apr 2031
  172. The Enclave 1 · 30 Apr 2031
  173. Puneville Phase III Cluster D · 30 Jul 2031
  174. BRPL MHADA CLUSTER · 30 Aug 2031
  175. Aventis - Tower A · 30 Sep 2031
  176. Aventis - Tower C & D · 30 Sep 2031
  177. Puneville Phase II Cluster B · 30 Sep 2031
  178. Aeternaa - B Wing Phase 2 · 31 Dec 2031
  179. IMPERIO TOWERS PHASE 2 · 31 Dec 2031
  180. SILVER METEOR · 31 Dec 2031
  181. 108 ASTERA · 30 Apr 2032
  182. Ace Ayodhya Phase II · 30 Apr 2032
  183. ELITE THE ARC · 30 Apr 2032
  184. GURUSHISHYAYTAN · 30 Apr 2032
  185. Imperio Towers Phase 1 · 30 Apr 2032
  186. RGS Forte Aspire · 30 Apr 2032
  187. SOMANI DREAM HOME PHASE IV · 30 Apr 2032
  188. SONIGARA THE MARK PHASE I · 30 Apr 2032
  189. Supreme Rivana Ph-I · 30 Apr 2032
  190. Kohinoor Avantara · 31 Jul 2032
  191. EEVVA · 30 Apr 2033
  192. NB EVO HIGHSTREET · 30 Apr 2033
  193. YASHADA EVO RESIDENCES PH - I · 30 Apr 2035
  194. SRUSHTI APARTMENT · completed
  195. 41 Estera Phase 2 · completed
  196. Prathamesh Excellencia · completed
  197. Aseemvishwa · completed
  198. AFFORDABLE HOUSING SCHEME IN SECTOR 30-32 WALHEKARWADI PMRDA, PUNE · completed
  199. 41 ELITE · completed
  200. 41 ELITE · completed
  201. 41 ELITE · completed
  202. Atulya Nirman A B Wing · completed
  203. SENTOSA PRIDE WING B · completed
  204. Vaiga · completed
  205. 19 Grand West Wing B · completed
  206. iOS Tathawade · completed
  207. SAI AUDUMBAR · completed
  208. hi life phase3 · completed
  209. Hi Life · completed
  210. 41 ESTERA PHASE 3 · completed
  211. 41COSMO · completed
  212. Silver Cube · completed
  213. Rahul Downtown - Phase I · completed
  214. SUNDER MOTI · completed
  215. Sai Grace · completed
  216. Kohinoor Sapphire III · completed
  217. Bhakti Elite · completed
  218. INFINITY CUBE · completed
  219. Navkar Suchit · completed
  220. SARIKA · completed
  221. BVM FLORA · completed
  222. INFINITY WORLD · completed
  223. 45 Shashwat Heights · completed
  224. HARIVISHVA INFINIA PHASE 1 · completed
  225. Morayatirth · completed
  226. RADHEY PREMLOK CO OPERATIVE HOUSING SOCIETY LTD · completed
  227. ROHAN ANANTA PHASE II · completed
  228. ROHAN ANANTA PHASE III · completed
  229. SONIGARA ESTILO · completed
  230. ORCHID HOMES · completed
  231. PRATHAM · 31 May 2024
  232. 19 Grand West Wing A · 30 Dec 2024
  233. Metro Life Optima Residences · 31 Dec 2024
  234. ASHOKA COMMERCIAL HUB · 31 Mar 2025
  235. 18 LONGITUDE PHASE 3 · 30 Jun 2025
  236. 41 ELITE PHASE 3 BUILDING C · 30 Jun 2025
  237. Kairosa Cluster A · 30 Jun 2025
  238. Audumbar Parvati by Gaurav Developers · 30 Jul 2025
  239. Grace · 4 Aug 2025
  240. Sudarshan Solitaire · 30 Sep 2025
  241. NEWTON HOMES TATHAWADE PHASE I · 30 Nov 2025
  242. DREAM CITY · 30 Dec 2025
  243. Altitude · 31 Dec 2025
  244. ARIHANT HEIGHTS · 31 Dec 2025
  245. KHUSHI AANGAN · 31 Dec 2025
  246. NOVOPRIDE · 31 Dec 2025
  247. SWAPNASHILP · 31 Dec 2025
  248. SAVITA CALYSTA · 9 Feb 2026
  249. BHAKTI RUDVED · 30 Jun 2026
  250. Dinkar Apartment · 30 Jun 2026

Other areas in Pune

All areas in Pune →

Data compiled by GharKundli (gharkundli.com) from MahaRERA public records. Projects are grouped by the pincode filed on MahaRERA.