MahaRERA projects in Ravet, Pune (412101)
According to GharKundli's check of MahaRERA records, 344 housing projects are registered in pincode 412101 (Ravet, Pune). 220 are still being built, 80 with possession due by the end of 2027. For 243, the completion date on MahaRERA is later than the one first promised. 94 have at least one complaint filed on MahaRERA.
Pincode 412101 also covers: Kiwale, Mamurdi, Haveli, Kivale, Belmondo, Ravet Pradhikaran.
“Possession due” is the latest completion date the builder has filed on MahaRERA; “first promised” is the date given at registration. Open a project for its full MahaRERA record.
| Project | MahaRERA status | Possession due (MahaRERA) | First promised | Complaints |
|---|---|---|---|---|
| MAHESHWARAM MAJESTIC MAHESHWARAM ASSOCIATES | Active | 30 Oct 2026passed | 31 Dec 2025 | 1 |
| REKHA DEVI HERITAGE SHREE MAHALAXMI ASSOCIATES | Active | 30 Oct 2026passed | 30 Jun 2026 | 0 |
| SAMARTH SERENITY BUILDING C SHREE SWAMI SAMARTH DEVELOPERS | Active | 31 Oct 2026passed | same | 0 |
| Yashodham OM DEVELOPERS | Active | 31 Oct 2026passed | 31 Dec 2024 | 0 |
| SPLENDID HOMES PANDURANG MARUTI KALOKHE | Active | 30 Nov 2026 | 30 Dec 2023 | 0 |
| 26 AVENUE AVENUE GROUP | Active | 31 Dec 2026 | 31 Dec 2025 | 0 |
| Ace Abode Phase 2A ACE GLOBAL REALTY | Active | 31 Dec 2026 | same | 0 |
| Kedar Residency Subhagya Promoters & Builders Pvt Ltd | Active | 31 Dec 2026 | 31 Dec 2025 | 0 |
| MIravet District Phase - I AUM DEVELOPERS | Active | 31 Dec 2026 | 31 Dec 2025 | 3 |
| Morya Sanctuary MS Associates | Active | 31 Dec 2026 | same | 0 |
| SOLASTA A BUILDING GIRITIRTHA ASSOCIATES | Active | 31 Dec 2026 | 31 Dec 2025 | 0 |
| TERRA GREENS BHAGWATI GROUP | Active | 31 Dec 2026 | 31 Dec 2025 | 0 |
| GODREJ CARNIVAL Godrej Skyline Developers Limited | Active | 30 Jan 2027 | 30 Sep 2025 | 5 |
| Godrej Nurture Godrej Skyline Developers Limited | Active | 30 Jan 2027 | 30 Sep 2024 | 33 |
| MADHUBAN Godrej Skyline Developers Limited | Active | 30 Jan 2027 | 30 Sep 2025 | 30 |
| Rose Gardenia Rose Dream Developers | Active | 30 Jan 2027 | 30 Jan 2024 | 0 |
| SADHGURU HOMES ASHOK MOTIRAM TARAS | Active | 30 Jan 2027 | 31 Dec 2025 | 0 |
| SAI SIGNATURE SHREE SAI CREATIVES | Active | 30 Jan 2027 | 31 Dec 2025 | 0 |
| STAR VISTA RAVIE KHILUMAL OCHANNI | Active | 30 Jan 2027 | 31 Jul 2024 | 1 |
| EKAANT SHREE BALAJI ASSOCIATES | Active | 31 Jan 2027 | 31 Dec 2024 | 0 |
| PANACHE FLORA SHREE BHAGWATI CONSTRUCTION | Active | 28 Feb 2027 | 25 Dec 2025 | 0 |
| SKY BLUE ROYAL REALTY | Active | 28 Feb 2027 | 30 Sep 2025 | 0 |
| Taras Heights Taras Landmark | Active | 28 Feb 2027 | 31 Oct 2026 | 0 |
| THE MIRACLE KRISHNA ASSOCIATES | Active | 15 Mar 2027 | 15 Nov 2026 | 0 |
| DOLPHIN PALMS WINGS C, D AND E M/S DOLPHIN REALTY | Active | 31 Mar 2027 | same | 0 |
| AshokVistas by Peninsula Land Phase 1 Peninsula Land Limited | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| BHOSALE EMPIRE MORUS DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| BHOSALE EMPIRE Bhakti Developers | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Crystal Homes Phase - I Crystal Creations | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| GINI VIBRANCE Gini Citicorp Realty LLP | Active | 30 Apr 2027 | 31 Dec 2026 | 1 |
| GREEN VILLA SHUBHASHREE ASSOCIATES | Active | 30 Apr 2027 | 31 Dec 2024 | 0 |
| Infinity Spaces Infinity Infracorp | Active | 30 Apr 2027 | 30 Dec 2026 | 0 |
| JAI BLISS JAI CONSTRUCTIONS | Active | 30 Apr 2027 | 30 Jun 2024 | 2 |
| Mahalaxmi Heights MAHALAXMI ASSOCIATES | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| MAITHILI AROMA MARNE GROUP | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Mangalam Melizma Ved Mangalam Associates | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Midori Towers Saikrushna Developers | Active | 30 Apr 2027 | 31 Dec 2024 | 0 |
| Mysha Mrs Druti Pravin Totlani | Active | 30 Apr 2027 | 31 Dec 2026 | 6 |
| Palaash Enlite G S Promoters | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Petal Greens A R Associates | Active | 30 Apr 2027 | 31 Dec 2024 | 0 |
| PRABHA HEIGHTS ADVAIT DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| RAJ KUNJ SWARAJ KUNDALIK AMALE | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Sai Anand Vighnaharta Landmark | Active | 30 Apr 2027 | 1 Mar 2026 | 0 |
| SAI PARK TOWN Shree Sai Reality | Active | 30 Apr 2027 | 31 Dec 2020 | 0 |
| Sai Serenity Shree Sai Capstone | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Santiago Skyland Sah & AVR Associates LLP | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Serene Villas Elite Group | Active | 30 Apr 2027 | 31 Aug 2025 | 0 |
| Seventy 7 Skyway Siddhidata Group | Active | 30 Apr 2027 | 30 Jun 2025 | 0 |
| SHREE GANESH GRACIA M/S GOBIND BUILDERS AND DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Solasta B and C Building GIRITIRTHA ASSOCIATES | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
250 more projects
- SUYOG SIYONA · 30 Apr 2027
- TULSIDAS CORNER RAVET · 30 Apr 2027
- SHREE SADGURU RESIDENCY · 28 Jun 2027
- Ace Abode Phase 2B · 30 Jun 2027
- ACE ABODE PHASE 3 · 30 Jun 2027
- OPULENT TOWER · 30 Jun 2027
- SADGURU EMPIRE · 30 Jun 2027
- VAASTU IMPERIAL Wing A · 30 Jun 2027
- VAASTU IMPERIAL Wing B · 30 Jun 2027
- Mamurdi MHADA North · 30 Jul 2027
- Muktai · 31 Jul 2027
- NAKSHATRA RESIDENCY · 31 Jul 2027
- SKYLAR · 31 Jul 2027
- INSPIRA · 30 Aug 2027
- Vansh Vastu · 30 Sep 2027
- Aqua Life A Bldg · 30 Oct 2027
- AshokVistas by Peninsula Land - Phase 2 · 30 Oct 2027
- GODREJ SERENE · 30 Oct 2027
- Kaustubh Realty Plot C · 30 Oct 2027
- Life Canvas Phase 2 · 30 Oct 2027
- OM MANGALAM PATH · 30 Oct 2027
- SUKHAKARTA RESIDENCY · 30 Oct 2027
- THE SKYLARK · 30 Oct 2027
- V UPTOWN · 30 Oct 2027
- THE RISING · 30 Nov 2027
- VIVANTA NEST · 30 Dec 2027
- KRISHNA KUNJ · 31 Dec 2027
- Sai Nirmal · 31 Dec 2027
- SHANTAI CLASSIC “D” Building · 31 Dec 2027
- SHREE RAM RESIDENCY · 31 Dec 2027
- Astoria Royals B wing · 30 Jan 2028
- FOREST GROVE AT GODREJ PARK GREENS · 30 Jan 2028
- 24 CASA SANJIVANI · 29 Feb 2028
- KRISHIV ELITE · 29 Feb 2028
- AADITYA BHAIRAW · 30 Apr 2028
- Emerald Heights · 30 Apr 2028
- GINI VIVANTE PHASE 02 · 30 Apr 2028
- GT PRIDE · 30 Apr 2028
- KISANA SKIES · 30 Apr 2028
- Magnus Parkway · 30 Apr 2028
- Meriton Heights · 30 Apr 2028
- Onkar Greens · 30 Apr 2028
- Parva Anand · 30 Apr 2028
- Rajveer Park · 30 Apr 2028
- Rudraksh Home · 30 Apr 2028
- Sai Savera · 30 Apr 2028
- Samruddhi Nilaya · 30 Apr 2028
- Shantai Green · 30 Apr 2028
- Shree Ganesh Gracia Phase II · 30 Apr 2028
- Sidhhi Plaza · 30 Apr 2028
- SPARKLE AT GODREJ SERENE · 30 Apr 2028
- THE UNICORN BUILDING C WING C1 & C2 · 30 Apr 2028
- TURQUOISE RESIDENCES · 30 Apr 2028
- UNITE RAVET · 30 Apr 2028
- Urban Skyline Phase II · 30 Apr 2028
- Sadguru Empire - A and B Wing · 30 Jun 2028
- G.N. HEIGHTS · 13 Jul 2028
- Godrej Park Greens · 30 Jul 2028
- Millennium Amara · 31 Jul 2028
- Peninsula Plaza · 31 Jul 2028
- 1 Hallmark Aveneu Phase II · 30 Aug 2028
- Sky Elegance · 30 Aug 2028
- STELLAR SYMPHONY · 30 Aug 2028
- NIMBARK RESIDENCY · 7 Sep 2028
- Palm Spring D Wing · 30 Sep 2028
- SHIVAM RESIDENCY · 30 Sep 2028
- BHALCHANDRA HARMONY · 30 Oct 2028
- Little Earth, Kiwale - Building C13 · 30 Oct 2028
- Little Earth, Kiwale - Building C14 · 30 Oct 2028
- Presidential Towers · 30 Oct 2028
- Shilp Shantivan · 30 Oct 2028
- SHRUTI ANANTA · 30 Oct 2028
- SMK PLATINUM · 30 Oct 2028
- Rose Paradise · 9 Nov 2028
- Elite Crown · 31 Dec 2028
- SHALIGRAM SKY · 31 Dec 2028
- ACE ATMOSPHERE PHASE I · 29 Jan 2029
- SONAI CLARA · 30 Jan 2029
- Lodha Belmondo - Tower 32 · 28 Feb 2029
- GAIKWAD UNICO · 30 Mar 2029
- Aditya Vivaaz Project Three · 30 Apr 2029
- ARKAA GALAXY · 30 Apr 2029
- Fortune Flora · 30 Apr 2029
- GINI VIVANTE PHASE 03 · 30 Apr 2029
- Goodwill Palette I and J · 30 Apr 2029
- Harmony Heritage · 30 Apr 2029
- K Town Building B1, B2 and B3 · 30 Apr 2029
- Kesar Kalhaar · 30 Apr 2029
- MAGNUS EVOQ · 30 Apr 2029
- PARK WEST · 30 Apr 2029
- Parmar Supreme · 30 Apr 2029
- Prasiddhi Icon · 30 Apr 2029
- Raajwada Legacy · 30 Apr 2029
- SAI STELLA · 30 Apr 2029
- Shubharambh Clara · 30 Apr 2029
- SMRUTI GARDEN · 30 Apr 2029
- Sonigara Ekam · 30 Apr 2029
- Sukhwani Artize · 30 Apr 2029
- SWANANDI BLOSSOM PHASE 1 · 30 Apr 2029
- SWANANDI BLOSSOM PHASE 2 · 30 Apr 2029
- The Rising Phase - 2 · 30 Apr 2029
- THE SILVER ALTAIR · 30 Apr 2029
- Yashwin Gateway · 30 Apr 2029
- BLESSINGS · 30 Jun 2029
- IMPERIAL RESIDENCY · 30 Jun 2029
- SKY STORIES · 18 Jul 2029
- Ace Aster · 31 Jul 2029
- GURUKRUPA 7 AVENUE · 31 Jul 2029
- SAI AVENUE · 31 Jul 2029
- SHESHACHAL APARTMENTS · 31 Jul 2029
- BG ASPIRO · 30 Oct 2029
- GT Krushnakunj · 30 Oct 2029
- Little Earth, Kiwale - Building D1 · 30 Oct 2029
- Little Earth, Kiwale - Buildng D2 · 30 Oct 2029
- AROHI SKYLINE · 31 Dec 2029
- MIRACLE - II · 31 Dec 2029
- Santiago Skytown · 31 Dec 2029
- Skyway Elite · 31 Jan 2030
- LENORA · 25 Apr 2030
- Ashok Villas Grande · 30 Apr 2030
- Ashok Villas Imperial · 30 Apr 2030
- CRESTLINE SHRESHTH · 30 Apr 2030
- DOLPHIN PALMS WING A AND B · 30 Apr 2030
- Gurukrupa Vrundavan Phase 2 · 30 Apr 2030
- Millennium Amara Phase 2 · 30 Apr 2030
- NAVYAM · 30 Apr 2030
- NEXUS GENESIS · 30 Apr 2030
- SAI PALLADIUM · 30 Apr 2030
- SAI RATAN · 30 Apr 2030
- Sankalp Torezza · 30 Apr 2030
- SONIGARA CONCORD · 30 Apr 2030
- Sukhwani Coloronic Phase - III · 30 Apr 2030
- THE RISING PHASE-3 · 30 Apr 2030
- THE UNICORN BUILDING D · 30 Apr 2030
- VIONA · 30 Apr 2030
- YASHADA DREAMSONG · 30 Apr 2030
- Calistara Tower 1 · 30 May 2030
- AIKYAM · 31 Jul 2030
- RK AMOR · 31 Jul 2030
- Belmondo Townhouse 4 · 31 Aug 2030
- Calistara Tower 2 · 30 Sep 2030
- Calistara Tower 3 · 30 Sep 2030
- CAPRI · 30 Nov 2030
- HARICO DIVAAM TOWER 2 · 30 Dec 2030
- ELEMENTIS ORO · 31 Dec 2030
- iLife 6 · 31 Dec 2030
- Sukhwani Palmera Reserves Phase I · 31 Mar 2031
- 73 Park · 30 Apr 2031
- ARUN SANCTUM · 30 Apr 2031
- CITRINE · 30 Apr 2031
- CITY ONE PANACHE 2.O · 30 Apr 2031
- CITY ONE VIEORRA · 30 Apr 2031
- HARICO DIVAAM TOWER 1 · 30 Apr 2031
- JEFRO KINGSFORT · 30 Apr 2031
- KAYA · 30 Apr 2031
- MAHESHWARAM VRINDA PHASE-1 · 30 Apr 2031
- Mangalam Starview · 30 Apr 2031
- SAI KRIPA · 30 Apr 2031
- THE UNICORN BUILDING A WING A1 & A2 · 30 Apr 2031
- V-Uptown, A-wing · 30 Apr 2031
- GEO ARISTO · 30 Jul 2031
- Little Earth, Kiwale - Building B7 · 30 Aug 2031
- 101 · 31 Dec 2031
- AUSTIN IRA · 31 Dec 2031
- My Home Sanctuary Phase I · 31 Dec 2031
- Shaligram The Mile · 31 Dec 2031
- My Home Sanctuary Phase 2 · 30 Jun 2032
- Om Mangalam Samruddhi · 30 Aug 2032
- Renuka Brzee · 30 Apr 2033
- YASHADA EARTHSONG · 30 Apr 2034
- Vedant Heights · completed
- MAGIA AVENUE · completed
- LITTLE EARTH MASULKAR CITY PHASE 3 · completed
- V UPTOWN C WING · completed
- KK MARKS · completed
- Nirman Milestone · completed
- DOLPHIN GARIMA · completed
- ACE AURUM COMMERCIAL · completed
- PAVILION · completed
- Aradhya Apartments · completed
- addressOne - Phase 5 · completed
- SUKHWANI NYSA · completed
- Tukai Silver · completed
- NITYANAND HEIGHTS · completed
- OM PARADISE NX · completed
- PLATINUM PLAZA · completed
- AMARILLO TOWN · completed
- RA URBANIA · completed
- SHANKESHWAR PEARL · completed
- 97 SONIGARA BIZZ · completed
- ALPINE ASTONIA · completed
- Shivratna · completed
- GLORIOUS TATHASTU · completed
- Swastik Paradise · completed
- Aqua Life · completed
- OM MANGALAM DISHA · completed
- STAR VISTA - MHADA · completed
- PCMC EWS KIWALE · completed
- ROYAL PARK · completed
- SAMARTH COUNTY · completed
- Lodha Belmondo Townhouse 2 · completed
- Sunshine Apartments · completed
- GINI VIVANTE PHASE 01 · completed
- Lodha Belmondo - Tower 30 · completed
- OM MANGALAM YASH · completed
- VISION ALTIA · completed
- YASHADA WINDSONG · completed
- Lodha Belmondo St. Andrews A · completed
- K K MARKS B BUILDING · completed
- 7 VERVE · completed
- Swaraj Heights · 30 Jun 2024
- MAGIA AVENUE PHASE 1 · 27 Nov 2024
- TERRA GREENS · 29 Dec 2024
- Nilharsh DWARKA · 30 Apr 2025
- MUKTANGAN SHAILYAM · 6 May 2025
- BHALCHANDRA VIHAR PHASE-III/M1,M2 · 29 Jun 2025
- ESSENTIA · 30 Jun 2025
- SONIGARA PRESIDENCY PHASE II · 30 Jun 2025
- THE SILVER ALTAIR TOWER-D MHADA · 28 Jul 2025
- Neo 95 · 31 Jul 2025
- GURUKRUPA VRUNDAVAN · 30 Sep 2025
- MAITHILI SQUARE · 10 Oct 2025
- DIAMOND 1 · 30 Dec 2025
- Life Canvas Phase 1 · 30 Dec 2025
- 41 EVOKE BLDG C · 31 Dec 2025
- SHIVAM PRIDE · 31 Dec 2025
- VENKATESH PRIDE · 31 Dec 2025
- SHREE SADGURU HEIGHTS · 27 Jan 2026
- Yashodham · 31 Jan 2026
- BLUE BELL · 31 Mar 2026
- addressOne - Phase 6 · 30 Jun 2026
- Lotus Florina · 30 Jun 2026
- THE SKY TOWER · 30 Jun 2026
- Celestial City Phase II Building I, J, K · 30 Sep 2026
- CITY ONE SKYVE · 30 Sep 2026
- SHANTAI CLASSIC · 1 Oct 2026
- 41 EVOKE · —
- 41 EVOKE PHASE 1 · —
- AADITYA MALHAR · —
- addressOne - Phase 1 · —
- addressOne - Phase 2 · —
- addressOne - Phase 3 · —
- addressOne - Phase 4 · —
- ARUN AION · —
- ASTORIA ROYALS · —
- BALBOA AVENUE PHASE 1 · —
- BHALCHANDRA PROSPERA · —
- BHALCHANDRA VIHAR PHASE - I / A and B · —
- CITY ONE VEZDAA · —
- ELEGANCE PARK · —
Other areas in Pune
- Alandi Devachi · 450
- Chinchwadgaon · 370
- Wakad · 367
- Baner · 363
- Kothrud · 276
- Wagholi · 230
- N I B M · 210
- Armament · 193
- Kharadi · 188
- Katraj · 186
- Bhugaon · 170
- Hadapsar · 163
Data compiled by GharKundli (gharkundli.com) from MahaRERA public records. Projects are grouped by the pincode filed on MahaRERA.