Skip to content
GharKundli

MahaRERA projects in Baner, Pune (411045)

According to GharKundli's check of MahaRERA records, 363 housing projects are registered in pincode 411045 (Baner, Pune). 222 are still being built, 69 with possession due by the end of 2027. For 236, the completion date on MahaRERA is later than the one first promised. 131 have at least one complaint filed on MahaRERA.

Pincode 411045 also covers: Balewadi, Mahalunge, Mhalunge, Baner Pune, Baner South, Haveli.

“Possession due” is the latest completion date the builder has filed on MahaRERA; “first promised” is the date given at registration. Open a project for its full MahaRERA record.

ProjectMahaRERA statusPossession due (MahaRERA)First promisedComplaints
Godrej Green Cove
Mahalunge Township Developers Private Limited (Godrej)
Active30 Oct 2026passed30 Mar 20256
VTP Aethereus- Phase1
HOME RISING CONSTRUCTION LLP
Active30 Oct 2026passed30 Dec 202526
Solitaire Business Hub Baner
Atul Builders
Active6 Nov 2026passed30 Jun 202323
Estrella 45
Osian Diya Developers LLP
Active31 Dec 2026same0
Godrej Meadows- Phase 2
Mahalunge Township Developers Private Limited (Godrej)
Active31 Dec 202631 Dec 202583
Solitaire Business Hub -III, Phase- I, Baner
Baner Land Developers LLP
Active31 Dec 202630 Dec 202555
Solitaire Business Hub-III-Phase-II,Baner
BANER LAND DEVELOPERS LLP
Active31 Dec 202630 Dec 202527
Solitaire Business Hub-III-Phase-III,Baner
Baner Land Developers LLP
Active31 Dec 202630 Dec 202539
Westfield 23
GRD Westfield Realty LLP
Active31 Dec 202631 Dec 20240
YASHADA BUSINESS ZONE
Yashada Brothers
Active31 Dec 2026same0
17 East
Platinum Properties
Active30 Jan 202731 Mar 20260
DOWNTOWN
SAMARTTHA BUILDCON
Active30 Jan 202711 Apr 20227
GRACE AVENUE
TRIMURTHY NARAYAN
Active30 Jan 202731 Mar 20250
KAVISH RESIDENCY
DAMLE GANDHE LLP
Active30 Jan 20271 Apr 20260
SATYA RESIDENCY
MAKARAND PRABHAKAR WARUDKAR
Active30 Jan 202731 Mar 20250
Royal Fortune
Vivan Landmark
Active15 Feb 202730 Sep 20200
Rahul Altimus
Rahul Construction Company
Active28 Feb 202731 Oct 20260
SWASTIK MILAN
SWASTIKCONSTRUCTION
Active28 Feb 202712 Sep 20230
Godrej Hill Retreat 2
MAHALUNGE TOWNSHIP DEVELOPERS PRIVATE LIMITED (Godrej)
Active28 Mar 2027same4
REGENCY ASTRA PHASE II
Regency Aawishkar Sarsan Developers LLP
Active30 Mar 202730 Nov 20250
The Hillfront
Hublikar Constructions
Active30 Mar 202730 Nov 20260
ADVAIT AVENUE
Shree Nand Group
Active30 Apr 202731 Dec 20260
Amar Delta One
Delta Estates LLP
Active30 Apr 202731 Dec 20260
ANP NOVA
ANP LIFESPACES LLP
Active30 Apr 202731 Dec 20250
Apex Commerce Zone
Privis Realtors LLP
Active30 Apr 2027same0
Bellissima
Sandeep Jadhav
Active30 Apr 202731 Dec 20260
BOUGAIN STUDIO
AJITESH DEVELOPERS
Active30 Apr 202731 Dec 20260
BRAMHACORP TOWNHOUSE B
CONTIGO INFRASTRUCTURES LLP
Active30 Apr 202731 Dec 20260
CYPRUS OAK
S R S ENTERPRISES
Active30 Apr 202731 Dec 20260
Elegance Vega
Elegance Landmarks
Active30 Apr 202730 Jun 20260
GEN1
BISHNOI KALAMKAR CONSTRUCTIONS LLP
Active30 Apr 202731 Dec 20250
HERITAGE GOLD
Heritage Buildcon
Active30 Apr 202731 Dec 20250
Malhar Serenity
Malhar Developers AOP
Active30 Apr 202731 Aug 20250
NIRVANA
NIRMAN SKYLINES LLP
Active30 Apr 202720 Jun 20260
One Place Baner Phase III
NEW UNICON INFRAVENTURES LLP
Active30 Apr 202731 Dec 20260
RAAJAS
Jasraaj Realtors
Active30 Apr 202731 Dec 20260
Sufal
KUSHIKA SANJEEVANI DEVELOPERS AND ROHIT SANJAY DESHPANDE
Active30 Apr 202731 Dec 20260
The Canary Phase I
GROW INDIA NIRMITI LLP
Active30 Apr 202731 Dec 20261
The Shwet
Raichandani Constructions & Developers
Active30 Apr 202731 Dec 20240
UNIVIS
ELEGANT IOC
Active30 Apr 202731 Dec 20260
VASTU TULIPS
VASTU TULIPS DEVELOPERS
Active30 Apr 202731 Dec 20260
WESTFIELD 3
GRD INFRAPROJECTS PRIVATE LIMITED
Active30 Apr 202730 Jun 20240
AADHYA ANKOOR
ANKOOR DEVELOPERS
Active26 May 202726 Jan 20260
NYATI EMERALD II
NYATI BUILDERS PRIVATE LIMITED
Active28 Jun 202728 Feb 20270
VTP Sierra Phase1
PRASANNA DEVELOPERS
Active30 Jun 202730 Jun 202626
Aurum Icon
Tomaso Constructions Pvt.Ltd.
Active31 Jul 202731 Mar 20270
Ganga Business Tower
ROYAL METROVILLE VENTURE
Active31 Jul 2027same0
La Commercia
AUM HOUSING
Active31 Jul 202730 Sep 20220
REGENCY ASTRA PHASE IV
Regency Aawishkar Sarsan Developers LLP
Active31 Jul 202731 Mar 20270
SAARRTHI SKYBIZZ
Siddharth Properties
Active31 Jul 202731 Mar 20261

250 more projects

  1. SHREE SAMARTHA DAFFODILS · 31 Jul 2027
  2. Shrey Villas · 31 Jul 2027
  3. TREZA · 31 Jul 2027
  4. YOOVIE HOMES · 31 Jul 2027
  5. OM KRUSHNAY NAMAHA · 1 Aug 2027
  6. Avaneesh · 30 Aug 2027
  7. AARAMBH · 31 Aug 2027
  8. 37 GRANDSTAND · 30 Sep 2027
  9. NYATI EMERALD I · 30 Sep 2027
  10. SEVEN · 30 Sep 2027
  11. 45 Shashwat Urbano · 30 Oct 2027
  12. Comfort Zone Bliss · 30 Oct 2027
  13. DREAM GLORIOUS · 30 Oct 2027
  14. SHREEPATI HERITAGE · 30 Oct 2027
  15. Thorve House · 30 Oct 2027
  16. Westworld · 30 Oct 2027
  17. Tishya · 30 Nov 2027
  18. One 45 · 31 Dec 2027
  19. WESTWIND · 31 Dec 2027
  20. VIVANTA · 30 Jan 2028
  21. COURTYARD STUDIOS · 29 Feb 2028
  22. A4 THE EDGE · 30 Apr 2028
  23. ANISHKA AVENUE · 30 Apr 2028
  24. AVENUE PROMENADE · 30 Apr 2028
  25. BAYVIEW AVENUE · 30 Apr 2028
  26. EARTH 1 BY VTP LUXE PHASE 1 · 30 Apr 2028
  27. EMISPHERE · 30 Apr 2028
  28. GALAXIS BIZ PORT · 30 Apr 2028
  29. GURUKRUPA APARTMENTS · 30 Apr 2028
  30. Habitat-Wing C · 30 Apr 2028
  31. HARSH ISHA · 30 Apr 2028
  32. Jhamtani SpaceBiz · 30 Apr 2028
  33. Kumar Panache · 30 Apr 2028
  34. KUMAR PARTH TOWER C1 · 30 Apr 2028
  35. Lotus Serenity · 30 Apr 2028
  36. PANCARD BUSINESS HUB · 30 Apr 2028
  37. Pinewood Phase II · 30 Apr 2028
  38. Portia Grande · 30 Apr 2028
  39. QUEENS CASTLE · 30 Apr 2028
  40. RAANWA · 30 Apr 2028
  41. Rohan Ekam Phase 1 · 30 Apr 2028
  42. Spectrum Commercial Spaces · 30 Apr 2028
  43. The Canary Phase 2 · 30 Apr 2028
  44. The Canary Phase 3 · 30 Apr 2028
  45. VELVET VISTA · 30 Apr 2028
  46. X90 · 30 Apr 2028
  47. 33 Mayfair · 29 May 2028
  48. Godrej Hillside 3 · 28 Jun 2028
  49. 5 Maidan by Skyi · 30 Jun 2028
  50. BUSINESS HUB · 27 Jul 2028
  51. ICON ORO · 30 Jul 2028
  52. 28 PEARL · 31 Jul 2028
  53. Ambrosia Studio · 31 Jul 2028
  54. DWARKA · 31 Jul 2028
  55. KUMAR PARTH TOWER C 2 · 31 Jul 2028
  56. Right Barca Square · 31 Jul 2028
  57. SERENITY 7 · 30 Aug 2028
  58. Khyati Business Bay · 30 Sep 2028
  59. 7 BUSINESS BAY · 30 Oct 2028
  60. Bhagyoday · 1 Nov 2028
  61. 38 Daffodils · 6 Nov 2028
  62. ONE SPACE · 30 Dec 2028
  63. ATS - THE CONDOMINIUMS · 31 Dec 2028
  64. Merlin Ventana · 31 Dec 2028
  65. Namoville · 31 Dec 2028
  66. NYATI EMERALD III · 31 Dec 2028
  67. PLATINUM MARVELLE · 31 Dec 2028
  68. 24 Kalpavriksha · 1 Jan 2029
  69. EARTH 1 BY VTP LUXE PHASE 2 · 27 Feb 2029
  70. SIGNIS · 30 Mar 2029
  71. 17 INSIGNIA · 31 Mar 2029
  72. TEJELEVIA BUILDING - A,B · 24 Apr 2029
  73. TEJELEVIA BUILDING C · 24 Apr 2029
  74. 24 PALLOD FARM · 30 Apr 2029
  75. 27WEST · 30 Apr 2029
  76. Astral Residency · 30 Apr 2029
  77. CASA BONITA · 30 Apr 2029
  78. DREAM ELEGANCE · 30 Apr 2029
  79. Green Onyx · 30 Apr 2029
  80. ICON AVANZA · 30 Apr 2029
  81. INFINITO SERENO · 30 Apr 2029
  82. Jayka Synergy Tower · 30 Apr 2029
  83. KIRAN SOLISTIA · 30 Apr 2029
  84. MAJESTIQUE SIGNATURE TOWERS, BUILDING NO B, WING B6 · 30 Apr 2029
  85. Onyx Haus · 30 Apr 2029
  86. Palladio Balewadi Central Phase 2 · 30 Apr 2029
  87. Regency Astra Phase V · 30 Apr 2029
  88. Sai Canary A3 · 30 Apr 2029
  89. SKYVISTA · 30 Apr 2029
  90. Stalwart Business Enclave · 30 Apr 2029
  91. SUDATTA · 30 Apr 2029
  92. VERTICA PHASE 1 · 30 Apr 2029
  93. VERTICA PHASE 2 · 30 Apr 2029
  94. VERTICA PHASE 3 · 30 Apr 2029
  95. VISHNU · 30 Apr 2029
  96. WANDERING WINDS · 30 Apr 2029
  97. ZENISTRY- B · 30 Apr 2029
  98. DP FORCE TOWER · 30 May 2029
  99. ANANTASHREE · 30 Jun 2029
  100. Lumina Towers · 30 Jun 2029
  101. 24K Altura - Tower D · 31 Jul 2029
  102. Godrej River Royale · 31 Jul 2029
  103. MAHALUNGE RIVIERA C WING · 31 Jul 2029
  104. MANALI FALCON · 31 Jul 2029
  105. TWILIGHT · 31 Jul 2029
  106. UPTOWN BAY ONE · 31 Jul 2029
  107. EARTH 1 BY VTP LUXE PHASE 3 · 30 Aug 2029
  108. RIGHT PORTO SQUARE · 30 Sep 2029
  109. Dahlia · 30 Oct 2029
  110. The Balmoral Hillside - Commercial · 30 Oct 2029
  111. The Midas Residences Phase 1 · 30 Oct 2029
  112. SKYLINES · 30 Nov 2029
  113. Nancy Hill View B 1 · 31 Dec 2029
  114. TEJELEVIA BUILDING D & TEJONE BANER · 24 Jan 2030
  115. Kohinoor Business Tower-Baner · 15 Feb 2030
  116. Aruj Residency · 30 Mar 2030
  117. AVIKA RESIDENCES · 31 Mar 2030
  118. 1 PRESIDENTIAL SERENO BUILDING F · 30 Apr 2030
  119. Bonanza · 30 Apr 2030
  120. Elements · 30 Apr 2030
  121. GROWELL STAYS · 30 Apr 2030
  122. KIMAYA ONE · 30 Apr 2030
  123. Kohinoor Satori Mahalunge · 30 Apr 2030
  124. MARQIS PHASE 1 · 30 Apr 2030
  125. MONTAIRE · 30 Apr 2030
  126. Palladio LaViento · 30 Apr 2030
  127. The Balmoral Towers - Tower B, Phase III · 30 Apr 2030
  128. The Enclave · 30 Apr 2030
  129. The Midas Residences Phase 2 · 30 Apr 2030
  130. The Midas Residences Phase 3 · 30 Apr 2030
  131. THE ORNATE · 30 Apr 2030
  132. VTP Verve · 30 Apr 2030
  133. The Midas Residences Phase 5 · 30 Jun 2030
  134. Indeco Atrium · 31 Jul 2030
  135. Rohan Ekam Phase 2 · 31 Jul 2030
  136. VENKATESH TRESOR · 31 Jul 2030
  137. TOWER 1O8 · 30 Aug 2030
  138. VASUNDHARA AISHWARYAM · 31 Aug 2030
  139. KUMAR PARTH TOWER C3 · 30 Sep 2030
  140. Pune Baner Project-Tower 3 · 29 Oct 2030
  141. Achalare Business Capital · 30 Oct 2030
  142. The Midas Residences Phase 4 · 30 Oct 2030
  143. Crown 8 · 31 Dec 2030
  144. Livience Unione · 31 Dec 2030
  145. Nancy Hill View B-2 · 31 Dec 2030
  146. Kakkad Oneworld · 30 Jan 2031
  147. Rohan Ekam Phase 3 · 30 Jan 2031
  148. 24K Altura - Tower C · 30 Apr 2031
  149. Arvaana · 30 Apr 2031
  150. AVENUE CECILIA · 30 Apr 2031
  151. BotanIQ · 30 Apr 2031
  152. OMICRON COMMERZ BANER · 30 Apr 2031
  153. OMICRON F5 BUSINESS LANDMARKS · 30 Apr 2031
  154. PRIVILEGE STUDIOS · 30 Apr 2031
  155. RVK AMARA · 30 Apr 2031
  156. The Balmoral Towers - Tower A, Phase IV · 30 Apr 2031
  157. THE HAMPTONNS · 30 Apr 2031
  158. The Midas Residences Phase 6 · 30 Jun 2031
  159. ARION · 31 Jul 2031
  160. THE CANARY SKY OASIS PHASE 1 · 31 Jul 2031
  161. Sovrano · 30 Sep 2031
  162. SR HOUSE · 30 Sep 2031
  163. Raheja Vistas - T1 & T2 · 30 Nov 2031
  164. Raheja Vistas - T4 · 30 Nov 2031
  165. Raheja Vistas - T6 & T7 · 30 Nov 2031
  166. ULTIMATE · 31 Dec 2031
  167. ANP PRIVADO · 30 Jan 2032
  168. Pyramid Corporate Park · 30 Apr 2032
  169. FERNNVALE · 31 Dec 2032
  170. NEVER BEFORE MAHALUNGE PHASE 1 · 31 Dec 2032
  171. Dream Velmore · 30 Apr 2033
  172. Palladio Presidential Suites Balewadi RiverFront · 30 Apr 2033
  173. The Terraces Phase 2 · completed
  174. KALYANI HERITAGE · completed
  175. ESTIQUE B WING · completed
  176. GRIAD NEST · completed
  177. Godrej Hillside 1 · completed
  178. Godrej Hillside 2 · completed
  179. SPLENDID HOMES · completed
  180. VTPSolitaire Building C AND D · completed
  181. ONE PLACE BANER · completed
  182. ONE PLACE BANER PHASE II · completed
  183. Crystal Hills · completed
  184. PEARL EMINENT · completed
  185. VTP Leonara H building · completed
  186. Maruti Mansion · completed
  187. Alpha C · completed
  188. Kapil Grace · completed
  189. Metro Park County · completed
  190. REGENCY ASTRA PHASE I · completed
  191. BRENTWOOD · completed
  192. Global Tower · completed
  193. IMPERIAL MIST · completed
  194. VTP AETHEREUS HIGH STREET · completed
  195. PALAASH OAK PRIME · completed
  196. Satvik Villa · completed
  197. Godrej Green Vistas · completed
  198. CELESTIAL ONE · completed
  199. 204 BLUE PARADISE · completed
  200. Building A3 - VENICIA · completed
  201. PRIMUS B WING · completed
  202. PULSE · completed
  203. TruSpace Platina · completed
  204. Solitaire Business Hub Baner - II · completed
  205. ONE HQ · completed
  206. Anand Vihar · completed
  207. HERAMB · completed
  208. Kalpataru Jade Skyline · completed
  209. Manor · completed
  210. YASHADA JUBILEE HILLS · completed
  211. Radiance Residency · completed
  212. BRAMHACORP TOWNHOUSE A · completed
  213. BRAMHACORP TOWNHOUSE A1 · completed
  214. CHINTAMANI · completed
  215. KAIZEN · completed
  216. VTP SOLITAIRE PHASE 1 AB · 31 Oct 2023
  217. BALAJI RESIDENCY · 30 Jun 2024
  218. 45 BANER STREET · 30 Jul 2024
  219. Westlink · 31 Dec 2024
  220. PLATINUM GENX TOWER · 31 Mar 2025
  221. VTP TOWNSQUARE · 31 Mar 2025
  222. VINAYAK · 30 Apr 2025
  223. La Vida · 30 Jun 2025
  224. Vastu Kalash · 30 Jun 2025
  225. Saarrthi Skybay II · 30 Sep 2025
  226. AMBROSIA GALAXY · 30 Nov 2025
  227. Galaxy · 30 Nov 2025
  228. Krishna Residency · 31 Dec 2025
  229. Gagan Klara · 30 Mar 2026
  230. La commercia 4-9 · 31 Mar 2026
  231. NANDAN ACE · 31 Mar 2026
  232. Oriana Nest · 30 Jun 2026
  233. 66 HIGH STREET SQUARE · 30 Aug 2026
  234. 34 Western Pavillion · 11 Sep 2026
  235. 1 NEW CASTLE · 29 Sep 2026
  236. 24K Sereno Building E · —
  237. 24K Sereno Buildings C and D · —
  238. 99 RIVERFRONT · —
  239. AABHA · —
  240. AAIJI CAPITAL · —
  241. Aldea Annexo - C2 · —
  242. Aldea Espanola Phase VI · —
  243. Aldea Espanola Phase VIII · —
  244. AMAR INFINITY · —
  245. anantvenktesh · —
  246. ANNAPURNA · —
  247. ANP UNIVERSE · —
  248. ARIHANT RESIDENCY · —
  249. Atlantis · —
  250. BALAJI INFINITY · —

Other areas in Pune

All areas in Pune →

Data compiled by GharKundli (gharkundli.com) from MahaRERA public records. Projects are grouped by the pincode filed on MahaRERA.