Possession due in 2030 · Pune
According to GharKundli's check of MahaRERA records, 446 housing projects in Pune have a MahaRERA completion date in 2030, out of 4,233 Pune projects GharKundli has read in detail so far.
The date is the latest completion date the builder has filed on MahaRERA, including MahaRERA’s automatic 4-month extension of August 2026 where it applies. “First promised” is the date given at registration. Completed projects are not listed. Open a project for its full MahaRERA record.
| Project | Where | Possession due (MahaRERA) | First promised | Complaints |
|---|---|---|---|---|
| Mrunmayee CHS NIWAS ENTERPRISES | Kothrud | 1 Jan 2030 | 1 Sep 2029 | 0 |
| Smita Apartment Niwas Enterprises | Parvati | 1 Jan 2030 | 1 Sep 2029 | 0 |
| RACHANA HERITAGE Rachana Construction | Baramati | 20 Jan 2030 | 20 Sep 2029 | 0 |
| TEJELEVIA BUILDING D & TEJONE BANER TEJRAJ REALTORS LLP | Baner | 24 Jan 2030 | 24 Sep 2029 | 0 |
| Swami Samarth Apartment Alpha Green Realty | Kurkumbh MIDC | 26 Jan 2030 | 26 Sep 2029 | 0 |
| AASTHA HOUSING Viraj Pramod Tupe | Hadapsar | 30 Jan 2030 | 30 Sep 2029 | 0 |
| Anand Terrace PRAVIN KESHAV BADHEKAR | Kothrud | 30 Jan 2030 | 30 Sep 2029 | 0 |
| Ashiana Malhar Phase 4 Ashiana Housing Limited | Infotech Park (Hinjawadi) | 30 Jan 2030 | 30 Sep 2029 | 0 |
| Envisage Arma APC Housing LLP | Mundhva AV | 30 Jan 2030 | 30 Sep 2029 | 0 |
| Harmony Apartments Nanded City Development & Construction Co. Ltd. | Hadapsar | 30 Jan 2030 | 30 Sep 2029 | 0 |
| Hillcrest Manor NG Rathi Associates | Village : UNDRI-EXT | 30 Jan 2030 | 30 Sep 2029 | 0 |
| Joyville Celestia Phase 6 Joyville Shapoorji Housing Private Limited | Shewalewadi | 30 Jan 2030 | 30 Sep 2029 | 0 |
| Kothrud Pune -Tower A Lodha Developers Limited | Kothrud | 30 Jan 2030 | 30 Sep 2029 | 0 |
| MADHUNIRMAL TRISHA DREAM HOMES LLP | Ex. Serviceman Colony | 30 Jan 2030 | 30 Sep 2029 | 0 |
| Mango Tree Villa Tower 3 Palchin Real Estates Private Limited | Shewalewadi | 30 Jan 2030 | 31 Mar 2028 | 0 |
| MANTRA MAGNUS PHASE 8 Speciality Landmarks Private Limited | Mundhwa | 30 Jan 2030 | 30 Sep 2029 | 0 |
| Parkland 1 D Building Yashvastu Developers | Ghorpadi | 30 Jan 2030 | 30 Sep 2029 | 0 |
| QUE 154 A AND B WING UC Punawale Skyscrapers LLP | Chinchwadgaon | 30 Jan 2030 | 30 Sep 2029 | 2 |
| QUE 154 G WING UC Punawale Skyscrapers LLP | Chinchwadgaon | 30 Jan 2030 | 30 Sep 2029 | 0 |
| Smita Heights ASHWAMEDH SPACES PRIVATE LIMITED | Vanaz Kothrud | 30 Jan 2030 | 30 Sep 2029 | 0 |
| WEST VIEW CITY ETHERNAL LLP | Salisbury Park | 30 Jan 2030 | 30 Sep 2029 | 1 |
| Yugal Nirayan YUGAL BUILDERS | Shukrawar Peth | 30 Jan 2030 | 30 Sep 2029 | 0 |
| MADHUGHAT Ranjekar Realty LLP | Erandawane | 31 Jan 2030 | same | 0 |
| Skyway Elite SKYWAY BUILDER & DEVELOPERS | Pimpri | 31 Jan 2030 | same | 0 |
| Kohinoor Business Tower-Baner Revoluxe Estates LLP | Haveli | 15 Feb 2030 | 15 Oct 2029 | 0 |
| Kohinoor Kaleido-Phase-II Intofinity Promoters Private Limited | Vagholi | 15 Feb 2030 | 15 Oct 2029 | 3 |
| NEELRATNA Kotibhaskar Infrastructures &Developers Pvt.Ltd. | Shivajinagar Bhamburda | 24 Feb 2030 | 24 Oct 2029 | 0 |
| 24 Hill Crest B G Developers | kondwa Budruk | 28 Feb 2030 | 31 Oct 2029 | 0 |
| Alpine 21 Arise Associates | Tathwade | 28 Feb 2030 | 31 Oct 2029 | 0 |
| ANANTAM ARHAM LIFESPACES | Kothrud | 28 Feb 2030 | 31 Oct 2029 | 0 |
| Cocoon Homes Canvas Estates | Mulshi | 28 Feb 2030 | 30 Oct 2029 | 0 |
| Gulmohar Rama Erande and Associates | Sadashiv Peth | 28 Feb 2030 | 31 Oct 2029 | 1 |
| NYATI ELENOR NYATI BUILDERS PRIVATE LIMITED | Bibwewadi | 28 Feb 2030 | 30 Oct 2029 | 4 |
| Skyline Square Phase 1- Wing A Mulik Associates | Koregaon Bhima | 28 Feb 2030 | 30 Oct 2029 | 0 |
| YASHODHAN BELVALKAR REALTORS LLP | Deccan Gymkhana | 28 Feb 2030 | 30 Oct 2029 | 0 |
| Asha Park Shri Laxmi Narayan Properties LLP | Bibwewadi- Munjeri | 1 Mar 2030 | 1 Nov 2029 | 0 |
| Kumar Prosper Shree Venkatesh Vasturachana LLP | Dhayari | 19 Mar 2030 | same | 0 |
| Palmspring Towers - A8, A12 and B1 KUMAR KERING DEVELOPERS LLP | Undri | 27 Mar 2030 | 27 Nov 2029 | 0 |
| 11 SQUARE VARAD DEVELOPERS | Mahamadwadi | 30 Mar 2030 | 30 Nov 2029 | 0 |
| SAI CRYSTAL COURT Impact Builders and Developers | Vadgaonsheri | 30 Mar 2030 | same | 0 |
| AP4 Tech Park Amar Pristine Landmarks LLP | Wagholi | 31 Mar 2030 | same | 0 |
| AVIKA RESIDENCES BAGLA LAHOTI ASSOCIATES LLP | N.I.A. | 31 Mar 2030 | same | 0 |
| GANGA IMPERIA BLDG A GANRAJ HOMES LLP | Mohammadwadi Pune | 31 Mar 2030 | same | 0 |
| QUE 101 PHASE I ANNR Unique Realty LLP | Dighi Camp | 31 Mar 2030 | same | 0 |
| Vrundavan Raghukul Builders and Developers | Vadgaon Budruk | 31 Mar 2030 | same | 0 |
| Aqura Indraprastha Aqura Builder and Developer Private Limited | Rambag Colony | 1 Apr 2030 | same | 0 |
| MAGNACITY - Tower A2 Malnad Project (I) Pvt Ltd | Manjari | 1 Apr 2030 | 2 Dec 2028 | 0 |
| Oshan Vivara Oshan Constructions | Talegaon Dabhade | 1 Apr 2030 | 1 Dec 2029 | 0 |
| Shrihari Vishwa RAHUL BALASAHEB TARU | Khandobanagar | 1 Apr 2030 | same | 0 |
| Rivera Ekansh Buildcon LLP | Moshi | 2 Apr 2030 | 2 Dec 2029 | 0 |
| FORTUNE REVANTA M/S. SK FORTUNE GROUP | Dhayari | 5 Apr 2030 | 5 Dec 2029 | 2 |
| SANGHARSA APARTMENT BUILDING F ROHAN CONSTRUCTION | Pashan | 12 Apr 2030 | 12 Dec 2029 | 0 |
| Austin Yana AUSTIN REAL INFRA LLP | Tathwade | 16 Apr 2030 | 16 Dec 2029 | 3 |
| CITADEL RAM MULTICONS LLP | Kondhwa Bk | 18 Apr 2030 | 18 Dec 2029 | 0 |
| LENORA SAI SIDDHA ASSOCIATES | Kiwale | 25 Apr 2030 | 25 Dec 2029 | 0 |
| 18 Altitude GDSQUARE INFRA LLP | Chinchwad | 29 Apr 2030 | 29 Dec 2029 | 0 |
| 1 PRESIDENTIAL SERENO BUILDING F NOW Realty Promoters and Builders Private Limited | Baner | 30 Apr 2030 | 31 Dec 2029 | 0 |
| 10 Elite Akasa Kadam Jagtap Associates | Pimple Gurav | 30 Apr 2030 | 31 Dec 2029 | 0 |
| 33 Central Avenue Wing F-1 Eisha Properties Unit 5 | Tathwade | 30 Apr 2030 | 31 Dec 2029 | 2 |
| 5 RaceCourse By Skyi Phase III Enerrgia Skyi Landmarks | Wanawadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| AERO EAST - PH IV MIRACLE GURUKRUPA DEVELOPERS | Undri | 30 Apr 2030 | 31 Dec 2029 | 0 |
| AKSHAY GALAXY BUILDING A AND D A. P. BHANDARI DEVELOPERS | Yewalewadi Kondhwa Bk | 30 Apr 2030 | 31 Dec 2026 | 0 |
| Alephata Central Park SUV Developers | Alephata | 30 Apr 2030 | 31 Dec 2029 | 0 |
| ALLIANCE SARTHAK ALLIANCE BUILDCON | Dhayari | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Amarpuri Co Operative Housing Society Ltd Stargold Infrastructure LLP | Navsahyadri | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Ambiience Vivanta Ambiience Developers | Kondhwa Bk | 30 Apr 2030 | 31 Dec 2029 | 0 |
| AMIT ETERNITY AMIT CONSTRUCTIONS & SAIDHAN UDYOG SAMUH | katraj | 30 Apr 2030 | 31 Dec 2029 | 0 |
| AMRUTYOG RESIDENCY DEEPCHANDRA DEVELOPERS PRIVATE LIMITED | Charoli | 30 Apr 2030 | 31 Dec 2029 | 0 |
| ANANDI SAI DEVELOPERS | Kharadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| ANANT Mahagaja Developments | Rupeenagar | 30 Apr 2030 | 31 Dec 2029 | 0 |
| ARIA AURIGAA REALTORS | Punawale | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Arkaay Tower RAJWARDHAN GROUP | Chinchwadgaon | 30 Apr 2030 | 31 Dec 2032 | 0 |
| ARV Richvue WHITEHORSE INFRA LLP | Mundhwa | 30 Apr 2030 | 31 Dec 2029 | 0 |
| ASHIRWAD SAPPHIRE ASHIRWAD ENTERPRISES | Akurdi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Ashok Villas Grande Peninsula Land Limited | Near Address One | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Ashok Villas Imperial Peninsula Land Limited | Near Address One | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Ashtavinayak City Phase - 3 Ashtavinayak City Pune LLP | Haveli | 30 Apr 2030 | 31 Dec 2029 | 0 |
| AUDUMBAR BLISS ABS ASSOCIATES | Pimpri Chinchwad | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Audumber Prarthi Nest Vera Buildcon | Narhe | 30 Apr 2030 | 31 Dec 2029 | 0 |
| AURA KOLLECTIVE GM RANAWAT VENTURES | Bibwewadi Munjeri | 30 Apr 2030 | 30 Dec 2023 | 0 |
| Aura Waters Phase II Ranawat Properties | Vadgaon Bk | 30 Apr 2030 | 31 Dec 2029 | 1 |
| Aurapolis Krishna Choice Spaces LLP | Shivaji Nagar | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Avian Valley - Solaire KAKADE ESTATE DEVELOPERS PVT. LTD. | Mont Vert Road, Bhugaon | 30 Apr 2030 | 31 Dec 2029 | 0 |
| AVIKA ROYAL PARADISE AVIKA BUILDCON PVT. LTD | Pirangut | 30 Apr 2030 | 30 Dec 2029 | 0 |
| AVINEA PHASE 2 Viraj Pramod Tupe | Hadapsar | 30 Apr 2030 | 31 Dec 2029 | 0 |
| AVIRA THE PRIDE REALTY | Vadgaon Budruk | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Basil Krushnai Basil Built Landmark Private Limited | Ambegaon Khurd | 30 Apr 2030 | 31 Dec 2029 | 0 |
| BASIL MAXIMUS WING G BASIL AVANTE LLP | Punawale | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Basil Maximus Wing H Basil Avante LLP | Chinchwadgaon | 30 Apr 2030 | 31 Dec 2029 | 0 |
| BASIL MOUNT LORDS WING D TALJAI BASIL DEVELOPERS LLP | Near Bramhakumari Aashram Dhankwadi | 30 Apr 2030 | 31 Dec 2028 | 0 |
| BHOOMI ARCADIA BHOOMI BUILDCON | Mohammadwadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Bonanza Sunil G Infra Reality LLP | N.I.A. | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Bora Nova Stella Phase I Bora Properties | Kondhawa Budruk | 30 Apr 2030 | 31 Dec 2025 | 0 |
| Celestine B Wing Lotus Construction | Bavdhan | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Cloud 28 OREE REALITY PVT LTD | Near Song Bird Society | 30 Apr 2030 | 31 Dec 2029 | 0 |
| CRESTLINE SHRESHTH Crestline Realty LLP | Baner | 30 Apr 2030 | 31 Dec 2029 | 0 |
| CULLINAN M/s Garve Corporation | Pimple Nilakh | 30 Apr 2030 | 31 Dec 2029 | 2 |
| DARADE CHAVAN COMPLEX DARADE CHAVAN ASSOCIATES | Baramati | 30 Apr 2030 | 31 Dec 2029 | 0 |
| DLC WONDERNEST A Building GOODWILL INFRACON | Moshi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| DOLPHIN PALMS WING A AND B DOLPHIN REALTY | Dehu Road Cantt | 30 Apr 2030 | 31 Dec 2029 | 0 |
| DREAMS A WING DHANAYOGAM HOUSING & INFRASTRUCTURE PRIVATE LIMITED | Varalegaon | 30 Apr 2030 | 30 Dec 2029 | 0 |
| Eastern River Residency Wing B Kishor Shankar Garve | Pimple Gurav | 30 Apr 2030 | 31 Dec 2029 | 1 |
| Eco Shoppy 2.0 NAMRATA PROMOTERS AND BUILDERS | Near D Y Patil College | 30 Apr 2030 | 31 Dec 2029 | 0 |
| ELEMENT 77 VIKRANT MOHAN RISWADKAR | Mangalwar Peth | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Element Square LJM Estates LLP | Mundhwa | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Elements Star Pioneers Construction Private Limited | N.I.A. | 30 Apr 2030 | 31 Dec 2029 | 1 |
| ENVOGUE2 Zenethist Realty LLP | Akurdi | 30 Apr 2030 | 31 Dec 2029 | 2 |
| ETHIQUE EMPIRE ETHIQUE EMPIRE LLP | Baji Rao Road | 30 Apr 2030 | 30 Dec 2029 | 0 |
| EVARA RAJVI REALTY | Chovisawadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| EVOLVUS PHASE-III TOWNSHINE REALTIES PRIVATE LIMITED | Kharadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| GAIKWAD FLORIO GAIKWAD DEVELOPERS | Punawale | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Gandharv Gokulam Gandharv Corp | Hadapsar | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Ganesh Siddhi Phase 5 GANESHCONSTRUCTION | Chikhali | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Ganga Capitol One SHREE BALAJI ASSOCIATES PUNE LLP | Mundhva AV | 30 Apr 2030 | 31 Dec 2029 | 0 |
| GANGA IMPERIA COMMERCIAL GANRAJ HOMES LLP | Mohammadwadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Gokhale Park D S DEVELOPER | Chinchwad | 30 Apr 2030 | 31 Dec 2029 | 0 |
| GROWELL STAYS GROWELL COMMERCIAL SOLUTIONS | Baner | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Gurukrupa Vrundavan Phase 2 Kiran Rajendra Ghodke | Near Krishna Hotel, Kiwale | 30 Apr 2030 | 31 Dec 2029 | 0 |
| GV7 INSIGNIA BUILDING B AND C M/S CHIRAG DEVELOPERS | Ambegaon | 30 Apr 2030 | 31 Dec 2029 | 0 |
| HOLLYHOCK CITY BUILDING NO.5 WING E1 & E2 KATE MOZZE ASSOCIATES | Pimple Gurav | 30 Apr 2030 | 31 Dec 2029 | 0 |
| HQ1 KAKKAD SHAH PROMOTERS LLP | Mundhwa North | 30 Apr 2030 | 31 Dec 2029 | 0 |
| iBZ Hinjewadi Rising High Ventures | Rajiv Gandhi Infotech Park PH-II | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Infinia Avalon Sunil Wamanrao Shinde | Bavdhan | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Infinity Solaria Tulip Realty | Opp. Balaji Law College | 30 Apr 2030 | 31 Dec 2029 | 0 |
| IOS PRIME B1 LINUX GROUP | Tathwade | 30 Apr 2030 | 30 Dec 2029 | 0 |
| IRIS VIEW CHAKANKAR PROPERTIES | Mulshi | 30 Apr 2030 | 31 Dec 2026 | 0 |
| K K Market K K Construction | Alephata Near ST Bus Stand | 30 Apr 2030 | 31 Dec 2029 | 0 |
| K SHIRE PHASE 3 Unique Spaces LLP | Punawale | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Kamalini Dreamforge Ventures LLP | Shivaji Nagar-Bhamburda | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Karma Vibe Karmapro Developers LLP | Mundhwa-Keshavnagar | 30 Apr 2030 | 31 Dec 2029 | 0 |
| KIMAYA ONE M/s Kimaya Realities | Balewadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Kingston Aura Wing F and G Vedant Estates & Properties | Autade Handewadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Kohinoor Satori Mahalunge INTOFINITY PROMOTERS PRIVATE LIMITED | Mhalunge | 30 Apr 2030 | 31 Dec 2028 | 0 |
| KOHINOOR UPTOWN AVENUE MOONSTONE REALINFRA PRIVATE LIMITED | Punawale | 30 Apr 2030 | 30 Dec 2029 | 0 |
| KP SUPERNOVA KANIFNATH REALTORS | Opp Corianthan Club Mohammadwadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Krutarth Majestique Duropolis Pvt Ltd | Bibwewadi | 30 Apr 2030 | 31 Dec 2029 | 1 |
| KRUTIKA RESIDENCY WING B KRUSHNA RAMBHAU KHARADE | Pirangut | 30 Apr 2030 | 31 Dec 2029 | 0 |
| KUSUMANJALI Balaji Enterprises | S.P. College | 30 Apr 2030 | 31 Dec 2029 | 0 |
| LANDSON KEYS LANDSON KEYS | Moshi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Laxmi Vihar Laxmi Buildcon | Yashwant Nagar Talegaon Dabhade | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Legacy Milestone Infinity Associates | Punawale | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Life Republic Sector R34/34th Avenue - Duet/Phase I KOLTE-PATIL DEVELOPERS LIMITED | Jambhe & Nere | 30 Apr 2030 | 31 Dec 2029 | 2 |
| LOCAL SQUARE MUNDHWA CURATED LIVING SOLUTIONS PRIVATE LIMITED | Mundhawa | 30 Apr 2030 | 31 Dec 2029 | 0 |
| LORDS SAIRAJ SPACES | Pimpri P F | 30 Apr 2030 | 31 Dec 2029 | 0 |
| MALHAR AARAMBH Malhar Enterprises | Undri | 30 Apr 2030 | 30 Dec 2029 | 0 |
| MANGAL VASTU RUDVED BUILDTECH LLP | Vadgaonsheri | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Mantra Kharadi Phase 1 MANTRA LANDMARKS RESIDENCIES PRIVATE LIMITED | Dunkirk lines | 30 Apr 2030 | 31 Dec 2029 | 2 |
| MANTRA KHARADI PHASE 2 MANTRA LANDMARKS RESIDENCIES PRIVATE LIMITED | Bund Garden | 30 Apr 2030 | 31 Dec 2029 | 0 |
| MARIGOLD HEIGHTS VASTU DEVELOPERS | Chinchwad | 30 Apr 2030 | 31 Dec 2029 | 0 |
| MARQIS PHASE 1 BM BUILD SPACES LLP | N.I.A. | 30 Apr 2030 | 31 Dec 2029 | 0 |
| MEGH MALHAR RESIDENCY SUNGRACE INFRA PROJECTS | Manchar | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Meghsparsh D Wing Shri Venkatesh Sharada Alliance | Ambegaon khurd | 30 Apr 2030 | 31 Dec 2029 | 1 |
| MIAMI A4-A5 PRIDE BUILDERS LLP | Charholi Bk | 30 Apr 2030 | 31 Dec 2029 | 0 |
| MIAMI-A1-A2-A3-B2 PRIDE BUILDERS LLP | Shivaji Nagar | 30 Apr 2030 | 31 Dec 2029 | 1 |
| Millennium Amara Phase 2 Millennium Developers | Mamurdi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Millennium Samriddhi MILLENNIUM STRATEGIC PROMOTERS LLP | Punawale | 30 Apr 2030 | 31 Dec 2029 | 0 |
| MONARQUE BY VTP LUXE PHASE 1 MEXUS REAL ESTATE DEVELOPERS LLP | Hinjewadi | 30 Apr 2030 | 31 Dec 2029 | 4 |
| MONTAIRE ATRIUM LANDMARKS LLP | N.I.A. | 30 Apr 2030 | 31 Dec 2029 | 0 |
| MORYA SKYDALE ROYAL NISARG VENTURES LLP | Thergaon | 30 Apr 2030 | 30 Dec 2029 | 0 |
| NAKSHATRA PRAKASH REALTY | Daund | 30 Apr 2030 | 31 Dec 2029 | 0 |
| NAKSHATRA AROMA NITU ASSOCIATES | Shirur S.O (Pune) | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Namrata Manifesta NAMRATA DEVELOPERS | Punawale | 30 Apr 2030 | 30 Dec 2029 | 0 |
| Namrata Vasudha Namrata Construction Company | Ashok Nagar | 30 Apr 2030 | 31 Dec 2029 | 0 |
| NEEL-PRAKASH VAKRATUNDA REALTORS | Talegaon Dabhade | 30 Apr 2030 | 31 Dec 2029 | 0 |
| NEWTON HOME MUNDHWA Ravima Venture | Mundhwa | 30 Apr 2030 | 31 Dec 2029 | 0 |
| NEXUS GENESIS POLARIS DEVELOPERS | Kiwale | 30 Apr 2030 | 31 Dec 2029 | 0 |
| NHC One DHANANJAY NANA HINGANE | Dhayari | 30 Apr 2030 | 30 Dec 2029 | 0 |
| NISARG RESIDENCY WING C SHREE DATTAKRUPABUILDERS AND DEVELOPERS | Near Water Tank | 30 Apr 2030 | 31 Dec 2029 | 0 |
| OPULENCE TOWERS NABAR ASSOCIATES | Shivaji Nagar-Bhamburda | 30 Apr 2030 | 31 Dec 2027 | 0 |
| ORIANA WORLD PHASE 2 BALAJI BUILDERS | Chinchwadgaon | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Palladio LaViento Vilas Javdekar Eco Developers Pvt. Ltd. | Mhalunge | 30 Apr 2030 | 31 Dec 2029 | 2 |
| PARAMNAVNATH AVIKA FORTUNE REALTY LLP | Kothrud | 30 Apr 2030 | 30 Dec 2029 | 0 |
| Paras Parshwa Nagar II Shree Parshwa Nagar Realty LLP | Opp. Swami Vivekanand Garden | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Parkale Icon Om Infra | Near Sangam Bridge | 30 Apr 2030 | 31 Dec 2029 | 1 |
| PLATINUM CITYLIGHTS PHASE 2 GLOBAL PROPERTIES | Alandi Devachi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| PLATINUM TOWERS SAMARTHA LANDMARK | Manjari Farm | 30 Apr 2030 | 27 Aug 2027 | 0 |
| PRADNYESH PRIME SHREE RAM BUILDCON | Kharabwadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| PRADNYESH SHRINIWAS PHASE 2 JJ MAULI DEVELOPERS LLP | Kharabwadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Preetkunj B CHSL Chaphalkar Karandikar Developers | Shivaji Nagar | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Prime Vista BARMECHA DARDA ASSOCIATES LLP | Mohamadwadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Prime Vista Row Houses BARMECHA DARDA ASSOCIATES LLP | Mohamadwadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| PRISMCITY- BLUE Swastik Buildtech | Charholi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Pristine Commerce Street 2 KANHA DEVELOPERS | Moshi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| PRISTINE O2 WORLD PART 3 LOGIPARK WAREHOUSING LLP | Ubalenagar | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Privilege Hills C and D Building M/s Privilege Developers | Kondhwa Khurd | 30 Apr 2030 | 31 Dec 2029 | 0 |
| PWC Tigers Nest Phase I Enerrgia Skyi Developers | Bhugaon | 30 Apr 2030 | 31 Dec 2029 | 2 |
| R48 The Canopy PARANJAPE SPACES AND SERVICES PVT LTD | Bhugaon | 30 Apr 2030 | 31 Dec 2029 | 0 |
| RACHANA PRIVANA Rachana Developers | Moshi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| RADHAGAURI SANTOSH PANDURANG POKALE | Dhayari | 30 Apr 2030 | 31 Dec 2029 | 0 |
| RADHIKA RADISSON Shree Samarth Associates | Dighi Camp | 30 Apr 2030 | 31 Dec 2029 | 0 |
| RAJ KUNJ SATVIK HOMES | Rakshewadi Yelwadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| RAJLAXMI PRESTIGE RAJLAXMI DEVELOPERS | Warulwadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Rajveer Garima Phase 1 Waghere Associates | Wakad | 30 Apr 2030 | 31 Dec 2029 | 0 |
| RAMALAY M SQUARE LANDMARK | Dhankawadi , Laxminarayan Society | 30 Apr 2030 | 31 Dec 2029 | 0 |
| RAVIUMANG SUNIL RADHAKRISHAN ISRANI | Wadmukhwadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Real Enclave Realspace Construction | Lullanagar | 30 Apr 2030 | 31 Dec 2029 | 0 |
| ROHAN HARITA PHASE 3 ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED | Tathwade | 30 Apr 2030 | 31 Dec 2029 | 1 |
| SAHAJEEVAN West Pune Constructions LLP | Karve Nagar | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SAI PALLADIUM KRISHNA RAMA REALTORS | Ravet Pradhikaran | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SAI RATAN SAI ASSOCIATES | Dehu Road Cantt | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SAI SAHARA SHREE SAI VENTURES | Akurdi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SAI SOUKHYAM PARK KVB ENTERPRISES | Khandve Wasti | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SAI SUVARNA SHREE SAI BUILDCON | Chikhali | 30 Apr 2030 | 30 Jun 2028 | 0 |
| Samarth Paradise Phase 5 Vaibhav Hanumant Kawade | Jalochi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SAMARTH VISHVA B AND P DEVELOPERS | Vadgaon S.O (Pune) | 30 Apr 2030 | 30 Dec 2029 | 0 |
| Samrajya Wing GH Garve Patil Construction Company | Pimple Gurav | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Sankalp Torezza Dev Infracon | Bhondave Baug | 30 Apr 2030 | 30 Jun 2029 | 0 |
| Sarita Co-Operative Hsg Soc Ltd Sarita Co-Operative Housing Society Limited | Erandwane | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Serene Spaces NG Rathi Promoters | Wagholi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SHALIMAR SONIGARA VENTURES | Parvati | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Shankeshawar Gold Palace BPO Uprise Lifestyle | Raviwar Peth | 30 Apr 2030 | 30 Apr 2028 | 0 |
| Sharang DATTATRAY BHAGWANT WAGHERE | Pimpri Chinchwad | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Shere Palace High Yield Fortune Pvt. Ltd. | Shere | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SHIVNANDAN CITY Shivnandan Developers | Kasba | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Shivsrushti Market-1 Saishraddha Developers and Builders | Talegaon Dhamdhere | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SHRAVANI HEIGHTS SHREYASH ENGINEERS AND DEVELOPERS | Opp. Bagicha Hotel | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Shree Muktai Heights Mangesh Mahadev Bankar | Narayangaon | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SHREES KADAM PARADISE Narendra Maganlal Solanki | Dhankawadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Siddhi Vidyamrut Bhairav Promoters Unit 3 | Market Yard S.O (Pune) | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SIDDHIVINAYAKA GREEN ONE SIDDHIVINAYAK DEVELOPERS | Dhayari | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SIGNATURE PARK K L N BUILDINGS SHREE SONIGARA REALCON | Dange Chowk | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SILVER ORIANA SILVER ORIANA | Moshi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Silver Sunrise M/s. Aghanya Associates | Opp Nageshwar Vidhyalay | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SKY SUITES BY BRAMHACORP Bramhacorp Limited | Sangamwadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SKYRISE PRATHAMAKRUTI CONSTRUCTION LLP | Ambegaon Budruk | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SKYSQURE S J DEVELOPERS | Warje | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SOLITAIRE KOTHRUD B BUILDING BUILT TO LIVE REALTY DEVELOPMENT NO 1 LLP | Lokmanya Nagar | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SONIGARA CONCORD MADANLAL KESRIMAL SONIGRA | Ravet | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Sonigara Quorra Shree Developers | Chinchwad | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SPLENDOUR ASTERRA P S BUILDCON | Vagholi | 30 Apr 2030 | 30 Dec 2029 | 0 |
| Spring Valley Phase III SHUBH GANESH PROPERTIES | Wadhmukhwadi | 30 Apr 2030 | 31 Dec 2029 | 1 |
| STELLA A DMK INFRASTRUCTURE PRIVATE LIMITED | Near Axis Bank ,Saste Patil Park | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Sukhwani Celaeno Sukhwani Property Developers Through Proprietor Mr Suresh Totaram Sukhwani | Pimple Saudagar | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Sukhwani Coloronic Phase - III S. S. D. Construction | Ravet | 30 Apr 2030 | 31 Dec 2024 | 0 |
| SUMATI HEIGHTS RUSHABH REALTY | Shirur S.O (Pune) | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SURATWALA MARK PLAZZO- BUILDING C, D AND E SURATWWALA BUSINESS GROUP LIMITED | Infotech Park (Hinjawadi) | 30 Apr 2030 | 31 Dec 2027 | 1 |
| Swami Vishwa Heights Laxmi Developers | Alephata | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SWANAND RESIDENCY SHREEKRUPA ASSOCIATES | Dhankawadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Swapnapurti Park DS Construction | Jalochi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| SWARAJYA VC BACE CONSTROTECH LLP | Wadagaon | 30 Apr 2030 | 31 Dec 2029 | 0 |
| TANUSHREE SHREESHA LANDMARK TANUSHREE | Parvati North | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Terminal Two Avnee Landmarks LLP | Infotech Park (Hinjawadi) | 30 Apr 2030 | 31 Dec 2029 | 0 |
| THE COLLECTION - W5 AND W6 Bramhacorp Limited | Vadgaon Sheri | 30 Apr 2030 | 31 Dec 2029 | 0 |
| The Enclave Nahar Brothers Realtors Private Limited | Balewadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| The Hallmark Wings D, E/F M/s Prakash Associates | Charholi Budruk | 30 Apr 2030 | 31 Dec 2029 | 0 |
| THE HORIZON EMPIRE DEVELOPERS | Munjeri-Bibvewadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| The Latitude Phase 2 Ahura Builders | Kondhwa Khurd | 30 Apr 2030 | 31 Dec 2029 | 0 |
| The Lords Part 2 KANHA BUILDSPACES LLP | Pashan | 30 Apr 2030 | 31 Dec 2029 | 0 |
| The Midas Residences Phase 2 SELENITE PROPERTIES PRIVATE LIMITED | Balewadi | 30 Apr 2030 | 30 Jun 2028 | 0 |
| The Midas Residences Phase 3 SELENITE PROPERTIES PRIVATE LIMITED | Balewadi | 30 Apr 2030 | 30 Jun 2028 | 0 |
| THE ORCHIDS Surana Sanghvi Developers | Bavdhan | 30 Apr 2030 | 31 Dec 2029 | 0 |
| THE RAYA PHASE I SUNGUARD BUILDERS LLP | Wakad | 30 Apr 2030 | 31 Dec 2029 | 0 |
| The Reserve LJM ESTATES LLP | Mundhva AV | 30 Apr 2030 | 31 Dec 2029 | 0 |
| THE RISING PHASE-3 SANIKET BUILDCON | Kiwale | 30 Apr 2030 | 31 Dec 2029 | 0 |
| THE UNICORN BUILDING D DOLPHIN BUILDCON | Aundh Ravet Road | 30 Apr 2030 | 31 Dec 2029 | 0 |
| TRIMURTI SPHERE BINAWAT REALTY LLP | Trimurti House | 30 Apr 2030 | 31 Dec 2029 | 0 |
| TRITON RESIDENCY M/S SANKALP VASTU LLP | Vadgaonsheri | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Truston Aspen Vinode Wakadkar Buildcon | Wakad | 30 Apr 2030 | 31 Dec 2029 | 0 |
| TULSI AANGAN YASHODHA RISE GROUP | Wagholi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Tulsi Vrindavan YASHODHA ASSOCIATES AND COMPANY | Wagholi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| UDYAM NAGARI MORAYA GREENS | Chinchwad | 30 Apr 2030 | 31 Dec 2027 | 0 |
| UJWAL SHOURYA B WING C WING UJWAL CONSTRUCTION | Vadgaon Budruk | 30 Apr 2030 | 31 Dec 2029 | 1 |
| UMAKANT ENCLAVE Mayuresh Constructions | Autade Handewadi | 30 Apr 2030 | 25 Apr 2026 | 0 |
| UNI 89 WING B Mundhwa Infra LLP | Mundhva AV | 30 Apr 2030 | 31 Dec 2029 | 0 |
| UNI 89 WING C Mundhwa Infra LLP | Mundhva AV | 30 Apr 2030 | 31 Dec 2029 | 0 |
| UP-LIFE - PHASE - 6 - F - MAGENTA AVIOR SHELTERS LLP | Paud | 30 Apr 2030 | 30 Dec 2025 | 0 |
| VELORA M/s. PRIDE REALTY | Vadgaon Budruk | 30 Apr 2030 | 31 Dec 2029 | 0 |
| VIONA Trekaya Associates | Yamunanagar | 30 Apr 2030 | 31 Dec 2029 | 0 |
| VJ IndiWorks Kharadi Central Vilas Javdekar Eco Homes | Kharadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| VRUNDAVAN VIHAR NAMDEV DAMODAR KHENAT | Village- Saswad | 30 Apr 2030 | same | 0 |
| VTB RIVERIA Tanoj Digambar Borate | Borhadewadi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| VTP CIELO MHADA DELAS REALCON LLP | Bawdhan | 30 Apr 2030 | 31 Dec 2029 | 0 |
| VTP Verve PRASANNA DEVELOPERS | Sus | 30 Apr 2030 | 30 Jun 2026 | 8 |
| WESTGATE BUSINESS PARK BB SQUARE LLP | Infotech Park (Hinjawadi) | 30 Apr 2030 | 31 Dec 2029 | 0 |
| WYCE Exclucity E F I Saniket Infratech LLP | Bavdhan BK | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Wyng Manasara Realty LLP | Somwar Peth | 30 Apr 2030 | 31 Dec 2029 | 1 |
| YASHADA DREAMSONG YASHADA VIVANTA REALTY PVT. LTD. | Mamurdi | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Yashwin Enchante Phase 2 Vilas Javdekar Infinitee Developers Pvt. Ltd. | Wagholi | 30 Apr 2030 | 31 Dec 2029 | 1 |
| YOO ONE PHASE - II DASSCON REALTY PRIVATE LIMITED | Kondhwa Khurd | 30 Apr 2030 | 31 Dec 2029 | 0 |
| Golden Arcade M/s GKG Construction | Kondhwad Budruk North | 1 May 2030 | 1 Jan 2030 | 0 |
| SURAJ EKYUM SURAJ INFRA | Rajgurunagar | 1 May 2030 | 1 Jan 2030 | 0 |
| Calistara Tower 1 SATKAR PROPERTIES | Haveli | 30 May 2030 | same | 0 |
| Kaleidoscope R5 Misty greens Phase 3B KALEIDOSCOPE DEVELOPERS PVT. LTD. | Bhugaon | 31 May 2030 | 31 Jan 2030 | 2 |
| Lotus Treya Lotus Landmarks | Kothrud | 31 May 2030 | 31 Dec 2026 | 0 |
| PRESTIGE PLATINUM THE PRESTIGE GROUP | Saswad | 31 May 2030 | 31 Jan 2030 | 0 |
| Godrej River Crest Manjari Housing Projects LLP (Godrej) | Manjari Farm | 15 Jun 2030 | 30 Jun 2029 | 1 |
| Everland EVITA KRISALA TOWNSHIP LLP | Darumbare | 25 Jun 2030 | 25 Feb 2030 | 1 |
| Pune Baner Project-Tower 4 and 5 Goel Ganga Ventures India Private Limited | Baner | 29 Jun 2030 | 30 Jun 2029 | 2 |
| Dhvanil Harmony Dhvanil Associates LLP | Haveli | 30 Jun 2030 | same | 0 |
| JAIJINENDRA NILAY Jaijinendra Shreekalp | Near Laxmi chowk | 30 Jun 2030 | same | 0 |
| Landmarc Saheel Buildvision Private Limited | Infotech Park (Hinjawadi) | 30 Jun 2030 | same | 0 |
| Mizura Residences by Esbee Esbee Greenspaces LLP | Manjari Farm | 30 Jun 2030 | same | 0 |
| SUKHWANI GEMZS Prime Properties | Aundh | 30 Jun 2030 | same | 0 |
| THE EMBASSY NORTHERN GATES REALTY PRIVATE LIMITED | Sadashiv Peth | 30 Jun 2030 | same | 0 |
| The Midas Residences Phase 5 SELENITE PROPERTIES PRIVATE LIMITED | Balewadi | 30 Jun 2030 | same | 0 |
| Joy on The Tree Tops Project A Gera Projects Private Limited | Rajiv Gandhi Infotech Park Phase III | 3 Jul 2030 | 3 Mar 2030 | 2 |
| Palmspring Towers - A9, A10 and A11 KUMAR KERING DEVELOPERS LLP | Undri-Ext | 20 Jul 2030 | same | 0 |
| 9 TARA CREST SRICHAITANYA SPACE PRIVATE LIMITED | Ghorpadi Gaon | 31 Jul 2030 | 31 Mar 2030 | 0 |
| Ace Abundance JHAMTANI REALTY PRIVATE LIMITED | Mundhwa | 31 Jul 2030 | 31 Mar 2030 | 0 |
| ADITYA SHUBHAM Aditya Properties | Bhusari Colony | 31 Jul 2030 | 31 Mar 2030 | 0 |
| AIKYAM URWAY INFRA LLP | Chinchwad | 31 Jul 2030 | 31 Mar 2029 | 0 |
| Arise Capital Vinode Wakadkar Buildcon LLP | Mouje-Wakad | 31 Jul 2030 | 31 Mar 2030 | 0 |
| Ashiana Amodh Phase 3 Ashiana Housing Limited | Gram Panchayat | 31 Jul 2030 | 31 Mar 2030 | 0 |
| Evara Loyalstone Reality | Vadagaon Budruk | 31 Jul 2030 | 31 Mar 2030 | 0 |
| GANGA GENESIA VARDAAN LIFESTYLE LIMITED | Pulachiwadi | 31 Jul 2030 | 31 Mar 2030 | 0 |
| GD PRIDE G.D. ASSOCIATES | Shirur | 31 Jul 2030 | 31 Mar 2030 | 0 |
| Indeco Atrium Indeco Enterprises | Balewadi | 31 Jul 2030 | 31 Mar 2030 | 0 |
| Indeco Tech Park Indeco Developers | Mundhwa | 31 Jul 2030 | 31 Mar 2030 | 0 |
| Kamalraj Indradhanu A Building KAMALRAJ REALTORS | Near Sai Bazar | 31 Jul 2030 | 31 Mar 2030 | 0 |
| Kharadi New Project - Tower 1 Lodha Developers Limited | Wagholi | 31 Jul 2030 | 31 Mar 2030 | 0 |
| KHARADI NEW PROJECT - TOWER 3 Lodha Developers Limited | Wagholi | 31 Jul 2030 | 31 Mar 2030 | 0 |
| Kharadi New Project -Tower 2 Lodha Developers Limited | Wagholi | 31 Jul 2030 | 31 Mar 2030 | 0 |
| KHARADI NEW PROJECT -TOWER 4 Lodha Developers Limited | Wagholi | 31 Jul 2030 | 31 Mar 2030 | 0 |
| Muktangan Kimaya MUKTANGAN KIMAYA REALITIES LLP | Pimple Saudagar | 31 Jul 2030 | 31 Mar 2030 | 0 |
| NAV RAHUL Gangotree Homes | Deccan Gymkhana | 31 Jul 2030 | 31 Mar 2030 | 0 |
| Pioneer Lumina Pioneer Buildcon | Near Radcliff School | 31 Jul 2030 | 31 Mar 2030 | 0 |
| RK AMOR RK INFRA & REAL ESTATE-MAMURDI | Pimpri Chinchwad | 31 Jul 2030 | 31 Mar 2030 | 0 |
| Rohan Ekam Phase 2 ROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED | Balewadi | 31 Jul 2030 | 31 Mar 2030 | 0 |
| S R PARK PHASE 7 S R GROUP PROMOTER AND BUILDERS | Mouje Jalochi Baramati | 31 Jul 2030 | 31 Mar 2030 | 0 |
| S R TOWER PHASE 8 S R GROUP PROMOTER AND BUILDERS | Mouje – Baramati | 31 Jul 2030 | 31 Mar 2030 | 0 |
| Sai Datta VARADVINAYAK BUILDERS AND DEVELOPERS | Ale | 31 Jul 2030 | 31 Mar 2030 | 0 |
| Sai Shrushti sai samarth developers | Fursungi | 31 Jul 2030 | same | 0 |
| Stellaris UNITARY CITYSPACE PRIVATE LIMITED | Mohammadwadi | 31 Jul 2030 | 31 Mar 2030 | 0 |
| Sun Platina Jindal Mittal Graha Nirman Pvt. Ltd. | Koregaon Park Annex | 31 Jul 2030 | 31 Mar 2030 | 1 |
| T4A named Celina of Raheja Galaxy in RV Premiere CAVALCADE PROPERTIES PVT LTD (Raheja) | Nibm | 31 Jul 2030 | 31 Mar 2030 | 0 |
| THE EVERETT SERIANEE CORRP LLP | Bibwewadi | 31 Jul 2030 | 31 Mar 2030 | 0 |
| VENKATESH TRESOR SVB LANDMARKS PRIVATE LIMITED | Baner | 31 Jul 2030 | 31 Mar 2030 | 0 |
| VIGHNAHARTA PANDIT NANABHAU MOLAK | Dehu | 31 Jul 2030 | 31 Mar 2030 | 0 |
| UPTOWN PLAZA GREENESTPR BUILDCON LLP | Katraj | 1 Aug 2030 | same | 0 |
| Malgunde Icon MALGUNDE BALGUDE DEVELOPERS | Jalochi | 8 Aug 2030 | 8 Apr 2030 | 0 |
| 24 Aanand P2 BJ Constructions | Shirur S.O (Pune) | 30 Aug 2030 | 30 Apr 2030 | 0 |
| Euphoric Blossom Euphoric Developers LLP | Hadapsar | 30 Aug 2030 | 30 Apr 2030 | 0 |
| LIFE REPUBLIC SECTOR R14/14TH AVENUE - QRIOUS/PHASE - I KOLTE-PATIL DEVELOPERS LIMITED | Jambe and Nere | 30 Aug 2030 | 30 Apr 2030 | 1 |
| MADHURA BELVALKAR VENTURES LLP | Erandwane | 30 Aug 2030 | 30 Apr 2030 | 0 |
| Rayat Regency SOHAM CONSTRUCTIONS AND DEVELOPERS | Shirur | 30 Aug 2030 | same | 0 |
| Tathastu Aura Shree Bhagwati Infrastructure | Near Radiclip School | 30 Aug 2030 | 30 Apr 2030 | 0 |
| TOWER 1O8 M/S CERATEC REALTORS | N.I.A. | 30 Aug 2030 | 30 Dec 2029 | 0 |
| Belmondo Townhouse 4 Lodha Developers Limited | Gahunje | 31 Aug 2030 | same | 0 |
| VASUNDHARA AISHWARYAM VASUNDHARA BUILDSPACE PRIVATE LIMITED | Village-Balewadi | 31 Aug 2030 | same | 0 |
| VENKATESH VANAYA - WING – N (MHADA)- PHASE - 8 SVBPL HOMES PVT LTD | Kharadi West | 31 Aug 2030 | same | 0 |
| MAHALAXMI ELEGANCE MAHALAXMI CONSTRUCTION | Undri | 1 Sep 2030 | same | 0 |
| YASHASHRI POORTI CO OP HOUSING SOCIETY D&T PROPERTIES UNIT-5 | Mahendale Garage Erandwana | 1 Sep 2030 | same | 0 |
| Calistara Tower 2 SATKAR PROPERTIES | Haveli | 30 Sep 2030 | 30 May 2030 | 0 |
| Calistara Tower 3 SATKAR PROPERTIES | Haveli | 30 Sep 2030 | 30 May 2030 | 0 |
| F5 SKYRA Anand Construction Company | Ghorpadi | 30 Sep 2030 | same | 0 |
| GANRAJ SUKHADA GANRAJ REALTY | Urli Devachi | 30 Sep 2030 | 31 May 2030 | 0 |
| KUMAR PARTH TOWER C3 KUMAR & POTNIS CONSTRUCTIONS LLP | Baner | 30 Sep 2030 | 31 May 2030 | 1 |
| SILVERISE RADIANT TOWER SILVERISE RADIANT TOWER LLP | Moshi | 30 Sep 2030 | 31 May 2030 | 0 |
| VRAJA VILAS TOWER SUPRA HOME PRIVATE LIMITED | Someshwarwadi | 30 Sep 2030 | 31 May 2030 | 0 |
| LAXMI GREENS DARSHEEL BUILDCON | Ambegaon Budruk | 1 Oct 2030 | 1 Jun 2030 | 0 |
| KONBIL TRINITY Konbil Baner Project LLP | Armament | 10 Oct 2030 | 10 Jun 2030 | 0 |
| Kohinoor Regalia Towers Godiva Buildcon Private Limited | Wakad | 15 Oct 2030 | 15 Jun 2030 | 0 |
| AVENTIS DEVSIA INFRACON LLP | Pawar Nagar Dattawadi | 21 Oct 2030 | 21 Jun 2030 | 0 |
| Pune Baner Project-Tower 3 Goel Ganga Ventures India Private Limited | Baner Street | 29 Oct 2030 | 30 Jun 2029 | 0 |
| Achalare Business Capital Achalare Realtors Pvt Ltd | Baner | 30 Oct 2030 | 30 Jun 2030 | 0 |
| Amardeep Jyoti CHSL Prathamesh Constructions | Erandwane | 30 Oct 2030 | 30 Jun 2030 | 0 |
| Blueroof Sylva SS Properties | Sus | 30 Oct 2030 | 30 Jun 2030 | 0 |
| Building B3 Eon Homes Hinjawadi Infradevelopment Pvt Ltd | Hinjawadi Phase III | 30 Oct 2030 | 30 Jun 2030 | 0 |
| Elixir - Phase I KOLTE-PATIL DEVELOPERS LIMITED | Kondhwa Khurd | 30 Oct 2030 | 30 Jun 2030 | 0 |
| Empress Greens Anand Landmarks | Canal Road | 30 Oct 2030 | 31 Mar 2026 | 1 |
| F Signature Esvee Dream Homes LLP, Essen Landmarks | Punawale | 30 Oct 2030 | 30 Jun 2030 | 0 |
| F-Signature By Aishwaryam Essen Land Marks, Esvee Dream Homes LLP | Punawale | 30 Oct 2030 | 30 Jun 2030 | 0 |
| GUNESH INFINITO INFINITO REALTORS | Pimpri- Waghere | 30 Oct 2030 | 30 Jun 2030 | 0 |
| KOOL HOMES SOLITAIRE PHASE III REPTON PROPERTIES PRIVATE LIMITED | Kondhwa | 30 Oct 2030 | 30 Jun 2030 | 0 |
| LUXTON Neev Sai Developers | Wakad | 30 Oct 2030 | 30 Jun 2030 | 2 |
| Millefiori Futuristic Homes | Wakad | 30 Oct 2030 | 30 Jun 2030 | 0 |
| NB EVO PLAZA Yashada Holdings | Chinchwadgaon | 30 Oct 2030 | 30 Jun 2030 | 2 |
| Neco Park Central Vasupujya Realtor | Near Bollywood Multiplex | 30 Oct 2030 | 30 Jun 2030 | 0 |
| Park Pebbles Phase I M/s Rainbow Purple Construction LLP | Mouje-Bhugaon | 30 Oct 2030 | 30 Jun 2030 | 0 |
| SENTOSA EDGE SHREE BALAJI ASSOCIATES | Chinchwadgaon | 30 Oct 2030 | 30 Jun 2030 | 0 |
| Shankeshwar World Nitin Chhaganlal Jain | Rajgurunagar | 30 Oct 2030 | 30 Jun 2030 | 0 |
| Shubh Anugraha Wing A Bramhand World Realty LLP | Charholi Khurd | 30 Oct 2030 | 30 Jun 2030 | 0 |
| Shubh Anugraha Wing B Bramhand World Realty LLP | Charholi Khurd | 30 Oct 2030 | 30 Jun 2030 | 0 |
| The Midas Residences Phase 4 SELENITE PROPERTIES PRIVATE LIMITED | Camp | 30 Oct 2030 | 30 Jun 2030 | 0 |
| The Privve Mansion Creators | Tathawade | 30 Oct 2030 | 30 Jun 2030 | 0 |
| THE STACKS DHALWANI INFRA LLP | N I B M | 30 Oct 2030 | 30 Jun 2030 | 0 |
| TRANQUIL V & J DEVELOPERS | Wagholi | 30 Oct 2030 | 30 Jun 2030 | 0 |
| VANAHA VERDANT MAHOGANY I & II IMAGE REALTY PRIVATE LIMITED | Lavale | 30 Oct 2030 | 30 Jun 2030 | 1 |
| NEOWORLD M/S. SPARKLE REALTY | Lohogaon | 31 Oct 2030 | same | 0 |
| Belview Tranquil Infratech LLP | Mulshi | 1 Nov 2030 | 1 Jul 2030 | 0 |
| Sagar Co-operative Housing Society VAIDYA GROUP CONSTRUCTION | Near Green Field Society | 19 Nov 2030 | same | 0 |
| ALTAMIRA BY VTP LUXE PHASE 1 MERCULUS CONSTRUWELL PRIVATE LIMITED | Ubale Nagar | 30 Nov 2030 | 31 Jul 2030 | 5 |
| CAPRI Knest Constructions LLP | Ravet | 30 Nov 2030 | 31 Jul 2030 | 0 |
| EH SKY TOWER EH REALITY LLP | Bavdhan | 30 Nov 2030 | 30 Jul 2030 | 0 |
| Flamingo Park Riverview City Constructions Ltd | Hadapsar | 30 Nov 2030 | 31 Jul 2030 | 0 |
| Kiran Sora Kiran Creators and Developers Private Limited | Armament | 30 Nov 2030 | 30 Jul 2030 | 0 |
| MOUNT KUSUR PHASE 1 CLARKS LEISURE PRIVATE LIMITED | Kusur Village | 30 Nov 2030 | 31 Jul 2030 | 0 |
| NYATI ESTEBAN III NYATI REALTORS LLP | Undri | 30 Nov 2030 | same | 0 |
| Skyi Park Phase II Enerrgia Skyi Ventures | Bhukum | 30 Nov 2030 | 31 Jul 2030 | 1 |
| Livience Aleenta Phase III LIVIENCE LIFESPACE PRIVATE LIMITED | Pashan | 1 Dec 2030 | same | 0 |
| Valeentina Tower Velentina 7 Buildcon LLP | Vadgaon BK | 1 Dec 2030 | same | 1 |
| HARICO DIVAAM TOWER 2 SENTOSA LANDMARKS | Behind Sentosa Resort, Kiwale | 30 Dec 2030 | same | 0 |
| SIGMA CENTURIA PHASE II SIGMA2 BUILDZONE LLP | Fursungi | 30 Dec 2030 | same | 0 |
| Sky Eloria Royal Realty | Pimpri Colony | 30 Dec 2030 | same | 0 |
| 31 Palma Drive Phase 2 Sagar Construction Company | Wagholi | 31 Dec 2030 | same | 0 |
| Advika Phase IV-C ADVIKA CONSTRUCTIONS PRIVATE LIMITED | Pisoli | 31 Dec 2030 | same | 0 |
| AMALTAS ENCLAVE SSP Infraspaces LLP | Lohgaon | 31 Dec 2030 | same | 0 |
| Anushree sahakari Gruhrachana Sanstha Maryadit. TRISHA DEVELOPERS | Erandwane South | 31 Dec 2030 | same | 0 |
| Atharva Aura Hira Developers | Khadakwasla R.S. | 31 Dec 2030 | same | 0 |
| Badhekar Horizon PRAVIN KESHAV BADHEKAR | Kothrud | 31 Dec 2030 | same | 0 |
| Belmont Skyone Belmont Realtech LLP | Lohgaon | 31 Dec 2030 | same | 0 |
| Crown 8 Pyramid Alliance LLP | Dasara Chowk | 31 Dec 2030 | same | 0 |
| DYNAMIC SOLITAIRE – PHASE II DYNAMIC REALTY ENTERPRISES | Undri | 31 Dec 2030 | same | 0 |
| EAST WORLD PHASE III SANKLA-MAHADIK REALTY | Bund Garden Road | 31 Dec 2030 | same | 0 |
| ELEMENTIS ORO Adi Homes | Ravet Pradhikaran | 31 Dec 2030 | same | 0 |
| Evexia Exotica Sankalp Infra | Moshi | 31 Dec 2030 | same | 0 |
| GANGA AVANTA A2 SOHAM ASSOCIATES | Mundhwa South | 31 Dec 2030 | same | 0 |
| GANGA NEWTOWN PH 6 F BLDG SHREE BALAJI ASSOCIATES PUNE LLP | Camp | 31 Dec 2030 | same | 0 |
| Geras Isle Royale Tower 4 and 5 Gera Developments Private Limited | Bavdhan | 31 Dec 2030 | 30 Apr 2024 | 0 |
| GREEN HIVE PLUS WING A6 Ram India Shelters | Phursungi | 31 Dec 2030 | 31 Aug 2030 | 0 |
| iLife 6 ICONIC LEGACY GROUP | Ravet | 31 Dec 2030 | same | 0 |
| Jhamtani BizOne JHAMTANI REALTY PRIVATE LIMITED | Dwarkadheesh Gardens, Rahatani | 31 Dec 2030 | same | 0 |
| KAMAL BAUG SAPTARSHI BUILDCON | Bhujbal Mala Pabal Chowk | 31 Dec 2030 | 25 Dec 2028 | 0 |
| LEELA HEIGHTS VISHAL PROPERTIES | Wakad | 31 Dec 2030 | 28 Dec 2024 | 0 |
| Legacy Highpoint INFINITYNX REALTORS LLP | Punawale | 31 Dec 2030 | same | 0 |
| Livience Unione LIVIENCE LIFESPACE PRIVATE LIMITED | Baner | 31 Dec 2030 | same | 0 |
| Maavi Shree Ashirwad Maavi Spaces Unit 1 | Kothrud South | 31 Dec 2030 | 31 Dec 2027 | 0 |
| MAGNUS AB ASWANI REALTY NEXUS LLP | Pimpale Saudagar | 31 Dec 2030 | same | 0 |
| MAYUR GEMINUS WING A BUNTY PROPERTIES UNIT NO. XI | Hadapsar | 31 Dec 2030 | same | 0 |
| MAYUR SKYLIFE BUNTY HOMES | Dapodi | 31 Dec 2030 | same | 0 |
| NAKSHATRA ANGAN C BUILDING SARVESH REALTY | Urawade | 31 Dec 2030 | same | 0 |
| Nancy Hill View B-2 M/S SARSAN AAWISHKAR PROPERTIES | Baner | 31 Dec 2030 | same | 0 |
| PASHANKAR WAVES Pashankar Buildcon | Wakad | 31 Dec 2030 | same | 0 |
| POLARIS The Excellaa | Bavdhan Khurd | 31 Dec 2030 | same | 0 |
| Pyramid Parkland Nxt Pyramid Lifestyle Limited | Bhukum | 31 Dec 2030 | same | 0 |
| RAJMUDRA NAGARI HERITAGE BROTHERS CONSTRUCTION | Fursungi | 31 Dec 2030 | same | 0 |
| Rezo Phase 1 Triaa Square LLP | Mohammadwadi | 31 Dec 2030 | same | 1 |
| SARA OASIS JAGRUTSARA STRUCTURES LLP | Dudhulgaon | 31 Dec 2030 | same | 0 |
| SARASNAGAR CITY ETHERNAL LLP | S.P. College | 31 Dec 2030 | same | 4 |
| SHRIRAM VANDAN VISION PROPERTIES | Dhayari | 31 Dec 2030 | same | 0 |
| Shubh Veda Tower D UPSQUARE VENTURES LLP | Pune (M.Corp) | 31 Dec 2030 | same | 0 |
| SHUBH VEDA Tower E F G and Block 8 UPSQUARE VENTURES LLP | Akurdi | 31 Dec 2030 | same | 0 |
| Siddhi Safalya Bhairav Promoters Unit 5 | Guruwar Peth | 31 Dec 2030 | same | 0 |
| SKYGREEN NEST SKYGREEN NEST LLP | Kasba | 31 Dec 2030 | same | 0 |
| SUN APEX Jindal Mittal Graha Nirman Pvt. Ltd. | Sadashiv Peth | 31 Dec 2030 | same | 0 |
| SWAMI KEDAR Swamiraj Creators | N I B M | 31 Dec 2030 | same | 0 |
| Tarangan SM Mahalaxmi Infra LLP | Shikshak Colony | 31 Dec 2030 | 31 Aug 2030 | 0 |
| The Element THE 5 ELEMENTS | Vagholi | 31 Dec 2030 | same | 0 |
| TOPAZ TOWERS PH-II AG Ventures | Wadmukhwadi | 31 Dec 2030 | same | 0 |
| Urban Nest GM Ventures | Katavi | 31 Dec 2030 | same | 0 |
| V Top VELESTA V-Top Developers | Chinchwadgaon | 31 Dec 2030 | same | 0 |
| VANDAN KNK REAL ESTATE | N I B M | 31 Dec 2030 | same | 0 |
| VARDHAMAN SKYSYMPHONY VARDHAMAN PROPERTIES | Bhujbal Parkhe Wasti | 31 Dec 2030 | same | 3 |
| VENKATESH VANAYA-WING-D-PHASE -5 SVBPL HOMES PVT LTD | Kharadi West | 31 Dec 2030 | 31 Aug 2030 | 0 |
| VTP SKYLIGHTS MHADA M/S. PRASANNA DEVELOPERS | Gultekadi | 31 Dec 2030 | same | 0 |
| Yash Residency Phase 2 “A Wing” SHREE DHARESHWAR BUILDERS | Pashan | 31 Dec 2030 | same | 0 |
Other years in Pune: 2026 (360) · 2027 (910) · 2028 (867) · 2029 (707) · 2031 (298)
Source: GharKundli’s check of MahaRERA records. More projects appear as GharKundli reads them.