Skip to content
GharKundli

Possession due in 2026 · Pune

According to GharKundli's check of MahaRERA records, 360 housing projects in Pune have a MahaRERA completion date in 2026, out of 4,233 Pune projects GharKundli has read in detail so far.

The date is the latest completion date the builder has filed on MahaRERA, including MahaRERA’s automatic 4-month extension of August 2026 where it applies. “First promised” is the date given at registration. Completed projects are not listed. Open a project for its full MahaRERA record.

ProjectWherePossession due (MahaRERA)First promisedComplaints
SHREE SADGURU HEIGHTS
Shree Sadguru Builders and Developers
Adarsh Nagar27 Jan 2026passed27 Jan 20250
Iristo Gold
M/s Iristo Developers llp
Wadgaon31 Jan 2026passed31 Jan 20250
Yashodham
OM DEVELOPERS
Ravet31 Jan 2026passed30 Sep 20230
SAVITA CALYSTA
SHRINIVAS DEVELOPERS
Van Dev Nagar9 Feb 2026passed31 Jul 20240
KUBER ANTONIA
VIKAS VILAS BHALGAT
Wakad23 Feb 2026passed24 Feb 20250
SATVAM HILLS A5
SYNERGY PROPERTIES
Paud24 Feb 2026passed30 Jun 20250
KAVYA HEIGHTS
AARYA DEVELOPERS
Wagholi25 Feb 2026passed31 Dec 20241
Trimurti Residency
EKADANT DEVELOPERS
Baramati11 Mar 2026passedsame0
NIRMITI 25 EAST
NIRMITI VASTU CREATION LLP
Dunkirk lines28 Mar 2026passed30 Mar 20241
Bhargav Stella
Bhargav Shelters
Oppo. Shankar Maharaj Math Dhankawadi30 Mar 2026passed30 Mar 20250
Gagan Klara
Gagan Housing And Landmarks LLP
Balewadi30 Mar 2026passed30 Mar 202447
AASHIRWAD CONNECT
AASHIRWAD SUCESS PROPERTIES
Nigdi Pradhikaran31 Mar 2026passed31 Mar 20240
ARC FINEZZA
ARC FINEZZA DEVELOPERS LLP
Pimple Saudagar31 Mar 2026passed31 Oct 20250
BLUE BELL
M G BUILDERS & DEVELOPERS
Kiwale31 Mar 2026passedsame0
CHERRY HILLS BUILDING A
RAMDAYAL BANARSIDAS GUPTA
Chinchwad31 Mar 2026passed1 Apr 20250
Destination 24 Avenue B Building
D R GAVHANE LANDMARKS LLP
Charholi31 Mar 2026passedsame0
Escala
Rising Prime Developers LLP
Dunkirk lines31 Mar 2026passedsame0
Island Of Bliss
Chittaranjan Gorakhnath Ashtekar
Theur31 Mar 2026passed31 Mar 20250
La commercia 4-9
AUM HOUSING
baner31 Mar 2026passed31 Mar 20241
MATHURA TOWERS
SHRI MATHURA CONSTRUCTIONS
Kondhwa Bk31 Mar 2026passed31 Dec 20240
NANDAN ACE
JHAMTANI REALTY PRIVATE LIMITED
Balewadi31 Mar 2026passedsame0
Neelkanth Landmarks Shreeniwas Residency
NEELKANTH LANDMARKS
Kadamwak Wasti31 Mar 2026passed31 Jan 20250
NIVASA ENCHANTE - PHASE I
NIVASA ASSOCIATES
Lohegaon31 Mar 2026passedsame1
Rose Galaxy
Rose Dream Developers
Moshi31 Mar 2026passed31 Dec 20182
Saarrthi Savvy Homes II
Siddharth Properties
Hinjewadi31 Mar 2026passed30 Dec 20221
SHREE RAM APARTMENT
SHREE RAM BUILDERS & PROMOTERS
Parvati31 Mar 2026passedsame1
SHREERAM SHIVALAY WEST
ROHIT SKYLINE
Lohegaon31 Mar 2026passed30 Jun 20230
Sun City - Ambegaon Phase - III
Mittal Projects
Katraj31 Mar 2026passedsame1
SUNRISE CITY
AKASH ENTERPRISES
Viman Nagar31 Mar 2026passed1 May 20221
VERTILLAS
AMI ESTATES LLP
Kharadi31 Mar 2026passed30 Dec 2022112
WATERFRONT
nilesh mohandas navalakha
Near Tupe Shooting Range31 Mar 2026passed31 Dec 20250
YASHVI GREENS
AKSHAY BABURAO WAIKAR
Khandoba Mala31 Mar 2026passedsame0
24 ELEMENTS
S.P. BUILDERS AND DEVELOPERS
Manchar2 May 2026passedsame0
ARNAV DOPIOO
DATTATRAY MADHUKAR BHANGIRE
Handewadi21 May 2026passed30 Jun 20240
DURVANKUR RESIDENCY C WING
DURVANKUR DEVELOPERS
Ambegaon Bk25 May 2026passed31 May 20250
Studio06
KARVENAGAR STUDIO LLP
Navsahyadri31 May 2026passedsame2
WESTWINDS Wing A
Shreeram Sankalp Associates
poud road,kothrud31 May 2026passed30 Dec 20210
LAXMIVIHAR
LAXMI GULAB MURGUNDE
Dhanori15 Jun 2026passedsame0
SPLENDOUR COUNTY WAGHOLI
PS DEVELOPERS
Behind Wagheshwar Mandir15 Jun 2026passed15 Jun 20241
CHINTAMANI HEIGHTS
NARENDRA BALASAHEB BADAVE
Manjari Farm28 Jun 2026passed31 Mar 20250
M J OPERA
M/S SHIVDAN CONSTRUCTIONS
Wakad28 Jun 2026passed31 Oct 20255
SARA SWAPNODAY
Jagrutsara Structures LLP
Kharabwadi29 Jun 2026passed30 Jun 20250
VTP ALTAIR
Integrated Business Ecosystem Private Limited
Wagholi29 Jun 2026passed30 Jun 202530
addressOne - Phase 6
Peninsula Land Limited
Near MCA Stadium Gahunje30 Jun 2026passed30 Jun 202434
ANGAD PARK
AAVANI DEVELOPERS
Ex Serviceman Colony30 Jun 2026passed31 Oct 20240
BHAKTI RUDVED
BHAKTI BUILDERS
Near Shivaji Uday Mandal, Chinchwad30 Jun 2026passed31 Dec 20250
DOLPHIN SERENO
DOLPHIN SERENO LLP
Alandi Devachi30 Jun 2026passed31 Dec 20250
DWARKA PROJECT3
NAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD
Chakan30 Jun 2026passed31 Dec 20198
GATEWAY
RAICHANDANI CONSTRUCTIONS PRIVATE LIMITED
Kharadi30 Jun 2026passed30 Dec 20250
GRACE PLAZA
Neelawati Developers and Promoters
Gopalwadi, Daund30 Jun 2026passed30 Dec 20240
Komal
SRKD LANDMARK LLP
Karvenagar30 Jun 2026passed31 Jan 20250
Lotus Florina
Lotus Florina
Mamurdi30 Jun 2026passed31 Dec 20250
LOVE SPRING
APEX ASSOCIATES
Chikhali30 Jun 2026passed15 Dec 20230
Mont Vert Kingstown Sector 1 Residential Wings
Niraj Kumar Associates Pvt Ltd
Bhugaon30 Jun 2026passed30 Jun 20254
NANDANVAN COLINA
SAI SANKALP DEVELOPERS
Ambegaon Budruk30 Jun 2026passed31 Aug 20250
Oriana Nest
Shrenik Nilesh Oswal
Banergaon30 Jun 2026passed31 Dec 20250
PRESIDENCY TOWERS
Presidency Hospitality Limited
Wakad30 Jun 2026passed30 Aug 20252
SENTOSA PRIDE WING A
SHREE KRISHNA ASSOCIATES
Punawale30 Jun 2026passedsame0
SHIVTHIRTH HEIGHTS
UNIQUE REALITY GROUP
Wadmukhwadi30 Jun 2026passedsame0
SIGNATURE PARK E F I AND J BUILDINGS
SHREE SONIGARA REALCON
Dange Chowk Thergaon30 Jun 2026passedsame46
Sneha Avenue
Nandu Antaram Rajput
Bhugaon30 Jun 2026passed31 Dec 20250
Snehal Apartment
SANJIVANI REALITY
Chinchwadgaon30 Jun 2026passed14 Sep 20250
SUNMAN CO-OPERATIVE HOUSING SOCIETY LIMITED
Raichandani Constructions and Developers
Shivaji Nagar30 Jun 2026passed31 Dec 20250
TEJAS NANDAN
TEJAS PROMOTERS AND BUILDERS
Dudulgaon30 Jun 2026passedsame0
THE SKY TOWER
PRABHAS REALTY
Kiwale30 Jun 2026passed31 Mar 20240
Uday Heights
SAIGURU DEVELOPERS (AOP)
Kharadi30 Jun 2026passed31 Jan 20260
WHISPERING WIND PHASE III
SANE VYAS ASSOCIATES
Pashan30 Jun 2026passed31 Dec 20250
KUMAR PRAJWAL
KEWAL REAL ESTATE DEVELOPERS PRIVATE LIMITED
Sainath Nagar, Vadgaon Sheri3 Jul 2026passed30 Mar 20230
GREEN CASTLE
APURVA DEVELOPERS
khadkale15 Jul 2026passed25 Jun 20185
EMPRESS VIEW
Mohit Construction
Wanawadi30 Jul 2026passed30 Mar 20250
Miracle Mathura
Miracle Builders and Developers
Chinchwad30 Jul 2026passed31 Jul 20250
Aundh Renaissance
SKYCRAFT BUILDCOM LLP
Aundh31 Jul 2026passed30 Sep 20242
Bhardwaj
Motive Associates
Sadashiv Peth31 Jul 2026passed31 Mar 20250
CLASSIC GLORIA BUILDING B
CLASSIC PROPERTIES
Kondhwa Bk31 Jul 2026passed31 Mar 20250
DNK CAPITAL
D N K CORP
N I B M31 Jul 2026passed1 Mar 20240
GAURAV ICON TOWER
GAURAV ICON INFRATECH PRIVATE LIMITED
Infotech Park (Hinjawadi)31 Jul 2026passed31 Mar 20260
GENESIIS
PLUS ONE DEVELOPERS
Hinjewadi31 Jul 2026passed31 Dec 20230
ICON ROSELIA
ICON REALTY UNIT 2
Ghorpade Peth31 Jul 2026passed31 Jan 20250
KEDARI LANDMARK
Shree Ganesha Enterprises
Wanawadi31 Jul 2026passed24 Aug 20196
LAXMI GANGA HEIGHTS
KRISHNA LEELA CONSTRUCTIONS
Vadgaon Budruk31 Jul 2026passed31 Mar 20250
Mantri Emporio
SHORE DWELLINGS PRIVATE LIMITED
Kharadi31 Jul 2026passed31 Jan 20201
MEENAKSHI APARTMENT
SANKALP BUILDCON
Sangavi31 Jul 2026passed31 Mar 20260
Olive Orchard
Anandtara Properties
Kala Khadar Chowk31 Jul 2026passed31 Jul 20240
Orion 15-16-17
NOVA DEVELOPERS PVT LTD
Hinjavadi31 Jul 2026passed1 Aug 202517
PRAGATI SERENE
Manav Ventures
Mohamadwadi31 Jul 2026passed30 Sep 20251
Rajveer Creation
Waghere Promoters
NehruNagar31 Jul 2026passed30 Dec 20220
RANJAI
Shinde & Patil Construction
Behind Anant Mangal Karyalay31 Jul 2026passed30 Apr 20232
RKL Durvankur Jaswand
LUNKAD VISHWA DEVELOPER
Alandi Devachi31 Jul 2026passed30 Apr 20250
SAI VISHWA
Om Sairam Construction
Baramati31 Jul 2026passed30 Jun 20250
Shikrapur Trade Center Phase III
Pride landmarks
Shikrapur31 Jul 2026passed31 Mar 20260
SHUBHAM GALLERIA PH-2
KOHINOOR ASSOCIATES
Pimpri Colony31 Jul 2026passed31 Dec 20240
The Oasis
MAHAVIR INVESTMENTS
Camp31 Jul 2026passed31 Mar 20260
VARAD
Ishakriti LLP
Kothrud31 Jul 2026passed31 Mar 20250
SHANTIVAN
SAIBABA SALES PRIVATE LIMITED
Pimpri10 Aug 2026passed31 Mar 20251
66 HIGH STREET SQUARE
M/S AVENUE HOUSING PVT LTD
Baner30 Aug 2026passed30 Apr 20240
Bonheur A wing
Linux Group
vinode nagar30 Aug 2026passed31 Dec 202425
CHORDIYA RESIDENCY
CHORDIYA ASSOCIATES
Kondhwa Bk31 Aug 2026passed31 Dec 20240
PROFITBAY - BT KAWADE ROAD
VENTURESPRO PROJECTS LLP
Ghorpodi31 Aug 2026passed28 Aug 20230
TUNGABHADRA CO OP HSG SOC
PRAVIN KESHAV BADHEKAR
Vanaz31 Aug 2026passed30 Apr 20250
MRUDULA RESIDENCY
SAMARTH ASSOCIATES
Bhosari5 Sep 2026passedsame0
Gandharv Nagari Building A3 Wing A, B
Vinayak Pandharinath Bhongale
Gandharv Nagari9 Sep 2026passed9 Sep 20250
34 Western Pavillion
BLUE PEARL PROMOTERS AND DEVELOPERS
Baner11 Sep 2026passed15 Apr 20240
Varad Residency
Vilas Bhagaji Arekar
Near bhumkar Vasti16 Sep 2026passed31 Dec 20250
IDEAL AVENUE
IDEAL BUILDERS
Boradewadi28 Sep 2026passed30 Sep 20240
1 NEW CASTLE
CHAVDA REALTY LLP
Baner29 Sep 2026passed25 Dec 20250
7 Plumeria Drive- Phase 3
B A Consulting
Punawale30 Sep 2026passed31 Mar 20260
Celestial City Phase II Building I, J, K
RAMA SYNERGY SPACES
Dehu Road Cantt30 Sep 2026passed30 Jun 20240
CITY ONE SKYVE
SHREE SAI CAPITAL
Kiwale30 Sep 2026passed31 Dec 20252
ENLIVEN HOME B WING PHASE 2
SIDDHIVINAYAK PROPERTIES
Wagholi30 Sep 2026passed31 Dec 20240
Godavari Apartment Condominium
Revive Homes LLP
Kanchan Galli, Erandawana30 Sep 2026passed31 May 20260
HARSHAD APARTMENT
ARCHWAY PROPERTIES
Parvati30 Sep 2026passed30 Nov 20250
Nishant Co -Op Hsg Society
Shri Laxmi Narayan Properties LLP
Bibwewadi -Munjeri, Gultekdi30 Sep 2026passed1 Dec 20240
OSIAN NAVKAR
OSIAN REALTY
Market Yard30 Sep 2026passedsame0
PENTAGON BUSINESS HUB
COSMIC INFRASTRUCTURE
Akurdi30 Sep 2026passed30 Apr 20240
Prathamesh Co-Op Housing Soc
Joshi Associates
Right Bhusari Colony, Kothrud30 Sep 2026passed1 Sep 20250
Royal Glen
Stargaze Buildcon
Ghorpadi30 Sep 2026passed30 Jun 20230
Sadanand Condominium
Rajendra Balkrushna Chaphalkar
Erandwana30 Sep 2026passed31 Mar 20250
SHIVSHRI HEIGHTS
SHIVASHRI BUILDCON
Baramati30 Sep 2026passed31 Mar 20260
SHREEJIS ORION
VN Developers
Somatane30 Sep 2026passed28 Aug 20220
Sonchandr Residency
CHANDAN RAMDAS KATE
Mulshi30 Sep 2026passed31 Mar 20220
VENKATESH ERANDWANE CENTRAL - BUILDING-B1 - PHASE 2
SHREE VENKATESH BUILDCON PVT LTD
Erandwane30 Sep 2026passedsame0
AAIJI CRYSTAL PHASE I
AAIJI DEVELOPERS
Tingre Nagar1 Oct 2026passed1 Apr 20261
SHANTAI CLASSIC
SHANTAI GROUP
Ravet1 Oct 2026passed30 Dec 20240
Foresta Phase I
MACHI SUITES LLP
NEAR Mahindra United World College India26 Oct 2026passed6 Sep 20242
Prime Avenue
M/s Prasad Developers
Dehu29 Oct 202630 Jun 20250
PRISMA HOMES
prisma realty pvt ltd
Chikhli29 Oct 202630 Jun 20250
RAM KANTA APARTMENTS
PHADTARE BUILDCON
Bhosari29 Oct 202630 Jun 20250
Aarambh
Seven Star Properties
Mulshi30 Oct 202631 May 20190
Al Marjaan
Briskband Associates
Mohammedwadi30 Oct 202630 Dec 20249
ARCADIA
ACME SAWANT VENTURES
Nr Bharat Petrol Pump30 Oct 202615 Dec 20222
Arihant Sakshi
Dharmesh Vasantrai Shah
Wanawadi30 Oct 202630 Jun 20240
Ashapuri Vrundavan Phase I
Ashapuri Developers
near pirangut ghat30 Oct 202630 Jun 20250
AUSTIN ONE
DIVYA ASSOCIATES
Pimple Saudagar30 Oct 202631 Dec 20251
DURGA VIHAR
Satkar Reality
Dhankawadi30 Oct 202628 Oct 20250
Godrej Green Cove
Mahalunge Township Developers Private Limited (Godrej)
Mahalunge30 Oct 202630 Mar 20256
HARE KRISHNA KUNJ
B G PROMOTERS AND BUILDERS
Kondhwa Br30 Oct 202631 Dec 20250
HARMONY
Sachin Dattatray Undre
Hadapsar Tal Haveli Dist30 Oct 202630 Dec 20230
HARMONY-A
SACHIN DATTATRAY UNDRE
Hadapsar Tal Haveli Dist30 Oct 202631 Dec 20230
IMPERIAL ATRIA TOWER 2
MERIDIAN
Baner30 Oct 202630 Apr 20221
INDRAYANI RIVERVIEW RESIDENCY
SHREENATH DEVELOPERS
Dudulgaon30 Oct 202631 Dec 20240
JITO NAGAR
JAIN ASHAPURI DEVELOPER UNIT II
Marketyard Annex30 Oct 202630 Sep 20250
KJ TOWER
KALYAN JAGANNATH JADHAV
Warje30 Oct 202630 Mar 20242
MAHESHWARAM MAJESTIC
MAHESHWARAM ASSOCIATES
Shinde Wasti30 Oct 202631 Dec 20251
MAJESTIC PRIDE
ANWAR MAHMOO SHAIKH
Kondhwa Khurd30 Oct 202631 Oct 20240
Majestique Towers East Phase 3
M/s. Sharad Shree Enterprises
Wagholi30 Oct 202630 Jun 202615
Manek Regency
B. U. Bhandari Landmarks
Nana Peth30 Oct 202630 Dec 20240
MUGDHA RESIDENCY
SRRINIVAS DEVELOPERS
Chikhali30 Oct 202630 Jun 20260
Olina
S S PROJECTS
Hingne Kd30 Oct 202631 Dec 20250
OMKAR HEIGHTS
RAHUL BABAN KAMBLE
Kasar Amboli ashiyana co-op society30 Oct 202630 Jun 20240
ORCHIDS
SAI BALAJI CONSTRUCTIONS
Pimple Nilakh30 Oct 202615 Jun 20242
PANNA
NABAR ASSOCIATES
Erandawane30 Oct 202630 Jun 20240
PEHLWAN PRATAP SINGH PLAZA
MODERN GROUP
Pune City30 Oct 202630 Sep 20230
PLATINUM SQUARE
PLATINUM PROMOTERS
Pirangut30 Oct 202630 Jun 20260
PRIVIA SQUARE
ELLORA ASIAN REALTY PVT LTD
Moshi Pradhikaran30 Oct 202625 Dec 20240
PRIVIA SQUARE NX
ELLORA ASIAN REALTY PVT LTD
Moshi Pradhikaran30 Oct 202625 Dec 20240
Ratan Vihar
VAIBHAV BUILDERS & DEVLOPERS
Bavdhan30 Oct 20261 Mar 20240
SAI SAVLI
DEEPAK BALKRUSHNA REPALE
Narayangaon30 Oct 202630 Jun 20240
SAI WORLD RETREAT
Paradise Leisure Homes
Behind lucky celebrity wax museum30 Oct 202630 Dec 20240
SHAVIRA RESIDENCY
SHAVIRA DEVELOPERS LLP
Pimple Nilakh30 Oct 202631 Dec 20250
SHREERAM SHIVALAY EAST
Rohit Skylines
Lohegaon30 Oct 202630 Jun 20250
SHREEYANSH PARK
SHRIRAM DEVELOPERS
Akurdi30 Oct 202630 Sep 20200
SHRI LAXMI CHHAYA SAHAKARI GRAHRACHANA SANSTHA MARAYADIT
ARCHWAY PROPERTIES LLP
Kothrud30 Oct 202631 Dec 20250
SKY CREST
RAHUL PROPERTIES
Kale Padal30 Oct 202631 Dec 20250
Suyash Greens
Suyash Promotors & Developers
Sant Ramji Babanagar30 Oct 202631 Dec 20181
Swami Residency
Manik Sadashiv Mohite
Lohegaon30 Oct 202630 Dec 20240
SWAPNAPURTI HERITAGE
S.D. DEVELOPERS
Katraj Pune30 Oct 202631 Dec 20240
tradeparkb
VTP Mohite Associates
Undri30 Oct 202630 Dec 20231
TRIDENT BUSINESS PARK
PARANJAPE SCHEMES (CONSTRUCTION) LTD
Wakad30 Oct 202630 Sep 20250
VTP Aethereus- Phase1
HOME RISING CONSTRUCTION LLP
Mhalunge30 Oct 202630 Dec 202526
Welworth Purnam
Grow India Realcon LLP
Infotech Park (Hinjawadi)30 Oct 202631 Dec 202510
Ashiana Malhar Phase I and Commercial Block
Ashiana Housing Limited
Infotech Park (Hinjawadi)31 Oct 2026same1
AURA BLUE
FORTUNE REALTY GROUP
Punawale31 Oct 202631 Oct 20240
BLISS FIELDS-PHASE-I
SAI SHRADDHA VENTURE
Zendewadi31 Oct 202631 Dec 20250
DWARKAKUNJ
JOSHI BUILDCON LANDMARKS
Krishna Colony31 Oct 2026same0
EXCEL CELESTIA RESIDENCY E AND F AND MHADA
EXCEL HOUSING
Moshi31 Oct 202630 Dec 20221
GANGA LAHARI CO-OPERATIVE HOUSING SOCIETY LTD
M/S GOKHALE CONSTRUCTIONS
Navsahyadri31 Oct 2026same3
GANGA PLATINUM A
SHREE BALAJI ASSOCIATES PUNE LLP
Kharadi31 Oct 202631 Dec 20258
Kuber Park Phase-I
Bhujbal Buildcon
Shirur31 Oct 202631 Dec 20230
PRAJOL AASHIYANA B WING
RAJESH MARUTI KADAM
Pimpri Chinchwad31 Oct 202615 Aug 20240
PRATHAM YASH VRINDAVAN II
PRATHAM YASH BUILDERS
Chovisawadi31 Oct 202630 Jun 20231
Prathamesh Sanskruti building of Abhinav Apartments Association
Prathamesh Constructions
Sadashiv Peth31 Oct 202631 Dec 20250
Pride Heritage
BHAKTI INFRA
Chinchwad31 Oct 202631 Dec 20250
SAMARTH SERENITY BUILDING C
SHREE SWAMI SAMARTH DEVELOPERS
Near Symbiosis Univercity31 Oct 2026same0
VISION EXOTICA
VISION AVIS GROUPS
Spine Road31 Oct 202631 Dec 20254
Yashodham
OM DEVELOPERS
Ravet31 Oct 202631 Dec 20240
Solitaire Business Hub Baner
Atul Builders
Baner6 Nov 202630 Jun 202323
ELITAS
Eka Buildcon LLP
Kothrud11 Nov 202611 Jul 20260
Janhavi
Amol Ajit Ravetkar
Lokmanya Colony, Kothrud18 Nov 202630 Sep 20250
AISHWARYA HEIGHTS
Shree Sadguru Construction
Ambegaon Bk30 Nov 202631 Mar 20250
ANP BIZSQUARE
FIVE STAR VIGHNESH ASSOCIATES (AOP)
Wakad30 Nov 202630 Sep 20250
Basil Shreeji Residential
GSV CONSTRUCTIONS
Dattanagar30 Nov 202631 Dec 20240
Defence Colony Pune Phase4
Defence Colony Pune
Vagholi30 Nov 202631 Dec 201816
DESTINATION 24 AVENUE C BUILDING
M/S D R GAVHANE LANDMARKS LLP
Charholi30 Nov 202631 Dec 20250
DHRUPI TOWERS
HRITIK NITIN JAIN
Charoli (Bk)30 Nov 202624 Dec 20240
FUSION TOWERS PHASE III
RAMA SYNERGY SPACES
Hinjewadi Phase III30 Nov 202631 Jul 20251
Gathagram Sector 4 Phase 1
HARIT LANDMARKS LLP
Dehu30 Nov 2026same0
Matoshri Prime
Shrimatoshri Infrabuild LLP
Wadmukhwadi30 Nov 202630 Jun 20250
Perinsheri Pinnac Greens
F. S. Mazda & Pinnac Housing Associates LLP
Kothrud30 Nov 202630 Jun 20230
SHREE GANESH GALAXY
MUKESH GOYAL DEVELOPERS PRIVATE LIMITED
Alandi Devachi30 Nov 202630 Dec 20240
SHRIKISAN ENCLAVE
M/s. Tirupathi Properties Through Prop Mr. Vedprakash Shrikisan Agarwal
Bhosari30 Nov 202631 Jul 20260
SPLENDID HOMES
PANDURANG MARUTI KALOKHE
Near Symbiosis College Kiwale30 Nov 202630 Dec 20230
SURYA SKIES
SURYA DEVELOPER
Punawale30 Nov 202631 Dec 20250
DOODLE HOMES
DOODLE HOMES LLP
Lonavala3 Dec 202630 Mar 20260
ANSHRAJ ICON
VIJAY DEVELOPERS
Bhugaon15 Dec 202631 Dec 20250
PERCEPT BOUNTY 3
PRIME ESTATE
Vadgaonsheri15 Dec 20261 Jun 202418
SAVALI PLAZA
SAVALI ASSOCIATES
Jejuri15 Dec 202629 Dec 20250
VASTUSHREE PHASE-1
VASTU CONSTRUCTION
Sopankaka Bagar15 Dec 202615 Aug 20250
SAI ICON WING B
M/S. K. K. Developers
Jambhulkar Nagar21 Dec 202622 Sep 20250
Sai Shawas
Vilas Tukaram Wadghule
Near Primary Health Care Center23 Dec 202626 Dec 20222
TEJ NAVYA
TEJRAJ PROFILE BUILDERS LLP
Erandwane24 Dec 202624 Dec 20250
Saachee Elite
Suyog Suryakant Chhajed
Aundh25 Dec 202625 Aug 20260
KRISHNA KAPITAL
OSTWAL REALTY
Near Iskon Temple26 Dec 202626 Mar 20240
LIVMO PHASE I
PRIYANKA BUILDERS
Hinjawadi Phase III27 Dec 202630 Dec 20233
LIVMO PHASE II
PRIYANKA BUILDERS
Hinjewadi Phase III27 Dec 202631 Dec 20245
Reelicon Fairy Bell
Reelicon Red Homes Private Limited
Baner Annexe28 Dec 202630 Dec 20230
One Place - F C Road
PALASH REALTORS LLP
Bhamburda (Shivajinagar)29 Dec 202630 Dec 20242
Ganga Fernhill phase 02
MEENAMANI GANGA BUILDERS LLP
Undri30 Dec 202630 Dec 20256
INDIAN BANK STAFF CO-OPERATIVE HOUSING SOCIETY LTD
RAICHANDANI CONSTRUCTIONS PRIVATE LIMITED
Salisbury Park30 Dec 202631 Dec 20250
MAPLE GROVE
SAIPAN GHUDUBHAI JAMADAR
Dhanori30 Dec 2026same0
NAIK HERITAGE
Jamaluddin Khan
Shukrawar Peth30 Dec 202630 Aug 20260
Pankaj Aasmaan Phase V
Pankaj Developers
Sant Nagar30 Dec 2026same0
Samarth Paradise
Samarth Associates
Gajanan Colony30 Dec 202628 Feb 20260
SHUBH GATEWAY
Shubh Landmarks
Vimannagar30 Dec 2026same0
SPORTSVILLE
YELLOWSTONE SKYSCRAPERS LLP
Village Maan Taluka Mulshi Dist30 Dec 202631 Dec 202526
STELLA REGENCY
Pratham Yash Buildcon
Pune International Road30 Dec 202625 Dec 20240
26 AVENUE
AVENUE GROUP
Ravet31 Dec 202631 Dec 20250
AAKANKSSHA SANSKRUTI
AAKANKSSHA DEVELOPER
Budhwar Peth31 Dec 202630 Jun 20190
ABHISHEK SAHAKARI GRUHRACHANA SANSTHA MARYADIT
MORAYA ASSOCIATES
Chinchwad31 Dec 2026same0
Ace Abode Phase 2A
ACE GLOBAL REALTY
Kiwale31 Dec 2026same0
ADINATH SHRUSHTI
ADINATH REALTY
Near Shikshak Bhawan31 Dec 202630 Apr 20250
Akshara Serenity B and C
Garve Developers and Promoters
Tathwade31 Dec 202631 May 20260
Allura Tower
Geet Govind Realty
Alandi Devachi31 Dec 2026same0
AMORA TOWER
AMARNATH CREATIVITY
Charoli31 Dec 202630 Jun 20240
Anamay Apartments
Nestcon
Ideal Colony31 Dec 2026same0
ANANDTARA IRIS RESIDENCES PHASE II
ANANDTARA INFRASTRUCTURE
Keshavnagar31 Dec 2026same0
ANANT PARVATI
SAMARTHSHREE DEVELOPERS
Armament31 Dec 202631 Dec 20250
ANANTA
KK AND LEGACY DEVELOPERS
Rahatani31 Dec 202631 Dec 20241
ANIKA ESSENTIA
Arun Sheth Properties
Ghorpadi31 Dec 202630 Jun 20250
ANIKA GOKUL NIWAS
ALOK ARUN SHETH
Karvenagar Hingane31 Dec 202631 Dec 20250
ANP RETREAT
Five Star Construction Company
Behind Golden Care Hospital31 Dec 202615 Jun 20250
ARYAA DREAM TOWN
VINI BUILDERS AND DEVELOPERS
Chandoli31 Dec 202631 Dec 20240
ASHIYANA
S R KULKARNI REALTORS
Shivajinagar31 Dec 202631 Dec 20250
ASMI PRIDE
M/S ICON DEVELOPERS
Bhukum31 Dec 202630 Jun 20250
Astonia Classic Phase II - A5 Building
AMIT ENTERPRISES HOUSING LIMITED
Undri31 Dec 202631 Dec 20200
AUDUMBAR RESIDENCY
GURUDATTA ASSOCIATES
Kondhwa Bk31 Dec 2026same0
AURELIA
SHITOLE PROPERTIES
Rahatani31 Dec 2026same0
Avadh
Kumkum Realty
Haveil31 Dec 2026same0
Brain Matrix
M/s Bora Associates
Aundh31 Dec 202631 Dec 20250
COZY LIFE BUILDING B
COZY LIFE
Vagholi31 Dec 202631 Dec 20250
DIVYA ELITE
RRS INFRACON LLP
Kondhwa31 Dec 202630 Jun 20250
Divyata Park
SHANTARAM J GADHVE
Narayangaon31 Dec 2026same0
Estrella 45
Osian Diya Developers LLP
Near Balewadi Phata31 Dec 2026same0
Eternia Phase 2
VENTURESPRO PROJECTS LLP
Ghorpodi31 Dec 202630 Dec 20252
EVERNEST SHIVSHRUSHTI
EVERNEST PERFECTINFRA LLP
Landewadi31 Dec 2026same1
Fusion Towers Phase IV
RAMA SYNERGY SPACES
Hinjewadi Phase III31 Dec 202631 Dec 20250
Ganesh Paradise Phase I
EKDANTA NEST LLP
Chikhali31 Dec 202630 Jun 20251
Gangadhar Apartments
Kelkar Housing LLP
Laxmi Park Colony31 Dec 202631 Aug 20260
GIRIRAJ RESIDENCY
ATUL CONSTRUCTIONS
Renuka Nagri31 Dec 2026same0
GIRNAR
SHREE DATTA REALTORS
Rasta Peth31 Dec 2026same0
Godrej Meadows- Phase 2
Mahalunge Township Developers Private Limited (Godrej)
Mahalunge31 Dec 202631 Dec 202583
Godrej Sky Greens Phase 1
Manjari Housing Projects LLP (Godrej)
Manjari Khurd31 Dec 202631 Mar 20262
Godrej Sky Greens Phase 2
Manjari Housing Projects LLP (Godrej)
Manjari Khurd31 Dec 202631 Mar 20261
GODS COUNTY C WING
GANESHCONSTRUCTION
Charholi Kh31 Dec 202631 Dec 20200
Govind Apartment
Kirit Harilal Jivarajni
Shukrawar peth31 Dec 202631 Oct 20240
GREEN CITY
GREEN CITY
Lonikand31 Dec 2026same0
GREEN HILL PHASE 2
D.S. Dhone Builders
Katraj31 Dec 202631 Dec 20250
HAPPY HOMES AMENITY BUILDING
Happy Homes Realty
Wagholi31 Dec 202631 Dec 20250
Hastipuram
Balaji Builders
Bibvewadi31 Dec 2026same0
Heera Mansion
Ambalal and Sons
Shukrawar Peth31 Dec 2026same0
HIGHLIFE SURVEY NO 56/3/37/1P , 56/3/26/3 AT WADGAONSHERI
RM GROUP
Stella Maris School31 Dec 202631 Dec 20250
HILL TOWN A B AND C WING
HILL TOWN CONSTRUCTIONS
Near Khadi Machine Chowk31 Dec 202622 Jul 20232
HS PRIVITUDE
H S ASSOCIATES
Punawale31 Dec 2026same11
Imperial Plaza
Imperial Landmarks Sachi My Home Developers
Near chandani chowk31 Dec 202630 Mar 20259
ISLE OF LIFE - BUILDING B and C
R R VENTURES
Marunji31 Dec 202631 Aug 20250
Jare Aangan
Sachin Vasant Jare
Chikhali31 Dec 202631 Dec 20250
Kanishka Grand Plaza
Platinum Lifespace Developers
Saswad31 Dec 202631 Dec 20250
KATE ESTATE
ARIHANT PROPERTIES
Chovisawadi31 Dec 202630 Dec 20240
Kedar Residency
Subhagya Promoters & Builders Pvt Ltd
Near Masulkar Farm31 Dec 202631 Dec 20250
Kekarav Phase III
SHREM TRADING LLP
Bavdhan Bk31 Dec 202630 Jun 20230
KESAR HIGHSTREET
KASATA PROPERTIES
Opp Pune International Exibation Center31 Dec 202631 Dec 20241
KESHAVYOG RESIDENCY
SIDDHIVINAYAK BUILDERS
Loni Kalbhor31 Dec 202630 Mar 20230
KHUSH VISTA
Elated Housing LLP
Mohomadwadi31 Dec 2026same1
KRUSHNAKUNJ
MADAN SUBHASH KATARIA
Near Trimurty Chowk, Dhankawadi31 Dec 202631 Mar 20240
LAXMI VISHWA
TULSI BUILDTECH
Medankarwadi31 Dec 202630 Dec 20240
MAGIC GREEN CITY PART 2
Magic Homes
Baramati31 Dec 202631 Dec 20240
MAGNUM IRIS
Urban Homes
Kesnand31 Dec 202631 Dec 20240
MAITRI CHANDRIKA
S K PROMOTERS
Maharana Pratap Chowk, Dhanori31 Dec 202631 Dec 20250
MAITRI GOLD
MAITRI DEVELOPERS AND BUILDERS
Dhamdhere31 Dec 202630 Dec 20230
MANAS RESIDENCY
OORJITAA REALTORS
aalephata31 Dec 202630 Dec 20240
MARVEL ISOLA J BUILDING
MARVEL LANDMARKS PVT LTD
Mohammadwadi31 Dec 202630 Jun 202126
MATOSHREE PRIDE
DEVIDAS SURESH BHAT
Mundhwa31 Dec 202631 Aug 20250
Mayura
Badhekar Properties
Kothrud31 Dec 202631 Jan 20250
MEANDER WING C
EASTEND SPACES LLP
Near Keshanan Phata31 Dec 20261 Mar 20260
MGP Siddhiksha
MGP Developers
Pimple Nilakh31 Dec 2026same0
MIDTOWN ONE
MANAV REHAB LLP
Rasta Peth31 Dec 2026same0
MIravet District Phase - I
AUM DEVELOPERS
Mhaske Wasti, Ravet31 Dec 202631 Dec 20253
Morya Sanctuary
MS Associates
Ravet31 Dec 2026same0
Muktai Park Phase II
Shivshakti Buildcon
Loni kalbhor31 Dec 202631 Dec 20250
Neco Officers Ville I
Vasupujya Corporation
Mohamadwadi31 Dec 2026same0
NIVASA ANANYA PHASE I
NIVASA BUILDCON
Lohegaon31 Dec 2026same0
NIVASA ELEVIA PHASE-II
Shree Samarth Spaces
Mundhva AV31 Dec 2026same0
Optima 2.0
M/S. SOBA ASSOCIATES
Wadgaon Bk31 Dec 202630 Dec 20259
OXY FLORA PHASE 3
YOGESH DEVELOPERS
Koregaon Bhima31 Dec 202631 Dec 20250
PALOMA AZURE
SYNERGY PROPERTIES
Adhale Bk31 Dec 202631 Jan 20260
PANCHATATTVA HEIGHTS
RAJENDRA KUMAR PUGALIA
Punawale31 Dec 202630 Dec 20230
PANCHTATVA
SANSKRUTI PINNACLE
Bibvewadi31 Dec 20261 Apr 20260
Panna Niwas
Unique Developers
Village Bopodi31 Dec 202625 Oct 20250
Parin Empire
Gote Bhilare Associates
Dhayri31 Dec 202628 Feb 20222
Pristine Commerce Street
KANHA DEVELOPERS
Moshi31 Dec 2026same1
PROJECT ABCD PHASE 4
MANTRA ZIRCONIA PRIVATE LIMITED
Mundhwa31 Dec 2026same0
RADHA KRUSHNA NIWAS
SHREEVINAYAK DEVELOPERS
Sinhagad Road31 Dec 202630 Sep 20240
RAMAN STELLAR
SOHAM SHIVAM DEVELOPERS
Tathwade31 Dec 202631 Dec 20250
RAMANA PRIMAVISTA
RAJENDRA VINAYAK PATAHRE
Dhayri-Ext31 Dec 202630 Dec 20231
RAVINANDA AAMRAI PHASE 1 BUILDING C
OM SAI DEVELOPERS
Chavan Baugh31 Dec 202630 Dec 202321
ROHAN YUVA - BLDG E
ANUMIT BUILDCON PRIVATE LIMITED
Wagholi31 Dec 202629 Nov 20240
ROSEWOOD PARK
SHRI MANIBHADRA ESTATES
Wagholi31 Dec 202630 Dec 20241
Ruhi Mangalam Niyoshi
Ruhi Mangalam Associates
Aundh31 Dec 2026same0
SAI DARSHAN PHASE II
SAI SHRADDHA DEVELOPERS
Tathawade31 Dec 202631 Dec 20250
Sai Residency
SAI DEVELOPERS
Nere31 Dec 202630 Apr 20230
Saideep Dwarka
M/s. Saideep Construction and Land Developers
Near Katraj Ghat31 Dec 2026same0
Samarth Classic
M/s Saste Patil Developers
Moshi31 Dec 2026same0
Satvam Hills B7
SYMPHONY LANDMARKS LLP
Paud31 Dec 202630 Jan 20250
SHANTAI
Veer Buildcon
Bavdhan31 Dec 202631 Dec 20240
SHIVKUNJ
HR DEVELOPERS
Dehu31 Dec 202631 Dec 20250
SHIVVIHARPHASE2
ROYAL CONSTRUCTION
Charholi31 Dec 202631 Dec 20250
SHREEYOG
S K DEVELOPERS
MIDC Ranjangaon Ganpati31 Dec 202631 Dec 20240
SHRI SWAMI SAMARTH RESIDENCY
M/S SHRI SWAMI SAMARTH BUILDERS AND DEVELOPERS
Dighi31 Dec 202631 Mar 20240
SHRIRAM CORNER PHASE 2
VISION PROPERTIES
Dhayari31 Dec 202630 Apr 20260
SIDDHAAYA PARK
S K REALTY GROUP
Dighi31 Dec 202631 Dec 20250
SOLASTA A BUILDING
GIRITIRTHA ASSOCIATES
Ravet31 Dec 202631 Dec 20250
Solitaire Business Hub -III, Phase- I, Baner
Baner Land Developers LLP
Baner31 Dec 202630 Dec 202555
SOLITAIRE BUSINESS HUB PHASE I, SOLITAIRE WORLD
Classic Promoters and Builders Private Limited
Bibwewadi31 Dec 202630 Jun 20236
Solitaire Business Hub-III-Phase-II,Baner
BANER LAND DEVELOPERS LLP
Baner31 Dec 202630 Dec 202527
Solitaire Business Hub-III-Phase-III,Baner
Baner Land Developers LLP
Baner31 Dec 202630 Dec 202539
SONIGARA SHLOKA
RAMESH KESARIMAL SONIGARA
Chikhali Pune31 Dec 2026same0
SUMANGAL HOMES
CHANDERE PATIL CONSTRUCTIONS
Near Shitalamata Mandir31 Dec 202612 Aug 20250
SURYAKALA APARTMENT
MATRIX DEVELOPERS
Paravti Gaothan31 Dec 202631 Dec 20250
SUVARNA NAGARI PH-2
Maheshwari Developers
Charholi Khurd31 Dec 2026same0
SUYOG LEHER COMMERCIAL J BUILDING
SUYOG DEVELOPMENT CORPORATION UNIT NO.18
Kondhwa31 Dec 202630 Dec 20230
TERRA GREENS
BHAGWATI GROUP
Sangavade31 Dec 202631 Dec 20250
The Deva Residences
SURESH DEVENDRA KOTHARI HUF
Wanowarie31 Dec 2026same0
THE PEARL
BHOSALE GAVHANE ASSOCIATES
Moshi Pradhikaran31 Dec 2026same1
The Pwc Towers Phase I
Badamikar Realities Pvt Ltd
Bhugaon31 Dec 2026same4
TOWNSCAPES
GRUHA NAVNIRMAN HOUSING
Shivajinagar Bhamburda31 Dec 202631 Dec 20243
TREASURE GARDEN
SHRI SWAMI SAMARTH DEVELOPERS
Haveli31 Dec 202612 Dec 20240
TRIAA VASANTAM CITY CENTER PHASE 1
Triaa Realtors LLP
Dhanori31 Dec 202631 Dec 20240
Urban Life Phase 1
Kakade Vtp Associates
Nagar Road31 Dec 202631 Dec 202118
Urja Cornerstone Building 2
Vimal Gordhanbhai Pipalia
Grampanchayat31 Dec 202631 Dec 20195
Vasant Estella
SHRIKRISHNA WONDER PROPERTIES
Akurdi31 Dec 2026same0
VASUNDHARA HERITAGE
Vinod Shatrughan Amale
Ganesh Nagar Pirangut31 Dec 202630 Sep 20250
VELVET VILLAS PHASE 2
ASHDAN DEVELOPERS PRIVATE LIMITED (VTP)
Manjari Kh31 Dec 202631 Dec 20250
VENKATESH NANDANVAN A WING
SANJAY DNYANOBA JAGTAP
Saswad31 Dec 2026same0
VIVAAN PARK
SHRIRAM ASSOCIATES
Lohgaon31 Dec 2026same0
VIVANTA AARANYA
PUNAMIYA URBAN DEVELOPMENT LLP
Ravet31 Dec 2026same0
VNSVL Shubh Nirvana Phase III
Viman Nagar Shubh Ventures LLP
Viman Nagar31 Dec 2026same0
VRUNDAWAN PARK C BUILDING
vedant developers
Kasba31 Dec 202631 Dec 20250
Westfield 23
GRD Westfield Realty LLP
Cummins Campus31 Dec 202631 Dec 20240
World One Solitaire World
Classic Promoters and Builders Private Limited
Bibwewadi31 Dec 202630 Dec 20235
World Two - Solitaire World
Classic Promoters and Builders Private Limited
Bibwewadi31 Dec 202630 Dec 20240
YASHADA BUSINESS ZONE
Yashada Brothers
Baner31 Dec 2026same0

Other years in Pune: 2027 (910) · 2028 (867) · 2029 (707) · 2030 (446) · 2031 (298)

Source: GharKundli’s check of MahaRERA records. More projects appear as GharKundli reads them.