Aditya Redevelopment of Building No 96
by ADITYA ENTERPRISES · Tilak Nagar SO Mumbai, Mumbai 400089Also near Chembur, Ghatkopar East, PanvelRegistered on MahaRERA as “REDEVELOPMENT OF BUILDING NO 96”
What’s in the report? →Possession date of Aditya Redevelopment of Building No 96 (MahaRERA P51800013568): 31 May 2025, moved from 31 May 2019 (72 months later), and it has already passed. It has 66 homes (1 BHK and 2 BHK, 335–773 sq ft carpet), 90% sold or booked. No complaints on MahaRERA. How to check it yourself
Registered on MahaRERA under P51800013568. Status: Lapsed (registration period ended).
Source: MahaRERA website — records for P51800013568, read and compiled by GharKundli. Facts as filed on MahaRERA, no opinions.
The latest completion date on MahaRERA (May 2025) has passed.
What do you want to know about Aditya Redevelopment of Building No 96?
Completion date nikal chuki hai. Kya poochna hai?Tap a question. We’ll answer you on WhatsApp, free.
How the possession date of Aditya Redevelopment of Building No 96 has moved
31 May 2019
Completion date given when the project was registered
30 May 2020
Extended at the builder's request (MahaRERA application EXT51800001928)
Reason the builder gave MahaRERA:
“REQUIRED PAYMENTS FOR CC WERE MADE TO MCGM 0N 31ST MARCH 2017, FINAL CC WAS OBTAINED ON 06TH OCTOBER 2018. MUTIPLE ADDITIONAL CONDITIONS WERE REQUESTED BY MCGM WHICH WERE NOT MENTIONED AT THE TIME OF PLAN APPROVAL. ADDITIONAL REQUIREMENT TO…” Read the full reason
“REQUIRED PAYMENTS FOR CC WERE MADE TO MCGM 0N 31ST MARCH 2017, FINAL CC WAS OBTAINED ON 06TH OCTOBER 2018. MUTIPLE ADDITIONAL CONDITIONS WERE REQUESTED BY MCGM WHICH WERE NOT MENTIONED AT THE TIME OF PLAN APPROVAL. ADDITIONAL REQUIREMENT TO GET PERMISSION FROM SWM DEPT OF MCGM TO DUMP THE DEBRIS AT MCGM DESIGNATED SITE WAS MADE MANDATORY BY SUPREME COURT ORDER. TIME WAS SPENT BY MCGM TO IDENTIFY THE DUMPING SITES AND PROMOTERS HAD TO SUBMIT BANK GUARANTEES AND UNDERTAKINGS TO AVAIL THE DUMPING PERMISSIONS. ALSO CHANGE IN THE PLANNING AUTHORITY FROM MCGM TO MHADA (FOR PROJECTS ON MHADA LAND)…”31 May 2022
Extended at the builder's request (MahaRERA application EXT51800009238)
Reason the builder gave MahaRERA:
“Due to the Carona Virus this project was majorly affected and was delayed due to the nonavailability of laborers and material. But We have managed to complete the construction of the project in all respects. We are in process of obtaining N…” Read the full reason
“Due to the Carona Virus this project was majorly affected and was delayed due to the nonavailability of laborers and material. But We have managed to complete the construction of the project in all respects. We are in process of obtaining NOC'srequired for application of Occupation Certificate for this project. The Electric meters, Fire System and Water supply also has been provided to this project. The Buyers have started interior work in their respective flats and are awaiting the OC to move into their flats. We are requesting you to give us an extension till 31st December 2021 so that we…”31 May 2023
Extended at the builder's request (MahaRERA application EXT51800012295)
Reason the builder gave MahaRERA:
“We have completed the construction of the project in all respects. We are in process of obtaining the Occupation Certificate for this project. The Electric meters, Fire System and Water supply also has been provided to this project. The Buy…” Read the full reason
“We have completed the construction of the project in all respects. We are in process of obtaining the Occupation Certificate for this project. The Electric meters, Fire System and Water supply also has been provided to this project. The Buyers have started interior work in their respective flats and are awaiting the OC to move into their flats. We are requesting you to give us an extension till 31st May 2023 so that we can obtain the OC and hand over the flats to the buyers.”31 May 2024
Extended at the builder's request (MahaRERA application EXT51800017549)
Reason the builder gave MahaRERA: “We have 100% completed the construction of the building and are awaiting the OC. The obtaining of OC process is taking time. We need more time to finish obtaining OC.”
31 May 2025
Extended at the builder's request (MahaRERA application EXT51800022969)
Reason the builder gave MahaRERA:
“We are in process of obtaining final OC from MHADA. It is taking longer than usual due to changes in rules and non availability of approvals during election time. The construction and development of the building is 100% complete. We will se…” Read the full reason
“We are in process of obtaining final OC from MHADA. It is taking longer than usual due to changes in rules and non availability of approvals during election time. The construction and development of the building is 100% complete. We will secure the Final OC soon.”
Source: Aditya Redevelopment of Building No 96’s extension records on MahaRERA (P51800013568), read by GharKundli in October 2026. The builder’s reasons are quoted as filed. Your own possession date is the one in your agreement for sale.
What builders tell MahaRERA when they’re late: 14,973 applications analysed →GharKundli’s full report on Aditya Redevelopment of Building No 96
Read from every filing on MahaRERA when you open it
- Risk & trust score, every point explained
- What the title report says about the land
- Each of the 11 court cases, and how it ended
- Construction pace against the May 2025 deadline
- Agreement clauses weaker than the RERA model
- Escrow audit, loans and the builder's record
- Questions to get answered in writing before you pay
- MahaRERA registration
- P51800013568
- Status
- Lapsed (registration period ended)
- Builder
- ADITYA ENTERPRISES
- Location
- Tilak Nagar SO Mumbai, Mumbai · 400089
- Project type
- Residential / Group Housing
- Registered on
- 13 Oct 2017
- Completion date at registration
- May 2019
- Latest completion date
- May 2025
- Delay so far
- 72 months
- Homes
- 66
- Sold or booked
- 90%
- Towers
- 2
- Complaints on MahaRERA
- 0
- Court cases listed
- 11
- Title report on file
- Not found
- Builder's other MahaRERA projects
- 10
Construction progress of Aditya Redevelopment of Building No 96, as filed by the builder
What the builder has reported to MahaRERA, as GharKundli read it in October 2026. GharKundli’s full report compares it with the deadline.
| Tower / wing | Plinth | Slabs (structure) | Internal work | Lifts, fire & electrical |
|---|---|---|---|---|
| WING B | 100% | 100% | 100% | 100% |
| WING A | 100% | 100% | 100% | 100% |
Commencement certificate (CC), as filed on MahaRERA
- WING B: covers 10 floors
- WING A: covers 10 floors
Want to know when this changes? Kundli Watch sends a free WhatsApp update on Aditya Redevelopment of Building No 96 every 1–2 months.
Aditya Redevelopment of Building No 96: buildings, flats and land, as filed on MahaRERA
| Type | Carpet area (sq ft) | Units |
|---|---|---|
| 1 BHK | 335 – 749 | 41 |
| 2 BHK | 528 – 773 | 25 |
- Buildings: WING B (10 floors, 32 units) · WING A (10 floors, 34 units)
- Car parking: 1 covered
- Land: 1,020 sq m (about 0.3 acres) · sanctioned built-up 3,521 sq m
- Boundaries filed include: ROAD NUMBER 13
- Land, as filed: CTS No. 507 pt
- Map: the location the builder filed on MahaRERA · Get directions
The builder’s record and reviews
Not enough of this builder’s other MahaRERA projects have reached their promised date to judge yet.
Read Google reviews of Aditya Redevelopment of Building No 96 →Reviews on Google are opinions by Google users; GharKundli doesn’t check them.
Kundli Watch
Aditya Redevelopment of Building No 96: buyers & owners
Free: a construction progress update on WhatsApp every 1–2 months, and straight away when anything changes on MahaRERA — a later completion date, new complaints, a red flag. Your number stays private: never shown to other members or the builder.
Be the first to watch this project.
How are you connected to this project?
Watching needs only WhatsApp or your number. Bought here? No document needed now. From the builder’s team? Join to answer buyers’ questions; you never see members’ details. Owners and the builder’s team sign in with a one-time code, then come straight back here.
Common questions about Aditya Redevelopment of Building No 96
What is the possession date of Aditya Redevelopment of Building No 96?
According to GharKundli's check of MahaRERA records (updated October 2026), the latest completion date filed on MahaRERA for Aditya Redevelopment of Building No 96 in Tilak Nagar SO Mumbai, Mumbai is 31 May 2025 — 72 months later than 31 May 2019, the date given at registration. That date has already passed.
The date has already moved 72 months. Will it move again? Check the real pace of construction →
Is the builder's possession date different from the MahaRERA date for Aditya Redevelopment of Building No 96?
Builders and listing sites often quote an earlier "target" date for handover. The completion date Aditya Redevelopment of Building No 96's builder has filed on MahaRERA, the official one, is 31 May 2025, already 72 months later than the 31 May 2019 given at registration, per GharKundli's check of MahaRERA records. If possession is late, what counts under RERA (Section 18) is the possession date written in your agreement for sale.
Why was the possession date of Aditya Redevelopment of Building No 96 extended?
According to GharKundli's check of MahaRERA records (updated October 2026), Aditya Redevelopment of Building No 96's builder applied to MahaRERA to extend the completion date 5 times: to 30 May 2020, giving the reason "REQUIRED PAYMENTS FOR CC WERE MADE TO MCGM 0N 31ST MARCH 2017, FINAL CC WAS OBTAINED ON 06TH OCTOBER 2018. MUTIPLE ADDITIONAL CONDITIONS WERE REQUESTED BY MCGM WHICH WERE NOT MENTIONED AT THE TIME OF PLAN APPROVAL. ADDITIONAL REQUIREMENT TO GET PERMISSION FROM SWM DEPT OF MCGM TO DUMP THE DEBRIS AT MCGM DESIGNATED SITE WAS MADE MANDATORY BY SUPREME COURT ORDER. TIME WAS SPENT BY MCGM TO IDENTIFY THE DUMPING SITES AND PROMOTERS HAD TO SUBMIT BANK GUARANTEES AND UNDERTAKINGS TO AVAIL THE DUMPING PERMISSIONS. ALSO CHANGE IN THE PLANNING AUTHORITY FROM MCGM TO MHADA (FOR PROJECTS ON MHADA LAND)…"; to 31 May 2022, giving the reason "Due to the Carona Virus this project was majorly affected and was delayed due to the nonavailability of laborers and material. But We have managed to complete the construction of the project in all respects. We are in process of obtaining NOC'srequired for application of Occupation Certificate for this project. The Electric meters, Fire System and Water supply also has been provided to this project. The Buyers have started interior work in their respective flats and are awaiting the OC to move into their flats. We are requesting you to give us an extension till 31st December 2021 so that we…"; to 31 May 2023, giving the reason "We have completed the construction of the project in all respects. We are in process of obtaining the Occupation Certificate for this project. The Electric meters, Fire System and Water supply also has been provided to this project. The Buyers have started interior work in their respective flats and are awaiting the OC to move into their flats. We are requesting you to give us an extension till 31st May 2023 so that we can obtain the OC and hand over the flats to the buyers."; to 31 May 2024, giving the reason "We have 100% completed the construction of the building and are awaiting the OC. The obtaining of OC process is taking time. We need more time to finish obtaining OC."; to 31 May 2025, giving the reason "We are in process of obtaining final OC from MHADA. It is taking longer than usual due to changes in rules and non availability of approvals during election time. The construction and development of the building is 100% complete. We will secure the Final OC soon.".
What is the RERA number of Aditya Redevelopment of Building No 96?
According to GharKundli's check of MahaRERA records (updated October 2026), the MahaRERA registration number of Aditya Redevelopment of Building No 96 in Tilak Nagar SO Mumbai, Mumbai is P51800013568.
Is Aditya Redevelopment of Building No 96 registered with MahaRERA?
According to GharKundli's check of MahaRERA records (updated October 2026), Aditya Redevelopment of Building No 96 is registered as P51800013568 and its status is "Lapsed (registration period ended)".
What is the current construction status of Aditya Redevelopment of Building No 96? How much work is done?
According to GharKundli's check of MahaRERA records (updated October 2026), Aditya Redevelopment of Building No 96's status on MahaRERA is "Lapsed (registration period ended)". As filed by the builder, slab work is 100% done across 2 towers. GharKundli's full report compares construction progress with the deadline.
Does Aditya Redevelopment of Building No 96 have complaints on MahaRERA?
No complaints were listed on MahaRERA as of October 2026, per GharKundli's weekly check.
Is Aditya Redevelopment of Building No 96 safe to buy?
According to GharKundli's check of MahaRERA records (updated October 2026), Aditya Redevelopment of Building No 96 is registered on MahaRERA as P51800013568, its MahaRERA status is "Lapsed (registration period ended)", its completion date has moved 72 months since registration and no complaints are listed against it. GharKundli doesn't call a project safe or unsafe from these numbers alone: its full report gives a risk & trust score with every point explained.
How much GST is payable on a flat in Aditya Redevelopment of Building No 96?
Aditya Redevelopment of Building No 96 isn't marked completed on MahaRERA, so until the occupancy certificate is issued GST applies to a new flat: 5% of the price, with no input tax credit. The lower 1% rate is only for "affordable" homes: carpet area up to 60 sq m (about 646 sq ft) in the Mumbai region, and price up to ₹45 lakh. Some flats in Aditya Redevelopment of Building No 96 are 335 sq ft carpet, small enough for 1% if the price is ₹45 lakh or less. There is no GST on stamp duty or registration, and none once the occupancy certificate is issued.
What is the stamp duty and registration cost for a flat in Aditya Redevelopment of Building No 96?
For a flat in Aditya Redevelopment of Building No 96 (Mumbai), stamp duty is 6% of the agreement value, or of the ready reckoner value if that's higher, including 1% Metro Cess. A woman buying in her own name pays 5%. Registration is 1% of the value, capped at ₹30,000. On a ₹1 crore flat that's about ₹6 lakh in stamp duty plus ₹30,000 registration. GharKundli's property cost calculator works it out for your price: gharkundli.com/tools/property-cost-calculator
Has Aditya Redevelopment of Building No 96 received its OC? Is it ready to move in?
Not yet. According to GharKundli's check of MahaRERA records (updated October 2026), Aditya Redevelopment of Building No 96 isn't completed: its MahaRERA status is "Lapsed (registration period ended)", with 31 May 2025 as the latest completion date filed on MahaRERA, and that date has passed. A flat is ready to move in only once the occupancy certificate (OC) is issued, after construction is complete.
What does "lapsed" mean for Aditya Redevelopment of Building No 96?
According to GharKundli's check of MahaRERA records (updated October 2026), Aditya Redevelopment of Building No 96's registration shows as lapsed on MahaRERA. Lapsed means the completion date on MahaRERA (31 May 2025) passed without the project being marked complete or the registration being extended. Before paying anything, ask the builder in writing whether an extension has been applied for.
Is Aditya Redevelopment of Building No 96 a redevelopment or SRA project?
According to GharKundli's check of MahaRERA records (updated October 2026), Aditya Redevelopment of Building No 96 is a redevelopment: 24 of its flats are set aside for existing occupants (rehab), and the rest are for sale.
Has Aditya Redevelopment of Building No 96 uploaded its title report on MahaRERA?
According to GharKundli's check of MahaRERA records (updated October 2026), no title report for Aditya Redevelopment of Building No 96 was found on MahaRERA. Builders are expected to upload one; before booking, ask the builder for the advocate's title certificate in writing.
No title report is on MahaRERA for this project. See which documents are missing →
How can I get updates if Aditya Redevelopment of Building No 96's possession date changes?
The latest dates are on Aditya Redevelopment of Building No 96's MahaRERA page (P51800013568). GharKundli's Kundli Watch sends a free WhatsApp update on Aditya Redevelopment of Building No 96 every 1–2 months, and straight away when anything changes on MahaRERA: a later completion date, new complaints or a red flag. Your number is never shown to the builder.
How many floors does Aditya Redevelopment of Building No 96 have?
According to GharKundli's check of MahaRERA records (updated October 2026), Aditya Redevelopment of Building No 96 has 2 buildings filed: WING B with 10 floors and 32 units; WING A with 10 floors and 34 units.
What are the flat sizes (carpet area) in Aditya Redevelopment of Building No 96?
According to GharKundli's check of MahaRERA records (updated October 2026), the builder has filed these homes for Aditya Redevelopment of Building No 96: 1 BHK: 335 to 749 sq ft carpet (41 homes); 2 BHK: 528 to 773 sq ft carpet (25 homes). Carpet area is the usable floor area inside the walls, as defined under RERA.
How much parking does Aditya Redevelopment of Building No 96 have?
According to GharKundli's check of MahaRERA records (updated October 2026), the builder has filed 1 covered car parking spaces for Aditya Redevelopment of Building No 96.
How big is the land of Aditya Redevelopment of Building No 96?
According to GharKundli's check of MahaRERA records (updated October 2026), Aditya Redevelopment of Building No 96 stands on 1,020 sq m of land (about 0.3 acres), with 3,521 sq m of sanctioned built-up area.
What are the reviews of Aditya Redevelopment of Building No 96?
Google Maps has reviews of Aditya Redevelopment of Building No 96 written by Google users; GharKundli links to them on this page but doesn't check them. For facts rather than opinions: no complaints are listed on MahaRERA, and Kundli Watch shows verified owners of the project.
What is the address and pincode of Aditya Redevelopment of Building No 96?
Aditya Redevelopment of Building No 96 by ADITYA ENTERPRISES is in Tilak Nagar SO Mumbai, Mumbai, pincode 400089 (near Chembur, Ghatkopar East, Panvel), Maharashtra, and is registered on MahaRERA as P51800013568, per GharKundli's check of MahaRERA records. Its boundaries filed there include ROAD NUMBER 13. Its land is filed as CTS No. 507 pt. GharKundli lists all 75 MahaRERA projects in Chembur (400089).
How many flats are in Aditya Redevelopment of Building No 96, and how many are sold?
According to GharKundli's check of MahaRERA records (updated October 2026), Aditya Redevelopment of Building No 96 has 66 homes in 2 towers registered on MahaRERA, and 90% of them are sold or booked.
When was Aditya Redevelopment of Building No 96 registered on MahaRERA?
According to GharKundli's check of MahaRERA records (updated October 2026), Aditya Redevelopment of Building No 96 was registered on MahaRERA on 13 October 2017. GharKundli did not find a title report on the land on file there.
Does Aditya Redevelopment of Building No 96 have any legal issues or court cases?
11 court cases are listed for Aditya Redevelopment of Building No 96 on MahaRERA, per GharKundli's check of MahaRERA records (updated October 2026). GharKundli's full report explains each case and how it ended.
A court case can stall a project or tie up the land. See what each case is about →
Who is the builder / developer of Aditya Redevelopment of Building No 96?
According to GharKundli's check of MahaRERA records (updated October 2026), the builder is ADITYA ENTERPRISES, which has 10 other projects registered on MahaRERA.
Check it yourself on MahaRERA
- How to check the possession date of Aditya Redevelopment of Building No 96
- How to find and verify a MahaRERA number
- How to check construction status on MahaRERA
- Occupancy certificate (OC): what to check before possession
- Possession delayed? Work out the interest the builder owes
- How to file a MahaRERA complaint against a builder
- Where MahaRERA complaints are: the data
- Why builders ask MahaRERA for more time: the data
Other projects in Chembur (400089)
- Saptashringi
- Tigon Earth
- Silicon Hofe B Wing
- Amber Empire
- Srushti Raj Siddhi
- Srushtiraj Tower
- Sana Crystal
- Ampple-one
Other projects by ADITYA ENTERPRISES
Data compiled by GharKundli (gharkundli.com) from MahaRERA public records, as of October 2026. Check the project’s MahaRERA page for the latest filings. Not legal advice.