Runwal Gardens Phase 8 Bldg No. 43 and 45

by Runwal Residency Private Limited · Dombivali, ThaneAlso near Bhiwandi, Vidyashram

Possession date of Runwal Gardens Phase 8 Bldg No. 43 and 45: 30 September 2028, moved from 31 December 2026 (21 months later). This is the latest completion date the builder has filed on MahaRERA. How to check it yourself

Registered on MahaRERA under P51700052441, and currently active. 3 complaints are listed against it on MahaRERA.

Source: GharKundli’s check of MahaRERA records, October 2026.

What do you want to know about Runwal Gardens Phase 8 Bldg No. 43 and 45?

Ask us on WhatsAppNo login needed. A real person replies.

How the possession date of Runwal Gardens Phase 8 Bldg No. 43 and 45 has moved

  1. 31 December 2026

    Completion date given when the project was registered

  2. 30 September 2028

    Extended at the builder's request (MahaRERA application EA15052620972)

    Reason the builder gave MahaRERA:
    “The delay in the completion of the project has primarily occurred due to the encounter of unexpected hard rock strata during the excavation and foundation stage, which required a shift from standard methods to highly time-consuming, special…” Read the full reason“The delay in the completion of the project has primarily occurred due to the encounter of unexpected hard rock strata during the excavation and foundation stage, which required a shift from standard methods to highly time-consuming, specialized rock-breaking techniques. This initial geological setback resulted in an unavoidable delay of approximately 9 to 10 months and significantly hindered subsequent structural works. Furthermore, the project's timeline was severely impacted by the poor performance of the initial RCC contractor, Jiban Construction Rising Private Limited, which caused a cu…”

Source: Runwal Gardens Phase 8 Bldg No. 43 and 45’s extension records on MahaRERA (P51700052441), read by GharKundli in October 2026. The builder’s reasons are quoted as filed. Your own possession date is the one in your agreement for sale.

What builders tell MahaRERA when they’re late: 14,973 applications analysed →

GharKundli’s full report on Runwal Gardens Phase 8 Bldg No. 43 and 45

Read from every filing on MahaRERA when you open it

  • Risk & trust score, every point explained
  • What the title report says about the land
  • Each of the 3 complaints, and how it ended
  • Construction pace against the September 2028 deadline
  • Agreement clauses weaker than the RERA model
  • Escrow audit, loans and the builder's record
  • Questions to get answered in writing before you pay

Other wings and phases of this project

Each is registered on MahaRERA separately, with its own possession date. Check the one your flat is in.

MahaRERA registration
P51700052441
Status
Registered and active
Builder
Runwal Residency Private Limited
Location
Dombivali, Thane · 421204
Project type
Residential / Group Housing
Registered on
25 Aug 2023
Completion date at registration
December 2026
Latest completion date
September 2028
Delay so far
21 months
Homes
248
Sold or booked
61%
Towers
2
Complaints on MahaRERA
3
Court cases listed
0
Title report on file
Not found
Builder's other MahaRERA projects
17

Construction progress of Runwal Gardens Phase 8 Bldg No. 43 and 45, as filed by the builder

What the builder has reported to MahaRERA, as GharKundli read it in October 2026. GharKundli’s full report compares it with the deadline.

Tower / wingPlinthSlabs (structure)Internal workLifts, fire & electrical
Bldg No 43100%57%15%0%
Bldg No 45100%26%0%0%

Commencement certificate (CC), as filed on MahaRERA

  • Bldg No 43: covers 31 (Ground + 30 Floors)
  • Bldg No 45: covers 31 (Ground + 30 Floors)

Want to know when this changes? Kundli Watch sends a free WhatsApp update on Runwal Gardens Phase 8 Bldg No. 43 and 45 every month.

Runwal Gardens Phase 8 Bldg No. 43 and 45: buildings, flats and land, as filed on MahaRERA

  • Buildings: Bldg No 43 (35 floors, 155 units) · Bldg No 45 (36 floors, 93 units)
  • Land: 1,245 sq m (about 0.3 acres) · sanctioned built-up 36,905 sq m · recreational space 1,055 sq m

The builder’s record and reviews

Not enough of this builder’s other MahaRERA projects have reached their promised date to judge yet.

Read Google reviews of Runwal Gardens Phase 8 Bldg No. 43 and 45 →Reviews on Google are opinions by Google users; GharKundli doesn’t check them.

Kundli Watch

Runwal Gardens Phase 8 Bldg No. 43 and 45: buyers & owners

Free: a WhatsApp update every month on this project, and straight away when anything changes on MahaRERA — a later completion date, new complaints, a red flag. Your number stays private: never shown to other members or the builder.

Be the first to watch this project.

How are you connected to this project?

Bought here? No document needed now. From the builder’s team? Join to answer buyers’ questions; you never see members’ details. You’ll sign in with a one-time code, then come straight back here.

Common questions about Runwal Gardens Phase 8 Bldg No. 43 and 45

What is the possession date of Runwal Gardens Phase 8 Bldg No. 43 and 45?

According to GharKundli's check of MahaRERA records (updated October 2026), the latest completion date filed on MahaRERA for Runwal Gardens Phase 8 Bldg No. 43 and 45 in Dombivali, Thane is 30 September 2028 — 21 months later than 31 December 2026, the date given at registration.

Is the builder's possession date different from the MahaRERA date for Runwal Gardens Phase 8 Bldg No. 43 and 45?

Builders and listing sites often quote an earlier "target" date for handover. The completion date Runwal Gardens Phase 8 Bldg No. 43 and 45's builder has filed on MahaRERA, the official one, is 30 September 2028, already 21 months later than the 31 December 2026 given at registration, per GharKundli's check of MahaRERA records. If possession is late, what counts under RERA (Section 18) is the possession date written in your agreement for sale.

Why was the possession date of Runwal Gardens Phase 8 Bldg No. 43 and 45 extended?

According to GharKundli's check of MahaRERA records (updated October 2026), Runwal Gardens Phase 8 Bldg No. 43 and 45's builder applied to MahaRERA to extend the completion date once: to 30 September 2028, giving the reason "The delay in the completion of the project has primarily occurred due to the encounter of unexpected hard rock strata during the excavation and foundation stage, which required a shift from standard methods to highly time-consuming, specialized rock-breaking techniques. This initial geological setback resulted in an unavoidable delay of approximately 9 to 10 months and significantly hindered subsequent structural works. Furthermore, the project's timeline was severely impacted by the poor performance of the initial RCC contractor, Jiban Construction Rising Private Limited, which caused a cu…".

What is the RERA number of Runwal Gardens Phase 8 Bldg No. 43 and 45?

According to GharKundli's check of MahaRERA records (updated October 2026), the MahaRERA registration number of Runwal Gardens Phase 8 Bldg No. 43 and 45 in Dombivali, Thane is P51700052441.

Is Runwal Gardens Phase 8 Bldg No. 43 and 45 registered with MahaRERA?

According to GharKundli's check of MahaRERA records (updated October 2026), Runwal Gardens Phase 8 Bldg No. 43 and 45 is registered as P51700052441 and its status is "Registered and active".

What is the construction status of Runwal Gardens Phase 8 Bldg No. 43 and 45?

According to GharKundli's check of MahaRERA records (updated October 2026), Runwal Gardens Phase 8 Bldg No. 43 and 45's status on MahaRERA is "Registered and active". As filed by the builder, slab work ranges from 26% to 57% across 2 towers. GharKundli's full report compares construction progress with the deadline.

Does Runwal Gardens Phase 8 Bldg No. 43 and 45 have complaints on MahaRERA?

3 complaints were listed on MahaRERA as of October 2026, per GharKundli's weekly check. GharKundli's full report explains each case and how it ended.

Is Runwal Gardens Phase 8 Bldg No. 43 and 45 safe to buy?

According to GharKundli's check of MahaRERA records (updated October 2026), Runwal Gardens Phase 8 Bldg No. 43 and 45 is registered on MahaRERA as P51700052441, its completion date has moved 21 months since registration and 3 complaints are listed against it. GharKundli doesn't call a project safe or unsafe from these numbers alone: its full report gives a risk & trust score with every point explained.

Does Runwal Gardens Phase 8 Bldg No. 43 and 45 have other wings or phases?

Yes. MahaRERA lists 14 other registrations of the same project, each with its own possession date: Runwal Gardens Phase 2 Bldg no 13-17 (P51700025677, possession 30 Jun 2025); Runwal Gardens Phase 2 Bldg no 18-23 (P51700024154, possession 30 Dec 2024); Runwal Gardens Phase 3 Bldg no 24-26 (P51700026228, possession 30 Jun 2025); Runwal Gardens Phase 3 Bldg No 27-28 (P51700026927, possession 30 Jun 2026); Runwal Gardens Phase 3 Bldg No 29-30 (P51700028344, possession 30 Jun 2026); Runwal Gardens Phase 4 Bldg No. 31-32 (P51700029155, possession 31 Dec 2026); and 8 more. Check that your agreement names the registration of your own wing.

How can I get updates if Runwal Gardens Phase 8 Bldg No. 43 and 45's possession date changes?

The latest dates are on Runwal Gardens Phase 8 Bldg No. 43 and 45's MahaRERA page (P51700052441). GharKundli's Kundli Watch sends a free WhatsApp update on Runwal Gardens Phase 8 Bldg No. 43 and 45 every month, and straight away when anything changes on MahaRERA: a later completion date, new complaints or a red flag. Your number is never shown to the builder.

How many floors does Runwal Gardens Phase 8 Bldg No. 43 and 45 have?

According to GharKundli's check of MahaRERA records (updated October 2026), Runwal Gardens Phase 8 Bldg No. 43 and 45 has 2 buildings filed: Bldg No 43 with 35 floors and 155 units; Bldg No 45 with 36 floors and 93 units.

How big is the land of Runwal Gardens Phase 8 Bldg No. 43 and 45?

According to GharKundli's check of MahaRERA records (updated October 2026), Runwal Gardens Phase 8 Bldg No. 43 and 45 stands on 1,245 sq m of land (about 0.3 acres), with 36,905 sq m of sanctioned built-up area and 1,055 sq m of recreational open space.

Where can I read reviews of Runwal Gardens Phase 8 Bldg No. 43 and 45?

Google Maps has reviews of Runwal Gardens Phase 8 Bldg No. 43 and 45 written by Google users; GharKundli links to them on this page but doesn't check them. For facts rather than opinions: 3 complaints are listed on MahaRERA, and Kundli Watch shows verified owners of the project.

Where is Runwal Gardens Phase 8 Bldg No. 43 and 45?

Runwal Gardens Phase 8 Bldg No. 43 and 45 by Runwal Residency Private Limited is in Dombivali, Thane (pincode 421204), near Bhiwandi, Vidyashram, Maharashtra, and is registered on MahaRERA as P51700052441, per GharKundli's check of MahaRERA records.

How many homes are in Runwal Gardens Phase 8 Bldg No. 43 and 45?

According to GharKundli's check of MahaRERA records (updated October 2026), Runwal Gardens Phase 8 Bldg No. 43 and 45 has 248 homes in 2 towers registered on MahaRERA, and 61% of them are sold or booked.

When was Runwal Gardens Phase 8 Bldg No. 43 and 45 registered on MahaRERA?

According to GharKundli's check of MahaRERA records (updated October 2026), Runwal Gardens Phase 8 Bldg No. 43 and 45 was registered on MahaRERA on 25 August 2023. GharKundli did not find a title report on the land on file there.

Are there court cases on Runwal Gardens Phase 8 Bldg No. 43 and 45?

No court cases are listed for Runwal Gardens Phase 8 Bldg No. 43 and 45 on MahaRERA, per GharKundli's check of MahaRERA records (updated October 2026).

Who is the builder of Runwal Gardens Phase 8 Bldg No. 43 and 45?

According to GharKundli's check of MahaRERA records (updated October 2026), the builder is Runwal Residency Private Limited, which has 17 other projects registered on MahaRERA.

All projects with possession due in 2028 in Thane →

Other projects in Dombivali

All 252 projects in Manpada (421204) →

Other projects by Runwal Residency Private Limited

Data compiled by GharKundli (gharkundli.com) from MahaRERA public records, as of October 2026. Check the project’s MahaRERA page for the latest filings. Not legal advice.