Possession due in 2028 · Palghar
According to GharKundli's check of MahaRERA records, 147 housing projects in Palghar have a MahaRERA completion date in 2028, out of 883 Palghar projects GharKundli has read in detail so far.
The date is the latest completion date the builder has filed on MahaRERA, including MahaRERA’s automatic 4-month extension of August 2026 where it applies. “First promised” is the date given at registration. Completed projects are not listed. Open a project for its full MahaRERA record.
| Project | Where | Possession due (MahaRERA) | First promised | Complaints |
|---|---|---|---|---|
| ALTURA UMELE RUBY LIFESPACES | Vasai | 27 Mar 2028 | 27 Nov 2027 | 0 |
| GANESHA HOMES SHRI GANESH KRIPA | Nalasopara West | 30 Mar 2028 | 1 Dec 2021 | 0 |
| ELANZA WING A STONEWALL BUILDCON LLP | Navghar | 31 Mar 2028 | 31 Mar 2027 | 1 |
| HAPPY HOME JASMINE WING A B Happy Home Corporation | Manikpur, Vasai | 31 Mar 2028 | 31 Mar 2027 | 0 |
| PARAMOUNT ENCLAVE PHASE - 2 TARANCHAL INFRAPROJECTS PRIVATE LIMITED | Mahim | 31 Mar 2028 | 30 Dec 2023 | 0 |
| VEER ATTAR V A HOUSING | Virar | 31 Mar 2028 | same | 1 |
| 4TUNE PRIDE SUSHILKUMAR TEJNARAYAN SHUKLA | Boisar | 30 Apr 2028 | 30 Dec 2024 | 1 |
| AARVI APARTMENT ARCHEN CONSTRUCTION LLP | Vasai | 30 Apr 2028 | 31 Dec 2027 | 0 |
| AMBROSIA 13 THDC NAGRI LLP | Kanchan Universe | 30 Apr 2028 | 31 Mar 2026 | 0 |
| Amin Heritage Crystal Realtors | Nallasopara West | 30 Apr 2028 | 31 Dec 2027 | 0 |
| ASHOK APARTMENT TRISHIKA HOMES | Palghar | 30 Apr 2028 | 31 Dec 2025 | 0 |
| AUM RESIDENCES Fia Developers Pvt. Ltd. | Palghar West | 30 Apr 2028 | 31 Dec 2027 | 0 |
| AV CRYSTAL PRESTIGE RELIABLE HOUSING INDIA PRIVATE LIMITED | Nallasopara East | 30 Apr 2028 | 26 Aug 2023 | 5 |
| AV SMART CITY PHASE 1 ADITYA REALTORS | Mahim | 30 Apr 2028 | 31 Dec 2027 | 0 |
| BHARAT BABAJI PLAZA SHIVAALIK REALITY | Bolinj | 30 Apr 2028 | 31 Dec 2027 | 0 |
| BLD NO.-5, WING-A, TYPE-H, VEER-3, PARASNATH NAGARI A R INFRA | Umroli East | 30 Apr 2028 | 28 Nov 2022 | 0 |
| CRYSTAL CROWN CRYSTAL VENTURES | Bhabhola | 30 Apr 2028 | 31 Dec 2027 | 0 |
| DHANANJAY HEIGHTS REALTECH INFRA | Nallasopara West | 30 Apr 2028 | 31 Dec 2027 | 0 |
| ELLORA CHSL GARCIA DEVELOPER | Nallasopara West | 30 Apr 2028 | 31 Dec 2027 | 0 |
| ESQUIRE JP INFRA&SALASAR BUILDCON LLP | Bhayander East | 30 Apr 2028 | 31 Dec 2027 | 1 |
| FIA AANGAN Fia Developers Pvt. Ltd. | Palghar West | 30 Apr 2028 | 31 Dec 2027 | 1 |
| FIA VATIKA Fia Developers Pvt. Ltd. | Palghar West | 30 Apr 2028 | 31 Dec 2027 | 0 |
| Gopikisan Patil Complex Bldg No 1 SUMATINATH ENTERPRISES | Naigaon East | 30 Apr 2028 | 31 Dec 2027 | 0 |
| HARIDHAM V M HOUSING | Virar | 30 Apr 2028 | 31 Dec 2027 | 0 |
| HIRAL KUNJ APT SADGURU DEVELOPERS | Achole | 30 Apr 2028 | 31 Dec 2027 | 0 |
| IDEAL AVENUE YADUVANSHI ENTERPRISES | Umroli | 30 Apr 2028 | 30 Jun 2025 | 0 |
| Imperial Splendora F wing Imperial Realtors | Vasai East | 30 Apr 2028 | 31 Dec 2027 | 0 |
| IPSIT SUKHANAND INCLINE REALTORS | Palghgar | 30 Apr 2028 | 31 Dec 2027 | 0 |
| JAY AMBE APARTMENT SAI INFRA | Palghar | 30 Apr 2028 | 31 Dec 2027 | 0 |
| Jay shree Laxmi Chsl om Jivdani Construction | Nallasopara | 30 Apr 2028 | 31 Dec 2027 | 0 |
| K K PARK - PHASE I K.K.CONSTRUCTION | Near Dandekar College | 30 Apr 2028 | 30 Dec 2025 | 0 |
| K M RESIDENCY KM REALITY | pam tembhi | 30 Apr 2028 | 30 Jun 2021 | 0 |
| Kaivalya Heights Shree Sai Entreprises | Vasai East | 30 Apr 2028 | 31 Dec 2025 | 0 |
| LA CASA PHASE II RIVIERA DEVELOPERS | Vasai West | 30 Apr 2028 | 31 Dec 2027 | 0 |
| LAXMI HEIGHTS JANAVI BUILDERS & DEVELOPERS | Waliv | 30 Apr 2028 | 31 Dec 2027 | 0 |
| MAHI REGENCY MOHAMMAD BARIK SHAUKAT SHAIKH | Umroli West | 30 Apr 2028 | 31 Aug 2024 | 0 |
| MAJESTIC TOWER-A PB CONSTRUCTION | Opp Dmart | 30 Apr 2028 | 31 Dec 2027 | 0 |
| MATHURADHAM RIDDHI SIDDHI REALTY | Umroli | 30 Apr 2028 | 30 Jul 2021 | 0 |
| MAULI RESIDENCY HOS NIRMAAN LLP | Vasai East | 30 Apr 2028 | 31 Dec 2027 | 0 |
| MEGH MALHAR Y K NAGAR DEVELOPMENT CORPORATION | Virar | 30 Apr 2028 | 31 Dec 2027 | 0 |
| N G PLATINUM CITY PHASE IV J M G REALTORS PVT LTD | Achole | 30 Apr 2028 | 31 Dec 2025 | 0 |
| Narayani Arcade NARAYANI ESTATE | Saphale | 30 Apr 2028 | 30 Dec 2022 | 0 |
| NAYAN-VASTU HERITAGE UNITY INFRA | Makane | 30 Apr 2028 | 31 Mar 2025 | 0 |
| Netra Life Space Darshan Realty | Palghar | 30 Apr 2028 | 31 Dec 2027 | 0 |
| Netra Residency AMICO REALTY | Village - Navali | 30 Apr 2028 | 31 Dec 2027 | 0 |
| OM SAI COMPLEX VARSHA PRAKASH NAIK | Kharodi Naka | 30 Apr 2028 | 30 Dec 2022 | 1 |
| PARAMOUNT HEIGHT MUNISH GROUP OF COMPANY | Vasai East | 30 Apr 2028 | 31 Dec 2027 | 0 |
| PARK VIEW CO OP HOUSING SOCIETY LIMITED PARKVIEW CO OP HOUSING SOCIETY LIMITED | Nallasopara West | 30 Apr 2028 | 31 Dec 2027 | 0 |
| PARTH PLAZA ZINAL BUILDERS AND DEVELOPERS | Saphale West | 30 Apr 2028 | 31 Dec 2027 | 0 |
| PRARTHANA CO-OPERATIVE HOUSING SOCIETY LIMITED SAMARTHA CONSTRUCTION | Nallsaopra | 30 Apr 2028 | 31 Dec 2027 | 0 |
| Prisha Heights SAFFRON DEVELOPERS | Borivali West | 30 Apr 2028 | 31 Dec 2027 | 0 |
| Rajmandir Gardens Raj Mandir Reality | Boisar | 30 Apr 2028 | 30 Dec 2023 | 0 |
| RAMABAI PARADISE SHREE SAI SHAKTI DEVELOPERS | Behind New Golden Nest | 30 Apr 2028 | 30 Dec 2025 | 0 |
| Redevelopement of Sagar Prakash Hsg Co-op Soc TRIMURTI CONSTRUCTION | Nallasopara East | 30 Apr 2028 | 15 Feb 2024 | 1 |
| RIDDHI SIDDHI APARTMENT RIDDHI SIDDHI APARTMENT | Umbarpada | 30 Apr 2028 | 31 Dec 2027 | 0 |
| RITU GARDENIA PHASE 2 RITU BUILDERS AND DEVELOPERS | Bhayander West | 30 Apr 2028 | 30 Dec 2023 | 1 |
| ROYAL DREAMS PRIDE ALBERT AUGSTIN RODRIGUES | Nallasopara East | 30 Apr 2028 | 1 Jun 2024 | 0 |
| ROYAL HEIGHTS ROYAL BUILDERS | Juchandra | 30 Apr 2028 | 31 Dec 2025 | 0 |
| Sadaram 9 National Life Space | Palghar | 30 Apr 2028 | 31 Dec 2027 | 0 |
| SAI BALAJI APARTMENT SHREE SWAMI SAMARTH DEVELOPERS | Virar West | 30 Apr 2028 | 31 Dec 2027 | 0 |
| Sai Laxmi SILVER & RASHI CONSTRUCTIONS | Bhaynder East | 30 Apr 2028 | 31 Dec 2027 | 0 |
| SAI NATH APARTMENT SAI MAULI DEVELOPERS | Saravali | 30 Apr 2028 | 31 Dec 2027 | 0 |
| SAI PRAJAKTA SUNIL MANGILAL JAIN | Bhayander | 30 Apr 2028 | 31 Dec 2027 | 0 |
| SAI RAM APARTMENT SAI MAULI DEVELOPERS | Saravali | 30 Apr 2028 | 31 Dec 2027 | 0 |
| SANSKRUTI ROSE SANSKRUTI BUILDER AND DEVELOPER | Nallasopara East | 30 Apr 2028 | 31 Dec 2025 | 0 |
| SERENO TRIO INFRASTRUCTURE PRIVATE LIMITED | Vasai | 30 Apr 2028 | 31 Dec 2026 | 1 |
| SHALIBHADRA HEIGHTS SHREE NAKODA DEVELOPERS | Nallasopara West | 30 Apr 2028 | 31 Dec 2027 | 0 |
| SHIV KRUPA COMPLEX SHREE RADHE CONSTRUCTION | Achole | 30 Apr 2028 | 30 Dec 2023 | 0 |
| SHIV SHAKTI DHAM J.S ENTERPRISES | Near Bandhan Resort | 30 Apr 2028 | 31 Dec 2027 | 0 |
| SHREE KRISHNA BHOOMI SHREE KRISHNA BUILDCON | Naigaon East | 30 Apr 2028 | 31 Dec 2025 | 0 |
| SHREE PURAM VASTU REALITIES | Umroli East | 30 Apr 2028 | 31 Mar 2019 | 0 |
| SHREE VASANT VIHAR NX C WING SHREE RIDDHI SIDDHI DEVELOPERS | Virar East | 30 Apr 2028 | 31 Dec 2027 | 0 |
| SHRI GANESHKRIPA KIRAN ENTERPRISES | Nallasopara West | 30 Apr 2028 | 31 Dec 2025 | 0 |
| SHRI KRISHNA V K HOSUING | Virar | 30 Apr 2028 | 31 Dec 2027 | 0 |
| SHRI SAIKRIPA KIRAN ENTERPRISES | Nallasopara West | 30 Apr 2028 | 31 Dec 2025 | 0 |
| SIGNATURECLASSIC bharatbhai devjibhai bhasotiya | waliv east | 30 Apr 2028 | 30 Sep 2023 | 0 |
| SWED GANGA SHREE SAI REALTORS | vasai | 30 Apr 2028 | 31 Dec 2027 | 1 |
| THE PANCHARATNA Radhe Builder and Developer | Vasai | 30 Apr 2028 | 31 Dec 2027 | 1 |
| THE WOODS - LEGACY AVENUE, A WING SILVERLINE CONSTRUCTION | Papdy, Vasai Road West | 30 Apr 2028 | 31 Dec 2027 | 0 |
| TRIPURA RESIDENCY AMRITA SANDIP BARMERA | Vasai | 30 Apr 2028 | 31 Dec 2024 | 0 |
| VASUDEV RATNA KRISHA BUILDERS | Bhayandar | 30 Apr 2028 | 31 Dec 2027 | 0 |
| YASHVI PRIDE BUILDING NO.3 WING-O YASHVI PRIDE LLP | Village Rajawali | 30 Apr 2028 | 31 Dec 2027 | 0 |
| YASHWANT CIRCLE RAJ ENTERPRISES | Virar West | 30 Apr 2028 | 31 Dec 2025 | 0 |
| ZALAWAD NAGAR BLDG NO. 1 CO-OP HSG. SOCIETY LTD. SHREE MAHAVIR BUILDERS AND DEVELOPERS | Achole | 30 Apr 2028 | 31 Dec 2027 | 0 |
| NORTHERN VILLAS BALAJI ENTERPRISES | Virar West | 13 May 2028 | 13 Jan 2028 | 0 |
| DREAM PARK DREAM BUILDERS | Wada | 30 May 2028 | 30 Jan 2028 | 1 |
| MARUDHAR HEIGHTS MARUDHAR BUILDERS | Palghar | 31 May 2028 | 31 May 2025 | 0 |
| NAKSHATRA HEIGHTS SWASTIK REALTORS | Tembhode | 31 May 2028 | 31 Jan 2028 | 0 |
| SHREE SALASAR ROW VILLAS RADHA KRISHNA REALTY | Dhansar | 31 May 2028 | 31 Jan 2028 | 0 |
| Casa Terraza Phase-3 R AND J BUILDLINE LLP | Diwanman | 30 Jun 2028 | 31 Dec 2025 | 1 |
| VALENCIA CHS VASTU VISION REALTORS | Virar West | 30 Jun 2028 | 30 Jun 2026 | 0 |
| ASHTAVINAYAK BUILDERS AND DEVELOPERS ASHTAVINAYAK BUILDERS AND DEVELOPERS | Kelve East | 30 Jul 2028 | 31 Dec 2025 | 0 |
| AKRUTI HEAVEN ASHISH ANIL PATIL | Palghar | 31 Jul 2028 | 31 May 2025 | 0 |
| AKSHAY CHSL V CONSTRUCTION | Veer Savarkar Marg | 31 Jul 2028 | 31 Mar 2028 | 0 |
| Dwarkadhish Nagar SHREE GEETANJALI BUILDERS | Man | 31 Jul 2028 | 31 Mar 2028 | 0 |
| GAVKAR PARADISE Kunjraj Enterprises | Saphale | 31 Jul 2028 | 31 Mar 2028 | 0 |
| IDEAL GARDEN GAJANAN BUILDERS & DEVELOPERS | Sayunkt Nagar | 31 Jul 2028 | 31 Mar 2019 | 0 |
| MAITRI HEIGHTS Mrunmayee Developers | Besides Shree Krishna Car Wash | 31 Jul 2028 | 31 Mar 2028 | 0 |
| MEGASTONE HORIZON Megastone Spaces | Tembhode | 31 Jul 2028 | 31 Mar 2026 | 0 |
| MUKUNDAN ASTRIA MUKUNDAN INFRA | Nallasopara West | 31 Jul 2028 | 31 Mar 2028 | 0 |
| NANA HEIGHTS SHREE SWAMI SAMARTH DEVELOPERS | Kopari, Virar East | 31 Jul 2028 | 31 May 2026 | 0 |
| NEW SANGEETA HEIGHTS BHAGYA LAXMI CONSTRUCTION CO. | Virar East | 31 Jul 2028 | 31 Mar 2028 | 0 |
| NIRMAANYA PARK JANTA REALTORS AND DEVELOPERS | Kardal | 31 Jul 2028 | 31 Mar 2028 | 0 |
| PARASNATH CORNER SHREENATH ENTERPRISES | Juchandra | 31 Jul 2028 | 30 Mar 2022 | 0 |
| PARASNATH TOWNSHIP SHREENATH ENTERPRISES | Panchali Gram Panchayat | 31 Jul 2028 | 31 Mar 2020 | 0 |
| PARVATI DARSHAN APARTMENT DHANLAXMI CONSTRUCTION | Boisar | 31 Jul 2028 | 31 Mar 2028 | 0 |
| SAI SANSKRUTI GENESIS INFRA PROJECTS | Boisar | 31 Jul 2028 | 31 Mar 2025 | 0 |
| SHALIBHADRA AMORA SUMATINATH BUILDERS | Nallasopara West | 31 Jul 2028 | same | 0 |
| SHREE GAYATRI CHSL APNA GHAR DEVELOPERS | Virar West | 31 Jul 2028 | 31 Mar 2028 | 0 |
| Shree Mahaveer Apartment BLDG. NO. - 1 - Type 2B/ B Wing SHREE MAHAVEER DEVELOPERS | Umroli, Palghar | 31 Jul 2028 | 31 Mar 2028 | 0 |
| Swastik Epitome Building 1 Phase II 8 to 14 floors MAHAVIR HOMES | Behind D'Mart | 31 Jul 2028 | 30 Dec 2021 | 0 |
| TANIA WILLOWS TANIA REALTORS | Vasai | 31 Jul 2028 | 31 Mar 2028 | 0 |
| VARDAAN Vardaan Developers | Bhabhola Naka, Village Barampur | 31 Jul 2028 | 31 Mar 2028 | 0 |
| VIDYA APARTMENT SPRUHA BUILDERS & DEVELOPERS | Virar East | 31 Jul 2028 | 31 Mar 2028 | 0 |
| RADHASHYAM CO-OPERATIVE HOUSING SOCIETY LIMITED shree sadguru realty | Nallasopara East | 1 Aug 2028 | 1 Apr 2028 | 0 |
| SHREE AMEYA CO-OP HOUSING SOCIETY LTD ORION VENTURES | Nallasopara East | 1 Aug 2028 | 1 Apr 2028 | 0 |
| Fort View Sunrise Construction | Khochiwade | 30 Aug 2028 | 30 Apr 2028 | 0 |
| FRENY AVENUE SUMITRA REALTORS | Vasai Nallasopara Link Road | 30 Aug 2028 | 28 Aug 2026 | 1 |
| MADHAV KUNJ RAJ SHUBH ONE BUILDER & DEVELOPER | Bolinj | 25 Sep 2028 | 25 May 2028 | 0 |
| DAYARAM RESIDENCY RAJESHWAR HOUSING | Palghar | 30 Sep 2028 | 31 May 2028 | 0 |
| JANKI PARK BUILDING No. 2 JANKI DEVELOPERS | Saphale East | 30 Sep 2028 | 30 May 2028 | 0 |
| VANDANA RESIDENCY Shree Krishna Developers | Nallasopara West | 30 Sep 2028 | 31 May 2028 | 0 |
| DWARAKA HEIGHTS FAMILY REALTY | Navali ,Palghar East | 30 Oct 2028 | 30 Jun 2028 | 0 |
| GALAXY EMPERIA PHASE-II GALAXY SHINE DEVELOPERS | Boisar | 30 Oct 2028 | 30 Jun 2028 | 0 |
| NAVKAR CITY PHASE I PART 6 NAVKAR ESTATE AND HOMES PVT LTD | Naigaon East | 30 Oct 2028 | 30 Jun 2027 | 0 |
| Ocean Homes - The Pearl Aditya Creations And Developers LLP | Boisar | 30 Oct 2028 | 30 Jun 2025 | 0 |
| SAROJ HEIGHTS SHREENATH CONSTRUCTIONS | Navghar | 30 Oct 2028 | same | 1 |
| SUPER HOMEZ-HARMONY PHASE II MANGALMURTI VINAY UNIQUE REALTORS | Dongre | 30 Oct 2028 | 30 Jun 2028 | 0 |
| VIDHIRA Fia Developers Pvt. Ltd. | Palghar West | 30 Oct 2028 | 30 Jun 2028 | 0 |
| Shri Ram Residency Shri Ram Builder & Developer's | Palghar | 13 Nov 2028 | 13 Jul 2028 | 0 |
| VIMAL'S RAMJANKI CHSL OMVIMAL BUILTCON LLP | Nilemore | 15 Nov 2028 | 15 Jul 2028 | 0 |
| ASTORIA ALMIGHTY HOMES | Vasai West | 30 Nov 2028 | 31 Jul 2028 | 0 |
| HARMONY HOMES GRAVITY INFRA | Palghar West | 30 Nov 2028 | 31 Jul 2028 | 0 |
| TAQWA HEIGHTS HALEEMA DEVELOPERS | Taki Pada | 30 Nov 2028 | 31 Jul 2028 | 0 |
| Vedant Complex VEDANT BUILDER AND DEVELOPERS | Nallasopara East | 30 Nov 2028 | 31 Jul 2028 | 0 |
| Aishani Royale Eskcays Estatess Private Limited | Palghar | 30 Dec 2028 | same | 0 |
| ARIHANT TOWER ARIHANT REALTY | Bhayandar | 31 Dec 2028 | same | 1 |
| BLDG NO 23 BLUE BELL M/s AMEYA BUILDERS & PROPERTY DEVELOPERS | Yashwant Nagar | 31 Dec 2028 | same | 0 |
| FAITH APARTMENT FAITH REALTY | Near Olanda Naka Agashi | 31 Dec 2028 | 30 Dec 2025 | 0 |
| Luxury Empire Township Phase I VEENAA DEVELOPERS PRIVATE LIMITED | Opposite Eklavya School | 31 Dec 2028 | 30 Dec 2025 | 8 |
| MARIGOLD CALCULUS REALTORS LLP | vasai west | 31 Dec 2028 | same | 0 |
| MITHILA COMPLEX NAVAL RAMBAHADUR SINGH | Kapase | 31 Dec 2028 | 20 Aug 2025 | 0 |
| ROZA RESIDENCY REACE INFRA | Village Samel | 31 Dec 2028 | same | 0 |
| SHRIPAL SATTVA BLDG. 2 SHRIPAL SATTVA LLP | Papdy | 31 Dec 2028 | same | 0 |
| SIDDHIVINAYAK CROWN SIDDHIVINAYAK DELEVOPERS | State/UT | 31 Dec 2028 | 28 Feb 2022 | 0 |
| SUNDAR HEIGHTS JAY JIVDANI CONSTRUCTION | Naringi | 31 Dec 2028 | same | 0 |
| SURAJ EMPIRE S S BUILDERS AND DEVELOPERS | Achole | 31 Dec 2028 | same | 0 |
Other years in Palghar: 2026 (61) · 2027 (231) · 2029 (132) · 2030 (113) · 2031 (97)
Source: GharKundli’s check of MahaRERA records. More projects appear as GharKundli reads them.