MahaRERA projects in Ambernath, Thane (421501)
According to GharKundli's check of MahaRERA records, 403 housing projects are registered in pincode 421501 (Ambernath, Thane). 162 are still being built, 66 with possession due by the end of 2027. For 234, the completion date on MahaRERA is later than the one first promised. 23 have at least one complaint filed on MahaRERA.
Pincode 421501 also covers: Ambarnath, Ambernath East, Morivali, Ambarnath East, Ambernath West, Vadavali.
“Possession due” is the latest completion date the builder has filed on MahaRERA; “first promised” is the date given at registration. Open a project for its full MahaRERA record.
| Project | MahaRERA status | Possession due (MahaRERA) | First promised | Complaints |
|---|---|---|---|---|
| ROYAL MANOR ABDUL GULAMPEER SHAIKH | De-registered | 1 Jun 2024passed | same | 0 |
| Navrang Co Op Hsg Society YADAV BROS CONSTRUCTION | Abeyance | 31 Dec 2024passed | same | 0 |
| PATELS GLORY SERENE INFRATECH CO | Active | 30 Oct 2026passed | 30 Jun 2026 | 0 |
| SHREE GAJANAN ENTERPRISES RUKHMINI CHS SHREE GAJANAN ENTERPRISES RUKHMINI CHS | Active | 30 Nov 2026 | 31 Jul 2026 | 0 |
| WALEKAR HOMES WALEKAR & SON'S DEVELOPERS | Active | 28 Dec 2026 | 28 Aug 2026 | 0 |
| PATELS EIRENE PRAMUKH DEVELOPERS | Active | 31 Dec 2026 | 31 Aug 2026 | 0 |
| PATELS FALCON PRAMUKH DEVELOPERS | Active | 31 Dec 2026 | 30 Jun 2024 | 0 |
| SAI GAONDEVI DARSHAN CHS LTD Anil Dattaram Gaikwad | Active | 31 Dec 2026 | 27 Jan 2025 | 0 |
| ASHOK SMRUTI Asha Construction | Active | 30 Jan 2027 | 30 Sep 2026 | 0 |
| GNP GALAXY PHASE - III ROSHNI ENTERPRISES | Active | 30 Jan 2027 | 30 Sep 2025 | 2 |
| PARITOSH CO OPERATIVE HOUSING SOCIETY LIMITED DEVEN AJIT ADARKAR | Active | 30 Jan 2027 | 31 May 2026 | 0 |
| ESAN NILAYAM APARTMENT YASH BHUPESH DESHAWARE | Active | 12 Feb 2027 | 12 Oct 2026 | 0 |
| SAI SUJAS RESIDENCY SHREERAM BUILDCON | Active | 15 Mar 2027 | 15 Nov 2026 | 0 |
| MEERA NANDA BLISS MEERA HOMES LLP | Active | 30 Mar 2027 | 30 Nov 2026 | 0 |
| Raj Residency Vijay Chahu Patil | Active | 30 Mar 2027 | 30 Nov 2026 | 0 |
| Tulsi Galaxy Manas Associates | Active | 31 Mar 2027 | 31 Dec 2025 | 0 |
| CHAITRABAN CHS ANNAPURNA ENTERPRISES | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Dipti Skycity Bldg No. 7 Dipti Home Makers Pvt Ltd | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| IMPERIAL HEIGHTS KRISHNA DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2025 | 0 |
| Jai Shriram CO-Operative Housing Society Ltd. M/S. PRAVEEN BUILDCON | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| JHALAK ELENZA SHIVAM CONSTRUCTION CO | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| JP GALAXY JP CORP LLP | Active | 30 Apr 2027 | 30 Dec 2025 | 0 |
| KARTIK GANESH JAI MATA JI DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| KHER ENCLAVE AMI PROPERTIES | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| KRUSHNA VIHAR - PHASE I KRUSHAN DHAM BUILDERS & DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| MADHUSUDAN BUILDING MADHUSUDAN BUILDCON | Active | 30 Apr 2027 | 31 Dec 2023 | 0 |
| MOHAN PRECIOUS GREENS PHASE I MOHAN DEVELOPERS LLP | Active | 30 Apr 2027 | 31 Dec 2026 | 1 |
| NAKSHATRA RESIDENCY NAKSHATRA LIFESPACES | Active | 30 Apr 2027 | 31 Dec 2026 | 1 |
| Namo Shri Siddhivinayak CHSL Shivneri Construction | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| NEELKANTH ROYALE PALMS - F WING PHASE II NEELKANTH ASSOCIATES | Active | 30 Apr 2027 | 1 Apr 2020 | 0 |
| PATELS ASPIRE PRAMUKH DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2026 | 1 |
| Prakash Palace R K Builders and Developers | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Precious Harmony NX P.G. CONSTRUCTIONS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Radhe Govind Commercial Complex Shree Radha Construction | Active | 30 Apr 2027 | 31 Dec 2023 | 0 |
| Radhe Govind Plaza Shree Radha Construction | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| RAM SMRUTI CHS LTD SAI PRAKASH BUILDERS AND DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Shubhanand NX And Greenland NX Marathe Enterprises | Active | 30 Apr 2027 | 31 Dec 2024 | 0 |
| ROYAL CASTLE PHASE 2 SHREENATH DEVELOPERS | Active | 31 May 2027 | 30 Dec 2023 | 0 |
| RAJ REGALIA PHASE-2 AMRUT LAXMI DEVELOPERS | Active | 30 Jun 2027 | 30 Jun 2025 | 0 |
| PRECIOUS EMPIRE WING D, E AND F RKR REALITY | Active | 15 Jul 2027 | 15 Mar 2027 | 0 |
| 24 High BIZBAY Apex Infra | Active | 31 Jul 2027 | 31 Jul 2026 | 0 |
| AAI NIWAS AAI MAULI ENTERPRISES | Active | 31 Jul 2027 | 31 Mar 2027 | 0 |
| Konark NYP DEVELOPERS | Active | 31 Jul 2027 | 31 Dec 2025 | 0 |
| Neelkrishna amalgamated project of Neelam CHS Ltd and Krishna Milan CHS Ltd OM SAI INFRA | Active | 31 Jul 2027 | 31 Mar 2027 | 0 |
| PANDHARINATH CHS YADAV BROS ENTERPRISES | Active | 31 Jul 2027 | 31 Mar 2027 | 0 |
| REDEVLOPMENT OF PANVELKAR EMPIRE WING A WING A-1 WING B Om Sai Shraddha Developers | Active | 31 Jul 2027 | 30 Mar 2024 | 0 |
| SHAILAJA GPS BUSINESS CENTER KPG BUILDERS AND DEVELOPERS | Active | 31 Jul 2027 | 31 Mar 2027 | 0 |
| TRINITY MOKSH RATTANRAJ LIFESPACES | Active | 31 Jul 2027 | 31 Mar 2025 | 0 |
| VERMA HERITAGE GRRS NIRMAN PRIVATE LIMITED | Active | 31 Jul 2027 | 31 Mar 2027 | 0 |
| Innovative Bliss Innovative Homes | Active | 30 Aug 2027 | 30 Apr 2027 | 0 |
250 more projects
- JAI BHAVANI CHS · 30 Aug 2027
- PATELS ASTRUM · 30 Aug 2027
- DATTA KUTIR · 1 Sep 2027
- PATELS INFINIA · 1 Sep 2027
- CHADHA RESIDENCY · 7 Sep 2027
- Ambernath Vadavali Shrinivas Co.Operative Housing Society Ltd. · 30 Sep 2027
- PARAS APARTMENT CO-OP. HOUSING SOCIETY LTD · 2 Oct 2027
- SHIV PARADISE · 2 Oct 2027
- SHREEYUG RESIDENCY · 30 Oct 2027
- YUG PARADISE · 31 Oct 2027
- Janaki Sadan · 15 Dec 2027
- RAIGAD CO-OP. HSG. SOC. LTD · 20 Dec 2027
- GOLDEN HEIGHTS · 31 Dec 2027
- INNOVATIVE SOLITAIRE · 31 Dec 2027
- LATA CO OPERATIVE HOUSING SOCIETY LIMITED · 31 Dec 2027
- PARVATI PARK CO OP HSG SOC LTD · 31 Dec 2027
- Shree Gurukrupa · 30 Jan 2028
- Bellevue · 1 Feb 2028
- MAYURESH KRUPA CHS LTD · 29 Feb 2028
- NAKODA COOPERATIVE HOUSING SOCIETY LTD · 29 Feb 2028
- OM SHIVANJALI CHS LTD · 29 Feb 2028
- Shree Ganesh Leela Co-operative Housing Society Limited · 29 Feb 2028
- Shubh Iconic · 31 Mar 2028
- Anita CHS Ltd · 30 Apr 2028
- CHAAYA SPARSH · 30 Apr 2028
- Chandralok B CHS · 30 Apr 2028
- CHAUHAN MANZIL · 30 Apr 2028
- Dalal Kalash · 30 Apr 2028
- GOLDEN VALLEY CHS LTD · 30 Apr 2028
- HIRAL PARADISE CHS · 30 Apr 2028
- ISHWAR GAJANAN · 30 Apr 2028
- ISHWAR HARIDARSHAN · 30 Apr 2028
- Jhalak Hillock · 30 Apr 2028
- Kamini A Wing Co-operative Housing Society Ltd · 30 Apr 2028
- KHATRI SPARSH · 30 Apr 2028
- Manav Sangeet CHS · 30 Apr 2028
- MOHAN PRECIOUS GREENS PHASE II · 30 Apr 2028
- MOHAN SUBURBIA IV NX · 30 Apr 2028
- NEXT CROWN LANDMARK · 30 Apr 2028
- PATELS ZENITH · 30 Apr 2028
- ROSE VILLA · 30 Apr 2028
- Saburi CHS · 30 Apr 2028
- SHIVTIRTH · 30 Apr 2028
- SKY HERITAGE · 30 Apr 2028
- V A BUSINESS CENTRE · 30 Apr 2028
- VENU ZIPA TOWER · 30 Apr 2028
- Vishnu Krupa · 30 Apr 2028
- Yavhi Sterling · 15 May 2028
- Parshuram Tulip · 28 Jun 2028
- RELIANCE GOLD · 28 Jun 2028
- PRECIOUS ICON PHASE II · 30 Jul 2028
- CITY CENTRE · 31 Jul 2028
- DERTON CROWN · 31 Jul 2028
- Laxmi Narayan Co-op Housing Society Ltd · 31 Jul 2028
- Mansarovar Shiv Darshan · 31 Jul 2028
- MEENAKSHI PLAZA CO-OPERATIVE HOUSING SOCIETY LTD · 31 Jul 2028
- PATELS AVENUE · 31 Jul 2028
- MERRY MANSION · 18 Sep 2028
- Arihant Digvijay · 30 Sep 2028
- MAYURDEEP CO-OPERATIVE HOUSING SOCIETY LTD · 15 Oct 2028
- Sarovar · 20 Oct 2028
- PATELS VENUS · 30 Oct 2028
- SHREEJI OASIS · 30 Oct 2028
- VISHWAJEET PRIME · 30 Oct 2028
- PATELS PRIME · 1 Dec 2028
- Hill Park Co-Operative Housing Society Limited · 31 Dec 2028
- ISHWAR JAY JAY SHANKARA CO-OP. HOUSING SOCIETY LTD. · 31 Dec 2028
- SUMANT CHS LTD · 28 Feb 2029
- PATELS ELARA · 1 Mar 2029
- MORIVALI AMBERNATH WEMBLEY PARK CHS LTD · 30 Mar 2029
- PATELS AIRICA · 30 Mar 2029
- SKY VIEW · 30 Mar 2029
- Lakshmi Heights · 15 Apr 2029
- GIRIJA CHS · 30 Apr 2029
- MEERA VISTARA · 30 Apr 2029
- MOHAN PRECIOUS GREENS PHASE III · 30 Apr 2029
- PAVILLION EAST VIEW · 30 Apr 2029
- RUDRARAJ COMPLEX · 30 Apr 2029
- SANKALP SIDDHI · 30 Apr 2029
- SHIVAM RESIDENCY · 30 Apr 2029
- Shivkrupa Apartment Wing B and Wing C · 30 Apr 2029
- Skyvera · 30 Apr 2029
- Soman Shrishti B · 30 Apr 2029
- SPM DREAM CITY PHASE 1 · 30 Apr 2029
- YAVHI MANOR · 5 May 2029
- DAVE TOWERS · 30 Aug 2029
- GAJANAN PLAZA · 30 Aug 2029
- Pariwas Co Op Housing Society · 30 Oct 2029
- ADIYOGI AURA · 31 Dec 2029
- Soman Shrishti A · 31 Dec 2029
- VASTU HOMES · 31 Dec 2029
- SWAMI SAMARTH APARTMENT CO.OP.HSG.SOC.LTD & AMBRESHWAR HERITAGE · 15 Mar 2030
- Krishna Bhoomi · 30 Mar 2030
- Dipti Business Center · 30 Apr 2030
- Iskcon Residency Phase-II Type B · 30 Apr 2030
- Leena Pride · 30 Apr 2030
- OM SAI PALMS · 30 Apr 2030
- ShivHari CHS · 30 Apr 2030
- Soman Shrishti Villa · 30 Apr 2030
- VISHWAJEET MYSPACE · 31 Jul 2030
- VISHWAJEET VANTAGE · 31 Jul 2030
- NEW NEELGAGAN CHS · 30 Oct 2030
- Rosewood Residency 1 · 30 Oct 2030
- Rosewood Residency Building No. 2 · 30 Mar 2031
- Amber City Centre · 30 Apr 2031
- Innovative Prestige · 30 Apr 2031
- ISHWAR KANCHANGANGA · 30 Apr 2031
- Iskcon Residency Phase-II Type A · 30 Apr 2031
- Mahadev Heights · 30 Apr 2031
- UMA CHS LTD · 30 Apr 2031
- Panvelkar Daffodils-Plot No. 11,12,13 · 31 Dec 2031
- JHALAK FOURWINGS · 30 Apr 2032
- Panvelkar Homes - Phase II · completed
- VICTORIA HOUSE PHASE I · completed
- PANVELKAR DAFFODIL · completed
- METRO HIGHLAND PHASE I · completed
- GAJANAN SMRUTI · completed
- VASANT VIHAR · completed
- WOODLAND · completed
- ISHWAR PARADISE · completed
- NANA PATIL PRIDE · completed
- Panvelkar Crown · completed
- Shankar Heights Galaxy Wing · completed
- OM SAI REGENCY · completed
- ASHTAVINAYAK NX · completed
- Purva Apartment · completed
- SAHAJEEVAN · completed
- SAI CRYSTAL-B WING · completed
- SHIV SAGAR APARTMENT · completed
- shree siddhivinayak residency · completed
- Mohan Suburbia IV · completed
- NANA PATIL RESIDENCY · completed
- RAMA PRIDE · completed
- Lok Nagari Developer Ph - II · completed
- ISHWAR PARADISE NX · completed
- MEERA PARK ROYALE PHASE II · completed
- Mohan Nano Estates I · completed
- Mohan Nano estates II · completed
- Mohan Nano Estates III · completed
- Mohan Nano Estates IIIB · completed
- NISARG GREENS- Phase II A · completed
- SHANTI GARDEN · completed
- MEERA PARK ROYALE · completed
- MEERA AVALON · completed
- LANDSCAPE HERITAGE BUILDING NO 1 · completed
- MAHAVIR PARADISE PHASE IV WING A · completed
- MASTER BUILDCON · completed
- TRINITY - RUDRA · completed
- CHINTAMANI COOPERATIVE HOUSING SOCIETY LTD · completed
- ISHWAR PRIDE · completed
- JP REGENCY PHASE 1 · completed
- M/S OM SHAKTI SWASTIK Co-Op Hsg Soc Ltd · completed
- MIDTOWN SQUARE - PHASE I · completed
- RAJ NIRVANA · completed
- Vedant Apartments · completed
- JAINAM RESIDENCY · completed
- ISHWAR SHUBHLAXMI · completed
- NANA PATIL ROYAL · completed
- Sai Heights · completed
- Tulsi Sharnam · completed
- AASHRAY AANAND PHASE-II · completed
- RUTIKA APARTMENT · completed
- Lok Nagari Developer Ph - III · completed
- K K RENUKA RESIDENCY A AND B WING · completed
- PRAKRUTI SPARSH · completed
- RAHUL EXCELLENCE · completed
- RAJ REGALIA - PHASE I · completed
- SWANAND BLISS · completed
- VILLAS DELPHIN PHASE II - TYPE I · completed
- ISHWAR MAMTA · completed
- Navare Residency and Library · completed
- JP REGENCY PHASE 2 · completed
- PATELS SIGNATURE TYPE B · completed
- TRIMURTY HEIGHTS · completed
- VASTU SIDDHI , PHASE II · completed
- VILLAS DELPHIN PHASE I - TYPE II · completed
- KINGS COURT · completed
- SHREE GALAXY HEIGHTS · completed
- Mohan Suburbia III · completed
- BHOOMI AVENUE · completed
- S. A. Patil Nagar Garden View CHS · completed
- SHREE HIMGIRI CHS · completed
- MEERA PARK · completed
- Yavhi Altamount · completed
- Crystal Plaza · completed
- Krishna Residency · completed
- PRECIOUS GALAXY · completed
- CONCEPT ARENA · completed
- ASHIRWAD RESIDENCY CHS LTD · completed
- Neeraj Co. op Housing Society LTD. · completed
- Panvelkar Homes - Phase II · completed
- PATELS RESIDENCY - E WING · completed
- SHIV SAI RESIDENCY · completed
- Bhardwaj Co-op Hsg. Soc. Ltd. · completed
- JP HARMONY · completed
- Kailash Darshan CHS LTD · completed
- LAKSHMI ELEGANCE · completed
- Lucas Residency · completed
- MADHUBAN PARK · completed
- MUKTAI MAULI CHS · completed
- Parshuram Shreephal · completed
- RAJ INAAYA · completed
- SHIV SONAL PALACE CHS LTD · completed
- PARASMANI PARK CHS · completed
- GOPAL SMRUTI · completed
- PATEL HILLS · completed
- SHEETAL RESIDENCY · completed
- OM SAI HEIGHTS · completed
- ADWAIT GAURAV · completed
- Precious Galaxy Wing B · completed
- Ekveera Heights · completed
- SHREERAM APARTMENT · completed
- RAJ REGALIA PHASE-1A · completed
- AMRESHWAR CO-OPERATIVE HOUSING SOCIETY LIMITED · completed
- CHARMS GLOBAL CITY - TYPE- B1-MERLION · completed
- GULMOHAR CHS LTD · completed
- KRISHNALAYA · completed
- PATELS EMERALD · completed
- SHIV SAI KRUPA CHS LTD · completed
- SHREE SAI ARNAV · completed
- SUSIDDHI CHS LTD · completed
- JAIN PLAZA · completed
- PATELS SAPPHIRE · completed
- CORAL ELANZA · completed
- NISARG GREENS - Phase - 2 B · completed
- NISARG GREENS - Phase - 2 C · completed
- WATSON APARTMENT · completed
- Morivali Prarambh · completed
- VISHWAJEET PINK CITY NX · completed
- SPECTRUM · completed
- ANTALICA TOWERS · completed
- ISHWAR YOG SURABHI · completed
- J K KASTURI · completed
- KAILASH PARVAT C H S LTD · completed
- KALPATARU CO.-OP. HOUSING SOCIETY LTD · completed
- GURUDEV DATTA CHS · completed
- ISHWAR KALYAN DHAM · completed
- JP SYMPHONY BLDG NO 5 · completed
- OM DATTATRAY CHS LTD · completed
- SATYAM OLEANDER · completed
- Shree Moreshwar CHS Ltd · completed
- VASTUKARMA CO-OP. HSG. SOC · completed
- VED PARADISE · completed
- Datta Dham Apartment CHS · completed
- SUYOG APARTMENT · completed
- Kanchan Ganga · completed
- NILYOG APARTMENT · completed
- SONAL RESIDENCY · completed
- VISHWAJEET PINK CITY · completed
- ISHWAR BLISS · completed
Other areas in Thane
- Kulgaon · 735
- Kalyan · 510
- Tilaknagar · 354
- Bhiwandi · 348
- Mira Road East · 277
- Kalyan East · 250
- Manpada · 232
- Naupada · 223
- Vishnunagar · 198
- Mumbra · 188
- Sandozbaugh · 180
- Thane · 161
Data compiled by GharKundli (gharkundli.com) from MahaRERA public records. Projects are grouped by the pincode filed on MahaRERA.