MahaRERA projects in Kulgaon, Thane (421503)

According to GharKundli's check of MahaRERA records, 735 housing projects are registered in pincode 421503 (Kulgaon, Thane). 304 are still being built, 132 with possession due by the end of 2027. For 405, the completion date on MahaRERA is later than the one first promised. 61 have at least one complaint filed on MahaRERA.

Pincode 421503 also covers: Badlapur, Badlapur East, Shirgaon, Badlapur West, Katrap, Ambernath.

“Possession due” is the latest completion date the builder has filed on MahaRERA; “first promised” is the date given at registration. Open a project for its full MahaRERA record.

ProjectMahaRERA statusPossession due (MahaRERA)First promisedComplaints
SWAMI SWARUP
SWAMINI INFRA PRIVATE LIMITED
Abeyance31 May 2026passedsame0
MAA BHAWANI EMPIRE
MAA BHAWANI CONSTRUCTION
De-registered30 Sep 2026passedsame0
AUDUMBER FLOWER VALLEY
AUDUMBER SUPERSTRUCTURES
Active30 Oct 2026passed30 Jun 20250
Olive - Phase III - Pranjee Garden City
Pranjee Properties Pvt. Ltd
Active30 Oct 2026passed30 Jun 20240
SADGURU HARMONY PHASE - 3 WING C
SADGURU ASSOCIATE
Active30 Oct 2026passed30 Jun 20250
SADGURU HARMONY PHASE 4 WING D
SADGURU ASSOCIATE
Active30 Oct 2026passed30 Jun 20250
SWAPNA REKHA CHS
SHREE SADGURU HOMES
Active30 Oct 2026passed31 Dec 20250
VENKATESHWARA HEIGHTS
SHREE VENKATESHWARA DEVELOPERS
Active30 Oct 2026passed31 Dec 20250
VISHNU VATIKA NX PHASE II D & H WING
M/S. VISHNU GROUP
Active31 Oct 2026passed30 Oct 20250
EKDANT POOJA CHSL
LANDMARK INFRA
Active30 Nov 202631 Jul 20260
SAI DARSHAN
SAI KRUPA BUILDERS
Active30 Nov 202631 Dec 20250
SATYAM SHEELA WING F
SHREEJI DEVELOPERS
Active30 Nov 202631 Jul 20260
USHA KIRAN RESIDENCY F1 F2
STALWART IMPEX PVT LTD
Active30 Nov 202631 Dec 20180
BHAWANI SHANKAR RESIDENCY
BHAWANI SHANKAR RESIDENCY
Active30 Dec 2026same0
DASHMESH PEARL
EMPIRE REALTY
Active30 Dec 2026same0
DREAMS ENCLAVE
DREAMLAND DEVELOPERS
Active31 Dec 2026same0
KRISHNA DHAM - 2
ATREE REALTORS
Active31 Dec 2026same0
MANGALJYOT CO OP HSG SOC LTD
SHRIDHAR DATTATRAY PATIL
Active31 Dec 2026same0
OM ASHISH CHS
GREEN HEIGHTS INFRA
Active31 Dec 202631 Dec 20250
Panvelkar Greens - Phase I
ESHAN DEVELOPERS
Active31 Dec 202631 Dec 20250
Panvelkar Nisarg Phase II Building A2
Panvelkar Realty Pvt Ltd
Active31 Dec 2026same0
PARK ONE, PHASE I
SHREE LAXMI ENTERPRISES
Active31 Dec 202631 Aug 20260
PRATHMESH VRINDAVAN F WING
S. P. GROUP
Active31 Dec 2026same0
RIDDHI SIDDHI CHS
VADNERE BUILDER & DEVELOPERS
Active31 Dec 2026same0
SAI CHHAYA CO.OP. HOUSING SOCIETY
Prakash Jagannath Mane
Active31 Dec 2026same0
SATYAM ANANTAM
SHIVANSH INFRA
Active31 Dec 202631 Dec 20250
SHIVSHAKTI OASIS
SHIVSHAKTI GENESIS
Active31 Dec 2026same0
UMA SHANKAR
RAJAI DEVELOPERS
Active31 Dec 202630 Mar 20220
Vaishnavi Heights
VAISHNAVI BUILDERS & DEVELOPERS
Active31 Dec 202624 Jun 20240
Vishnu Vatika Wing C Phase II
VISHNU VATIKA
Active31 Dec 202630 May 20230
Vrundavan Heights
Maulikrupa Developers
Active31 Dec 202631 Jan 20260
AMBER DARSHAN CO OP HSG SOCIETY
VARAD INFRA
Active30 Jan 202730 Sep 20260
KENDALE EMERALDS
Kendale Developers
Active30 Jan 202730 Oct 20251
SHREE AYYAPPA CO-OPERATIVE HOUSING SOCIETY LIMITED
G. K. BUILDERS
Active30 Jan 202730 Sep 20260
Tulsi Vrundavan
Tulsi Builders and Developers
Active30 Jan 202730 Sep 20260
AARYA PREM CO-OP HSG SOC
K S BUILDERS & DEVELOPERS
Active28 Feb 202730 Oct 20260
JAY RAMDARSHAN CHS LTD
MITRA BUILDCON
Active8 Mar 20278 Nov 20260
Sai Vedant
Sai Aangan Residency
Active31 Mar 202731 Mar 20260
Vastu Rachana
GAGANGIRI INFRA
Active20 Apr 202720 Dec 20260
PRABHU DARSHAN CO-OPERATIVE HOUSING SOCIETY LIMITED
NYP DEVELOPERS
Active21 Apr 202721 Dec 20260
Dipti K Co. Op. Hsg. Soc. Ltd.
INSPIRE REALITY
Active26 Apr 202726 Dec 20260
AKANKSHA CO. OP. HSG. SOC. LTD.
KRISHNA BUILDCON
Active30 Apr 202731 Dec 20260
AUDUMBER CROWN
AUDUMBER BUILDERS & DEVELOPERS
Active30 Apr 202731 Dec 20260
AVANI CHS LTD
SURAJ ENTERPRISES
Active30 Apr 202731 Dec 20260
BALKRUSHNA CO-OP HOUSING SOCIETY LTD
SAI HOMES
Active30 Apr 202731 Dec 20260
Deep Dhara
M/s. Deepali Infracon LLP
Active30 Apr 202731 Dec 20250
Harshana Co-Op Housing Society Ltd
SHREE MANGALAM BUILDERS AND DEVELOPERS
Active30 Apr 202730 Dec 20260
JAI GANESH CO-OPERATIVE HOUSING SOCIETY LTD
DEEPALI LANDSCAPE
Active30 Apr 202731 Dec 20260
KARTIK HOMES
KARTIK ENTERPRISES
Active30 Apr 202731 Dec 20240
KENDALE EMERALDS PHASE III
KENDALE DEVELOPERS
Active30 Apr 202731 Dec 20260

250 more projects

  1. KRISHNAPINGAKSHA · 30 Apr 2027
  2. LAXMI RESIDENCY · 30 Apr 2027
  3. NEW VANRAI PARAG CHS · 30 Apr 2027
  4. OM CHAITANYA CO-OPERATIVE HOUSING SOCIETY LIMITED · 30 Apr 2027
  5. Om Dutta Deep Co. Op HSG · 30 Apr 2027
  6. OM SUMUKH DARSHAN CHSL · 30 Apr 2027
  7. P G GARDEN · 30 Apr 2027
  8. PATIL HIGHLANDS PHASE I WING C · 30 Apr 2027
  9. PEARL HEIGHTS · 30 Apr 2027
  10. PLATINUM WILLOWS · 30 Apr 2027
  11. RUGI COLONIA · 30 Apr 2027
  12. Sadguru Symphony - Wing - A, D, E, F and G of Phase-II · 30 Apr 2027
  13. Sagar Greens · 30 Apr 2027
  14. Sai Flora · 30 Apr 2027
  15. Sara Heights · 30 Apr 2027
  16. Shiv Paradise Wing C · 30 Apr 2027
  17. SHIV SHRUSHTI APARTMENT · 30 Apr 2027
  18. SHREE APARTMENT · 30 Apr 2027
  19. Shree Ganraj Residency · 30 Apr 2027
  20. SHREE KRISHNA KUNJ CO-OP HSG SOC LTD · 30 Apr 2027
  21. Shree Sadguru Krupa · 30 Apr 2027
  22. SHREE VATIKA · 30 Apr 2027
  23. Shreeji Landmark NX · 30 Apr 2027
  24. SHREEJI LANDMARK PHASE II · 30 Apr 2027
  25. SHREEJI NX · 30 Apr 2027
  26. Siddhivinayak Prasad CO-OP.Housing Soc.Ltd · 30 Apr 2027
  27. SINDHURAJ CO . OPP. HSG. SOC. LTD · 30 Apr 2027
  28. SKY GALAXY BLDG NO 1 · 30 Apr 2027
  29. SONAL PARADISE · 30 Apr 2027
  30. Sunita Palace · 30 Apr 2027
  31. SWAYAMBHU CO.OP.HSG.SOC.LTD · 30 Apr 2027
  32. Thakker Shraddha Kunj · 30 Apr 2027
  33. Thanekar Palacio Phase II · 30 Apr 2027
  34. THARWANI MILLENNIUM CITY PHASE III · 30 Apr 2027
  35. The Address Wing C Phase III · 30 Apr 2027
  36. Trident Avalon · 30 Apr 2027
  37. USHA KIRAN RESIDENCY WING E1 E2 E3 · 30 Apr 2027
  38. VASUNDHARA · 30 Apr 2027
  39. VATSALA RESIDENCY · 30 Apr 2027
  40. VED HEIGHTS · 30 Apr 2027
  41. VIRAJ ICONIC · 30 Apr 2027
  42. VITTHAI ANANT PLAZA · 30 Apr 2027
  43. SHANITA APARTMENT · 31 May 2027
  44. JAMES RESIDENCY PHASE 3 · 30 Jun 2027
  45. AMBAR VAASTU PHASE-II, C-WING · 31 Jul 2027
  46. AUDUMBER CHSL · 31 Jul 2027
  47. CHAKRAPANI CO OP HSG SOCIETY LTD · 31 Jul 2027
  48. Gouri Aangan CHS · 31 Jul 2027
  49. GURU PADMA KUTIR CO OPERATIVE HOUSING SOCIETY · 31 Jul 2027
  50. NEELKANTH HEIGHTS CHS · 31 Jul 2027
  51. NEW BLUE HEAVEN CHSL · 31 Jul 2027
  52. OM GURU KRUPA CO-OP. HOUSING SOCIETY LTD · 31 Jul 2027
  53. OM SHIV ANGAN CHS · 31 Jul 2027
  54. PARIVAR SADAN CHS LTD · 31 Jul 2027
  55. SHIV TIRTH B WING · 31 Jul 2027
  56. SHREE HILL RESIDENCY · 31 Jul 2027
  57. SHREE MANGALMURTI CO. OP. HSG. SOC. LTD. · 31 Jul 2027
  58. SWAMI HILLS · 31 Jul 2027
  59. CRYSTAL HEIGHTS · 30 Aug 2027
  60. SHREE GAYATRIDEEP · 30 Aug 2027
  61. Alankapuri · 1 Sep 2027
  62. Om Chandraprakash Co. Op. Housing Society Ltd. · 30 Sep 2027
  63. OM RUKMINI PRASAD CO OP HSG SOC · 30 Sep 2027
  64. S P ARCADE · 30 Sep 2027
  65. Thanekar DNSB Tower · 30 Sep 2027
  66. GULMOHAR HEIGHTS · 30 Oct 2027
  67. OM APARTMENT · 30 Oct 2027
  68. OMKAR PLAZA D AND E WING · 30 Oct 2027
  69. Sai Omkar Square · 30 Oct 2027
  70. SHEETAL ARCADE B WING · 30 Oct 2027
  71. SHIVKALP · 30 Oct 2027
  72. TRIVENI SADAN · 30 Oct 2027
  73. VANYA ARCADE · 30 Oct 2027
  74. SAI AMRUT · 31 Oct 2027
  75. YASHODA VRUNDAVAN COMPLEX - C WING · 30 Nov 2027
  76. Jalaram Jyot Co-op Housing Society Ltd. · 1 Dec 2027
  77. Shashwat Aangan Building / Wing B · 30 Dec 2027
  78. KRISHNA NAYAN COMPLEX PHASE I · 31 Dec 2027
  79. nakshatra · 31 Dec 2027
  80. SAMRUDDHI HEIGHTS · 31 Dec 2027
  81. VARUN HILLCREST · 31 Dec 2027
  82. vedantnakshatra L phase 3 · 31 Dec 2027
  83. SHIVSHAKTI PRIME · 30 Jan 2028
  84. The Landmark · 15 Feb 2028
  85. SHREE SAHAWAS CHSL · 29 Feb 2028
  86. SHREY SWAPNA · 29 Feb 2028
  87. PATELS HORIZON · 18 Mar 2028
  88. VISHWA SKY HIGH · 24 Mar 2028
  89. DALAL SQUARE · 30 Mar 2028
  90. MILESTONE · 30 Mar 2028
  91. Durvankur Co-op Hsg Soc Ltd · 31 Mar 2028
  92. Jai Prathamesh Co-operative Housing Society Ltd · 29 Apr 2028
  93. Aaryadarshan Co Op Hsg Soc Ltd · 30 Apr 2028
  94. ARNAV WING D · 30 Apr 2028
  95. ATMIYA RESIDENCY · 30 Apr 2028
  96. BHAWANI SHANKAR HEIGHTS WING-C · 30 Apr 2028
  97. DATTATRAY RESIDENCY · 30 Apr 2028
  98. GANESH VILLA CHSL · 30 Apr 2028
  99. GREEN TOUCH · 30 Apr 2028
  100. Gurudev 1 · 30 Apr 2028
  101. HARI SHRUSHTI · 30 Apr 2028
  102. Heramb Aarambha - Phase 2 · 30 Apr 2028
  103. JAGDAMBA CO OP HOUSING SOCIETY LTD · 30 Apr 2028
  104. Jeevan Lifestyles Phase 6 · 30 Apr 2028
  105. LAXMI · 30 Apr 2028
  106. MAA BHAVANI KRUPA · 30 Apr 2028
  107. Matrukrupa Co-operative Housing Society Ltd · 30 Apr 2028
  108. MERY VILLA CHSL · 30 Apr 2028
  109. Mohan Willows III · 30 Apr 2028
  110. NANO CITY · 30 Apr 2028
  111. NEEL SAGAR CHS · 30 Apr 2028
  112. PANVELKAR BHOOMI BUILDING NO 5,6,7,8,9 · 30 Apr 2028
  113. Park One Phase II · 30 Apr 2028
  114. PG VRUNDAVAN · 30 Apr 2028
  115. PRADHAN MANTRI AWAS YOJANA - URBAN · 30 Apr 2028
  116. PREM RATNA PLAZA · 30 Apr 2028
  117. RANIMAA DEVI CHS · 30 Apr 2028
  118. Sai Baliram · 30 Apr 2028
  119. Shivansh Enclave · 30 Apr 2028
  120. SHREE VIRAJ RESIDENCY, WING-D, PHASE-3 · 30 Apr 2028
  121. SHREEJI LANDMARK PHASE I · 30 Apr 2028
  122. Shri Gajanan Krupa CHS · 30 Apr 2028
  123. SKY GALAXY BLDG NO 2 · 30 Apr 2028
  124. UMIYA NAKSHATRA HEIGHTS · 30 Apr 2028
  125. Vishnu Altezza · 30 Apr 2028
  126. VRINDAVAN NIDHI · 30 Apr 2028
  127. VRINDAVAN RESIDENCY · 30 Apr 2028
  128. Amrut Manjil · 31 May 2028
  129. GRAND UNITY RESIDENCES · 31 May 2028
  130. Babaji CHS · 20 Jul 2028
  131. Mauli Park · 31 Jul 2028
  132. PINE VIEW · 31 Jul 2028
  133. Roshan Co-op Housing Society · 31 Jul 2028
  134. Shree Pooja · 31 Jul 2028
  135. Shrihari Chandan Apartment · 31 Jul 2028
  136. THE CHALETS AVENUE · 31 Jul 2028
  137. Om Sai Krupa Co operative Housing Society Ltd · 29 Aug 2028
  138. SAURABH CHSL · 30 Sep 2028
  139. SHREEPAL HOUSE COMPLEX CHSL · 30 Sep 2028
  140. DEEPSAMAY CHS · 30 Oct 2028
  141. GURUDEV PALACE · 30 Oct 2028
  142. LAXMI SHANKAR COMPLEX · 30 Oct 2028
  143. SHREE ASTHAVINAYAK COMPLEX BUILDING NO.1 · 30 Oct 2028
  144. PADMANABH HEIGHTS · 30 Nov 2028
  145. RAM EMPIRE · 30 Nov 2028
  146. SPM Lake City Phase II Part 1 · 30 Nov 2028
  147. OM AMBIKA DARSHAN CHS LTD · 31 Dec 2028
  148. PRECIOUS SOLITAIRE · 31 Dec 2028
  149. SAURABH SANKUL · 31 Dec 2028
  150. SHREEJI ICONIC · 31 Dec 2028
  151. Trident Woods · 31 Dec 2028
  152. VARUN ENCLAVE · 31 Dec 2028
  153. VARUN VISTA · 31 Dec 2028
  154. Swaraswati Heights · 30 Jan 2029
  155. Adiyogi Blossom · 31 Mar 2029
  156. Shri Jiveshwar Apartment · 6 Apr 2029
  157. ADITI HIGHLAND · 30 Apr 2029
  158. Aishwarya Sadan Co-Op Housing Society Ltd. · 30 Apr 2029
  159. Arihant Anmol Phase V · 30 Apr 2029
  160. ATMIYA CROWN · 30 Apr 2029
  161. BENCHMARK GREENS · 30 Apr 2029
  162. BLOSSOM HEIGHT · 30 Apr 2029
  163. BRAMHANDNAYAK · 30 Apr 2029
  164. DATAR HEIGHT D AND E WING · 30 Apr 2029
  165. DOHA HEIGHTS · 30 Apr 2029
  166. LA ARIHANT HERITAGE · 30 Apr 2029
  167. MAHALAXMI · 30 Apr 2029
  168. METRO AANGAN PHASE - I · 30 Apr 2029
  169. Nilkanth Signia · 30 Apr 2029
  170. Panvelkar Evoke Co-op Housing Society Ltd · 30 Apr 2029
  171. Parivartan Tower · 30 Apr 2029
  172. Patil Highlands Phase II Wing B · 30 Apr 2029
  173. PG SWARA · 30 Apr 2029
  174. POKHRIYAL PARAMOUNT · 30 Apr 2029
  175. SAI CASTLE · 30 Apr 2029
  176. SAI GIRNAR CHS LTD · 30 Apr 2029
  177. SAI MATOSHREE · 30 Apr 2029
  178. Sanveg Residency · 30 Apr 2029
  179. SHIV ELYSIUM · 30 Apr 2029
  180. Shivam Heritage Wing B · 30 Apr 2029
  181. Shree Galaxy Heights Wing A · 30 Apr 2029
  182. Shree Shivsai Co. Op. Hsg. Soc. · 30 Apr 2029
  183. SHREE SIDDHIVINAYAK PARK B TYPE BUILDING · 30 Apr 2029
  184. Shubh Shrushti LM · 30 Apr 2029
  185. THANEKAR BKC PARAMOUNT · 30 Apr 2029
  186. TRIDENT VRINDAVAN · 30 Apr 2029
  187. Tulsi Aananta · 30 Apr 2029
  188. VASTUDEEP CHS · 1 Jun 2029
  189. Prime Heights · 28 Jun 2029
  190. CHANDRAMA S CHSL · 31 Jul 2029
  191. NEW AAKASH CO. OP. HSG. SOC. LTD. · 31 Jul 2029
  192. OM ANANT PALACE · 31 Jul 2029
  193. OM SAGAR PARK · 31 Jul 2029
  194. Sharmila Sadan · 31 Jul 2029
  195. SURVAL CROWN · 31 Jul 2029
  196. THANEKAR BKC VISTA · 30 Sep 2029
  197. AARYAKRUSHNA · 30 Oct 2029
  198. Mohan Alcoves I · 30 Oct 2029
  199. SHREEJI MILESTONE · 30 Oct 2029
  200. SHREEJI Z PLUS · 30 Oct 2029
  201. SWANAND VEDIKA · 30 Oct 2029
  202. MORYA ENCLAVE · 22 Nov 2029
  203. AMBER SOLITAIRE WING B · 30 Nov 2029
  204. Ananta Pride Phase II · 30 Nov 2029
  205. Gokul Heights · 31 Dec 2029
  206. MAHAVIR HERITAGE · 31 Dec 2029
  207. RAJ CORNERSTONE · 31 Dec 2029
  208. SAIPARK SAHJEEVAN · 31 Dec 2029
  209. SAI HILLCREST WING A & B · 30 Jan 2030
  210. Shilpa Adarsh Co Op Housing Society Limited · 30 Jan 2030
  211. Akash Deep CHS LTD · 31 Mar 2030
  212. CITY PRIDE NX · 31 Mar 2030
  213. ADIYOGI MAJESTY · 30 Apr 2030
  214. BHAWANI SHANKAR HEIGHTS B WING · 30 Apr 2030
  215. DASHMESH HEIGHTS · 30 Apr 2030
  216. Hitech Park · 30 Apr 2030
  217. JYOTI JAGANNATH HERITAGE · 30 Apr 2030
  218. LAXMIVIHAR CO-OPERATIVE HOUSING SOCIETY LIMITED · 30 Apr 2030
  219. PINNACLE VATIKA · 30 Apr 2030
  220. PRAMUKH PARADISE · 30 Apr 2030
  221. R1 AND R2 PANVELKAR PALASH CHS · 30 Apr 2030
  222. REYAANSH ARCADE · 30 Apr 2030
  223. SAI UNIVERSE · 30 Apr 2030
  224. SAMRUDDHI NX · 30 Apr 2030
  225. SHIV-KUTIR · 30 Apr 2030
  226. SPM Midtown · 30 Apr 2030
  227. SUDARSHAN VIHAR · 30 Apr 2030
  228. SWANAND NIWAS CO OP HOUSING SOCIETY LTD · 30 Apr 2030
  229. TULSI VAN · 30 Apr 2030
  230. Tulsi Viraj · 30 Apr 2030
  231. Vastu Imperia · 30 Apr 2030
  232. VIGHNAHARTA CO. OP. HOUSING SOCIETY LTD · 30 Apr 2030
  233. Vishnu Krupa Co operative Housing Society · 30 Apr 2030
  234. AMBER SOLITAIRE WING A · 31 May 2030
  235. MOTIRAM NAKSHATRA · 30 Jun 2030
  236. Vishwa Paradise · 31 Jul 2030
  237. AVIGHNA HEIGHTS · 31 Dec 2030
  238. Greens NX · 31 Dec 2030
  239. HARI SHRUSHTI WING A PHASE II · 31 Dec 2030
  240. INFINITY MEADOWS · 31 Dec 2030
  241. KHATRI RENOVA · 31 Dec 2030
  242. Adiyogi Blossom Phase - II · 30 Apr 2031
  243. GURUKRUPA BUILDERS AND DEVELOPERS · 30 Apr 2031
  244. PG VATIKA WING E AND F · 30 Apr 2031
  245. Shivam Nirvaana · 30 Apr 2031
  246. SHREE PRASANNA CHSL · 30 Apr 2031
  247. Tulsi Vandan · 30 Apr 2031
  248. VRINDAVAN CITY PHASE -1 · 30 Apr 2031
  249. Yashoda Vrundavan Complex Phase 2 · 30 Apr 2031
  250. Yatigandh · 31 Jul 2031

Other areas in Thane

All areas in Thane →

Data compiled by GharKundli (gharkundli.com) from MahaRERA public records. Projects are grouped by the pincode filed on MahaRERA.

MahaRERA projects in Kulgaon, Thane (421503): possession dates & complaints | GharKundli