MahaRERA projects in Tilaknagar, Thane (421201)
According to GharKundli's check of MahaRERA records, 354 housing projects are registered in pincode 421201 (Tilaknagar, Thane). 196 are still being built, 89 with possession due by the end of 2027. For 238, the completion date on MahaRERA is later than the one first promised. 28 have at least one complaint filed on MahaRERA.
Pincode 421201 also covers: Dombivli East, Dombivli, Dombivali East, Kanchangaon, Ayre, G B Patharli.
“Possession due” is the latest completion date the builder has filed on MahaRERA; “first promised” is the date given at registration. Open a project for its full MahaRERA record.
| Project | MahaRERA status | Possession due (MahaRERA) | First promised | Complaints |
|---|---|---|---|---|
| PALAVA ALLURA C and D PALAVA DWELLERS PVT LTD | De-registered | 30 Mar 2024passed | same | 0 |
| SEONA RED BRICKS DEVELOPERS | Abeyance | 31 Mar 2024passed | 30 Dec 2022 | 0 |
| PALAVA AZZURRA E TO H Palava Dwellers Private Limited (Lodha) | De-registered | 30 Jun 2026passed | same | 0 |
| Mangeshi Dhara Mangesh Dashrath Gaikar | Active | 30 Oct 2026passed | 30 Jun 2026 | 1 |
| Om Maitri Oscar Infrastructure Pvt Ltd | Active | 30 Oct 2026passed | 30 Jun 2025 | 6 |
| PARTH SKYONE Parth Parikh | Active | 30 Oct 2026passed | 30 Dec 2023 | 0 |
| Shree Sai Aangan Mahesh Enterprises | Active | 30 Oct 2026passed | 30 Jun 2026 | 0 |
| SHUBHANKAR ITCON BUILDERS AND DEVELOPERS | Active | 30 Oct 2026passed | 30 Jun 2026 | 0 |
| NAKSHATRA URBAN LIFESPACE | Active | 13 Nov 2026 | 13 Mar 2026 | 0 |
| PREMSADAN CHS NAMRATA REALTORS | Active | 30 Nov 2026 | 31 Jul 2025 | 0 |
| BALAJI ANNEX M/S OM SWAYAMBHU SIDDHIVINAYAK BUILDERS AND DEVELOPERS | Abeyance | 30 Dec 2026 | same | 0 |
| Akshata Co-operative Housing Society Limited Sanjiv Surendra Tamhane | Active | 31 Dec 2026 | 31 May 2026 | 1 |
| DURVE ARINA EVERGREEN DEVELOPERS | Active | 31 Dec 2026 | same | 0 |
| GEETAI SMRUTI NEELPADMA DEVELOPERS | Active | 31 Dec 2026 | 31 Dec 2023 | 0 |
| Mahalaxmi Heights Phase 2 Mahalaxmi Builders & Developers | Active | 31 Dec 2026 | 30 Mar 2021 | 0 |
| NAVKAR BAHAR AMI ENTERPRISES | Active | 31 Dec 2026 | 31 Dec 2025 | 0 |
| PALM VIEW AND SWANAND CHS V J CONSULTANTS | Active | 31 Dec 2026 | 9 Nov 2024 | 0 |
| PANNASH TECHNICON | Active | 31 Dec 2026 | 30 Dec 2023 | 0 |
| Yashashree Arcade YASHASHREE CONSTRUCTIONS | Active | 31 Dec 2026 | 31 Dec 2025 | 0 |
| Yesu Anand Residency Vijay Ananta Patil | Active | 31 Dec 2026 | same | 0 |
| ARYA ARIANA ASHAPURA CORPORATION | Active | 30 Jan 2027 | 30 Mar 2024 | 0 |
| MAHALAXMI ASHISH D WING SWASTIK ENTERPRISES | Active | 30 Jan 2027 | 30 Dec 2023 | 0 |
| NAV PRATIMA CO. OP. HSG. SOC. LTD. NARENDRA KALYANJI PATEL | Active | 30 Jan 2027 | 31 Dec 2024 | 0 |
| PUSHKAR CO. OP. HSG. SOCIETY. LTD. NAVPANCHAM INFRA CO | Active | 30 Jan 2027 | 30 Sep 2026 | 0 |
| SHREEPATI RESIDENCY SANTOSH NARAYAN SINGH THAKUR | Active | 30 Jan 2027 | 31 Dec 2018 | 7 |
| VINAYAK PRERANA NAKSHATRA GROUP | Active | 30 Jan 2027 | 30 Sep 2026 | 0 |
| Balaji Govind SAI BALAJI ENTERPRISES | Active | 30 Mar 2027 | 31 Dec 2025 | 0 |
| Runwal Gardens Phase 4 Bldg No. 35-36 Runwal Residency Private Limited | Active | 30 Mar 2027 | 6 Mar 2026 | 3 |
| KUBER HEIGHTS NAYANTARA BUILDERS AND DEVELOPERS | Active | 31 Mar 2027 | 30 Sep 2025 | 0 |
| OM SHIV GANESH CO OPERATIVE HOUSING SOCIETY LTD IMPRESSIONS NXT | Active | 31 Mar 2027 | 28 Feb 2026 | 0 |
| SHIV SAMRUDDHI HARI INFRASTRUCTURE | Active | 31 Mar 2027 | same | 0 |
| Shanu Majestic Fortune Group of Construction | Active | 20 Apr 2027 | 20 Dec 2026 | 0 |
| ADITYA HEIGHTS ASHAPURA DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Amara Planacres Properties | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| ATHENA IMPRESSIONS NXT | Active | 30 Apr 2027 | 30 Dec 2024 | 0 |
| Biroba Darshan JAY SADGURU BIROBA MAHARAJ DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2024 | 0 |
| CHAKRAPANI COMPLEX PHASE 2 DAYANAND TULASHIRAM KIRATKAR | Active | 30 Apr 2027 | 30 Jun 2024 | 1 |
| FREESIA TIRUPATI BUILDERS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Gajanan Superbia Riddhi Siddhi Developers | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| H R HEIGHTS JAY ASHAPURA DEVELOPERS | Active | 30 Apr 2027 | same | 0 |
| LEELA SHANKAR RESIDENCY EKVEERA AAI CONSTRUCTION | Active | 30 Apr 2027 | 30 Dec 2026 | 0 |
| MAHEK MEADOWS M/s Riddhi Siddhi Infraprojects | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| MAHEK MILLENNIA SUNRISE BUILDERS AND DEVELOPERS | Active | 30 Apr 2027 | 31 Jul 2024 | 1 |
| Mangalmurti Garden Shivam Universal | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Mangalmurti Paradise Shubham Construction | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| MANUPRASAD LAMBODAR INFRA | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| MARATHON NEXTOWN RUBY MARATHON ENER-GEN | Active | 30 Apr 2027 | 31 Dec 2026 | 1 |
| NAV-HIMALAY CHS LTD Shri Siddhi Builders and Developers | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| NIRMAL Bhalchandra Wadnerkar | Active | 30 Apr 2027 | 31 Dec 2017 | 0 |
| OM BHAGWATI OM BHAGWATI BUILDERS AND DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2023 | 0 |
250 more projects
- Rajesh Co. Op. Hsg. Society · 30 Apr 2027
- RENUKA CHS · 30 Apr 2027
- Sai Shivansh · 30 Apr 2027
- SHIVLEELA CO. OP. HSG. SOCIETY. LTD. · 30 Apr 2027
- SHREE ANANDI IMPERIAL · 30 Apr 2027
- SHREE ASTAGANESH CHS · 30 Apr 2027
- SIDDHIVINAYAK ARCADE · 30 Apr 2027
- SWAMI CHETANA · 30 Apr 2027
- VASANT COMPLEX · 30 Apr 2027
- VASTU HERITAGE · 30 Apr 2027
- ADISHAKTI · 31 May 2027
- RAGHUKUNJ CHS LTD · 31 May 2027
- PARK ENCLAVE · 30 Jun 2027
- Pralhad Sakar Arcade · 30 Jun 2027
- Shree Omkar Co-Operative Housing Society LTD · 30 Jun 2027
- SHIVANAND SUDAMA CO. OP. HSG. SOCIETY. LTD. · 30 Jul 2027
- Bhagwati Celeste · 31 Jul 2027
- Jay Pooja Darshan · 31 Jul 2027
- M/S. SADGURU NARAYAN MAHARAJ SHREE GONDEKAR CHS LTD-NAMASHREE · 31 Jul 2027
- OM AVDHOOT DARSHAN CO.OPERATIVE HOUSING SOCIETY LTD · 31 Jul 2027
- SHANKHESHWAR PUSHP · 31 Jul 2027
- THE SIGNATURE · 31 Jul 2027
- AARYA ONE · 30 Aug 2027
- Amaira 2 · 30 Aug 2027
- Hanuman Kutir · 30 Aug 2027
- OM TRIMURTI DARSHAN · 30 Aug 2027
- Aarambha Luxor · 30 Sep 2027
- Gold Crest · 30 Sep 2027
- KALAVATI DARSHAN · 30 Sep 2027
- Balaji Krishna · 30 Oct 2027
- SHIV PRARAMBH · 30 Oct 2027
- Hira-Krishna · 30 Nov 2027
- Jay Annapurna Co Operative Housing Society Ltd · 30 Dec 2027
- Runwal Gardens Phase 4 Bldg No. 38 · 30 Dec 2027
- YASHOMANGAL · 30 Dec 2027
- AMALTAS · 31 Dec 2027
- HORIZON · 31 Dec 2027
- Metro Luxuria · 31 Dec 2027
- SAI DREAM ONE · 31 Dec 2027
- Pragati Om Gulmohar · 30 Jan 2028
- SHREE SPARSH · 30 Jan 2028
- Om Ganesh Puja · 13 Feb 2028
- NASCON PARKVIEW · 29 Feb 2028
- The Identity - Indira · 29 Feb 2028
- SHREE AMAR CHS · 30 Mar 2028
- Shreeram Prasad · 30 Mar 2028
- ASTERIA · 31 Mar 2028
- BALAJI RAGHAV · 1 Apr 2028
- AMBER SPACES · 30 Apr 2028
- Bageshri Co - Operative Housing Society Limited · 30 Apr 2028
- Balaji Kanha · 30 Apr 2028
- Balaji Residency 2 · 30 Apr 2028
- Bhagirathi Smruti · 30 Apr 2028
- Chandrakant Residency · 30 Apr 2028
- Creek Edge · 30 Apr 2028
- DEEPASWI HEIGHTS · 30 Apr 2028
- DEVANSH HEIGHTS · 30 Apr 2028
- GAJANAN PRIDE · 30 Apr 2028
- Irene · 30 Apr 2028
- JOSHI DATTA NAGAR · 30 Apr 2028
- KRISHNA GLORY · 30 Apr 2028
- MAITRI NAVKAR · 30 Apr 2028
- Manakarnika CHS Ltd · 30 Apr 2028
- MY CITY PHASE II CLUSTER 5 PART II · 30 Apr 2028
- NIRAMAYA · 30 Apr 2028
- SAGAR KUNJ HIGHLAND · 30 Apr 2028
- SARAS RESIDENCY · 30 Apr 2028
- Sarthi Serenity · 30 Apr 2028
- SHREE EMPIRE · 30 Apr 2028
- SRINIVASA NILAYAM · 30 Apr 2028
- THE ENCLAVE · 30 Apr 2028
- Tulsi Height · 30 Apr 2028
- Versatile Horizon · 30 Apr 2028
- Vinayak Crown · 30 Jun 2028
- Nandadeep CHS Ltd · 31 Jul 2028
- SWAMI ELITE · 31 Jul 2028
- JIGNESH CO. OP. HSG. SOCIETY. LTD. · 3 Aug 2028
- Madhushilp CHS · 30 Sep 2028
- AMBER ONE · 30 Oct 2028
- Harisha · 30 Oct 2028
- KMC SKYLINE · 30 Oct 2028
- Om Namo Gurukrupa Co - Operative Housing Society Ltd · 30 Oct 2028
- Omkar Srushti · 30 Oct 2028
- Ursekar Estate · 30 Oct 2028
- Vastu Amikumbh · 30 Nov 2028
- ASHTAVINAYAK DARSHAN · 30 Dec 2028
- RUDRA RESIDENCY · 31 Dec 2028
- Swami · 30 Jan 2029
- NEW ARPAN CHS · 28 Feb 2029
- NAV SAMIDHA CO-OP HSG SOC LTD · 1 Apr 2029
- Nilesh Co-OP Housing Society Ltd · 27 Apr 2029
- Amber Elegance · 30 Apr 2029
- AROMA HEIGHTS · 30 Apr 2029
- Balaji Sarvoday - A Wing, B Wing and E Wing · 30 Apr 2029
- MAITRI NARAYAN BHUVAN · 30 Apr 2029
- MANGALMURTI MIDWEST · 30 Apr 2029
- MANGESHI DAZZLE II · 30 Apr 2029
- MARATHON NEXTOWN JASPER · 30 Apr 2029
- NAKSHATRA DEVELOPERS · 30 Apr 2029
- RAM LAXMAN CO-OPERATIVE HOUSING SOCIETY LTD. · 30 Apr 2029
- RAMASHRAY · 30 Apr 2029
- Sarthi Saffron · 30 Apr 2029
- Sarvoday Patwardhan Baug - Building No 2 · 30 Apr 2029
- SHREE RAM KRISHNA HARI COMPLEX · 30 Apr 2029
- Sunrise Bliss · 30 Apr 2029
- Sunrise Maple · 30 Apr 2029
- VASTU LUXURIA · 30 Apr 2029
- YASHRAJ · 30 Apr 2029
- ZU Galaxy · 30 Apr 2029
- Yashogad Pride · 31 May 2029
- Yashogiri · 15 Jul 2029
- Herambh Hights · 31 Jul 2029
- Shree Deepjyoti · 31 Jul 2029
- Sudama Chhatra · 31 Jul 2029
- Swachhand CHS Ltd · 31 Jul 2029
- MILAN HEIGHTS · 19 Aug 2029
- Balaji Heights · 30 Aug 2029
- RIVA · 30 Aug 2029
- THE MEADOWS · 31 Aug 2029
- BALAJI SADGURU · 30 Sep 2029
- OMKAR AANGAN · 30 Sep 2029
- SHREE SAMARTH DARSHAN CO-OPERATIVE HOUSING SOCIETY LIMITED · 13 Oct 2029
- SOLITUDE · 30 Oct 2029
- SPLENDOR LUXOR · 31 Dec 2029
- Sunrise Parkview Phase II · 31 Dec 2029
- Komal Palace CHS LTD · 30 Jan 2030
- Splendor Serenity · 30 Jan 2030
- ASHAPURA RIDDHI TOWER · 30 Apr 2030
- Hariom Elite · 30 Apr 2030
- KAPLESHWARA RESIDENCY · 30 Apr 2030
- OM SHIV PARVATI CHS Ltd · 30 Apr 2030
- SHREE RAJLAXMI PRASANNA CHS LTD · 30 Apr 2030
- SKY MARINA · 30 Apr 2030
- Vivaan Heights · 30 Apr 2030
- Splendor Icon · 30 Aug 2030
- MAHAVIR HEIGHTS · 30 Sep 2030
- Aarambha Crystal · 30 Oct 2030
- KULSWAMINI BRAHMAND WING B JANAI SHANKAR · 31 Dec 2030
- Sarvoday Harmony · 31 Dec 2030
- Ambrin 4 · 30 Apr 2031
- BALLALESHWAR GALAXY · 30 Apr 2031
- Nivasa Green City Phase 1 · 30 Apr 2031
- Milan Dham · 19 Jul 2031
- SSL BELLAGIO · 30 Apr 2032
- SUNRAJ SOLITAIRE · 30 Apr 2032
- Vedvika · 30 Apr 2032
- MANGESHI DAZZLE - III · completed
- SARVODAY SNEH · completed
- MARATHON NEXTOWN EMERALD · completed
- VASTU DEVELOPER · completed
- PURUSHOTTAM KSHITIJ · completed
- SHREE KRISHNA PLAZA · completed
- VARSHA PALM · completed
- VIRAT OZONE · completed
- YASHOGHAR CHS · completed
- GNP GALLERIA · completed
- Chandraprabha Heights · completed
- SUNSHINE ELEGANCE · completed
- Rangrekha Heights · completed
- SHREE SAI RAJ PARK BUILDING NO 3 C WING · completed
- Virat Mansion · completed
- MAKARAND-BANK OF BARODA EMPLOYEES CO-OPERATIVE HOUSING SOCIETY LIMITED · completed
- Pranjali Heights · completed
- HASTI NAVJEEVAN DEEP. · completed
- AMBRIN · completed
- JIVAN SAFALYA CHS LTD · completed
- SAMRUDDHI · completed
- Savitri Smruti · completed
- MARATHON NEXTOWN CORAL · completed
- Shree Samarth Krupa · completed
- DVARAKA MALLHAR · completed
- MAHALAXMI - ONE · completed
- Audumbar CHS · completed
- HEMANT SHISHIR CO.OP HSG · completed
- PUSHKAR CO OP HSG SOCIETY PRAPOSED · completed
- VATSALYA SKYLINE · completed
- PALAVA AZZURRA A TO D · completed
- AVIGHNA KRUPA · completed
- OMKAR HEIGHTS · completed
- Saayam Visava · completed
- MAULI CONSTRUCTION · completed
- Arya Sapphire · completed
- MARATHON NEXTOWN SAPPHIRE · completed
- SRUSHTI RESIDENCY BUILDING E · completed
- MAHAVIR HEIGHTS NX · completed
- THE CLASSIQUE · completed
- NEEL KRISHNA CHS PROPOSED · completed
- GLOBAL PARADISE · completed
- Asha Icon · completed
- Shree Kacharnath CHS Ltd · completed
- Shreeram Vaishali · completed
- YASHLATA PALACE · completed
- Bank of Maharashtra Employees Manisha Co-Operative Housing Society Limited · completed
- MY CITY- PHASE II -CLUSTER 05 - PART I · completed
- PUSHKARAJ CHS PROPOSED · completed
- ASHTAVINAYAK · completed
- ARIN · completed
- MANDAR ARCADE · completed
- SARVODAY SHIV SHRADDHA · completed
- Saket Imperial · completed
- AMBER TARA · completed
- Sunrise Parkview Phase I · completed
- Balaji Vasant · completed
- Gaurang Apartment · completed
- Shri Sai Mangal Co-Op Housing Society Ltd A Building · completed
- Swami Shankaranand Business Center · completed
- Pallavi Palace · completed
- Shree Ram Radha Damodar · completed
- Sarthi Emrald · completed
- Balaji Gopal · completed
- REGENCY SAPPHIRE · completed
- SUNRAJ SUPREME · completed
- SUMATI SKYLINE · completed
- Balaji Vishant · completed
- EMERALD · completed
- SAPTASHRUNGI · completed
- MY CITY PHASE II CLUSTER 5 PART III · completed
- RAVICHANDRA CHS PROPOSED · completed
- RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY · completed
- INDIRA TOWERS · 31 Dec 2019
- MAHALAXMI KRUPA · 30 Nov 2020
- Shantiniketan Wing B5 · 30 Dec 2021
- EKNATH TOWER · 30 Mar 2022
- Milestone · 30 Mar 2022
- Shree Apartmetn · 30 Jun 2022
- MANGALMURTI GALAXY · 29 Sep 2022
- MADHU PREM · 30 Nov 2022
- SARVODAY SHWETA · 30 Dec 2022
- TSP HEIGHTS · 31 Dec 2022
- TANISHKA RESIDENCY · 15 Jan 2023
- BALAJI DARSHAN · 30 Mar 2023
- SAI RESIDENCY · 31 Mar 2023
- SATIS CHS · 31 Mar 2023
- ANAND DHAM · 30 Sep 2023
- SWASTIK HEIGHTS · 30 Sep 2023
- RADHA KRISHNA HEIGHTS · 25 Dec 2023
- Datta Leela Residency · 31 Dec 2023
- MANGALSING APARTMENT · 31 Dec 2023
- Vikram Villa Co-Op Housing Society · 31 Jan 2024
- SHREE GANESH BUILDERS AND DEVELOPER · 29 Feb 2024
- SHUBHAM GALAXY - B WING · 31 Mar 2024
- Vitthal Rukmini Building · 31 Mar 2024
- ASHTAVINAYAK ENTERPRISES · 1 Apr 2024
- Maitri Rukmini Sadan · 30 May 2024
- THE ONE PEARL · 31 May 2024
- NANU PARK · 30 Jun 2024
- Sai Orchid Phase 1 · 30 Jun 2024
- THE VALAJI ESTATE · 5 Jul 2024
- PRINCESS PARADISE · 29 Sep 2024
- Radha - The Divine Mystery · 15 Oct 2024
Other areas in Thane
- Kulgaon · 735
- Kalyan · 510
- Ambernath · 403
- Bhiwandi · 348
- Mira Road East · 277
- Kalyan East · 250
- Manpada · 232
- Naupada · 223
- Vishnunagar · 198
- Mumbra · 188
- Sandozbaugh · 180
- Thane · 161
Data compiled by GharKundli (gharkundli.com) from MahaRERA public records. Projects are grouped by the pincode filed on MahaRERA.