MahaRERA projects in Bhiwandi, Thane (421302)
According to GharKundli's check of MahaRERA records, 348 housing projects are registered in pincode 421302 (Bhiwandi, Thane). 235 are still being built, 80 with possession due by the end of 2027. For 252, the completion date on MahaRERA is later than the one first promised. 62 have at least one complaint filed on MahaRERA.
Pincode 421302 also covers: Temghar, Kamatghar, Kalher, Bhadwad, Anjur, Millat Nagar.
“Possession due” is the latest completion date the builder has filed on MahaRERA; “first promised” is the date given at registration. Open a project for its full MahaRERA record.
| Project | MahaRERA status | Possession due (MahaRERA) | First promised | Complaints |
|---|---|---|---|---|
| Upper Thane - Meadows A MACROTECH DEVELOPERS LIMITED (Lodha) | De-registered | 30 Sep 2025passed | same | 0 |
| Upper Thane - Meadows E, F, G MACROTECH DEVELOPERS LIMITED (Lodha) | De-registered | 30 Oct 2025passed | same | 0 |
| Upper Thane - Tiara H MACROTECH DEVELOPERS LIMITED (Lodha) | De-registered | 28 Nov 2025passed | same | 0 |
| ARIHANT CITY PHASE-II - P BUILDING ARIHANT ENTERPRISES | De-registered | 31 Dec 2025passed | same | 0 |
| OASIS HABITATS FAISAL NISAR AHMED SHAIKH | Abeyance | 30 Jun 2026passed | same | 1 |
| Sai Platinum Residency MM Landmark Realty LLP | Active | 15 Oct 2026passed | 31 Dec 2024 | 0 |
| SAROVAR DARSHAN SHRI KHATU CONSTRUCTION | Active | 30 Oct 2026passed | 31 Mar 2019 | 0 |
| TAHRIM HIEGHTS PHOENIX ENTERPRISES | Active | 30 Oct 2026passed | 31 Dec 2025 | 0 |
| Omkar Residency A-Wing K K GROUP | Active | 13 Dec 2026 | 13 Dec 2025 | 0 |
| DIAMOND PALACE GULAMSHAH AZGAR ALI | Active | 31 Dec 2026 | 30 Dec 2023 | 0 |
| PEHLA GHAR - DIVEKAR COMPLEX LAABH BUILDCON | Active | 31 Dec 2026 | 30 Dec 2023 | 4 |
| Shree Sadan Complex Shree Buildcon | Active | 31 Dec 2026 | 31 Dec 2025 | 0 |
| NAZIR HEIGHTS A M CONSTRUCTIONS | Active | 30 Jan 2027 | 30 Sep 2026 | 0 |
| ROSE RESIDENCY KUNAL RAMESH KARANIYA | Active | 30 Jan 2027 | 30 Sep 2026 | 0 |
| SAMRUDDHI FLORA SAMRUDDHI BUILDCON | Active | 30 Jan 2027 | 30 Jul 2024 | 0 |
| SANIYA HEIGHTS MOONSHINE REALTORS PVT LTD | Active | 30 Jan 2027 | 30 Dec 2021 | 6 |
| ANANTAM HEIGHTS KANAK REALTY | Active | 10 Feb 2027 | 30 Jun 2024 | 0 |
| USHA RESIDENCY SHREE BUDHDEV INFRA | Active | 28 Feb 2027 | 31 Dec 2025 | 0 |
| MULTANI RESIDENCY M R Developers | Active | 30 Mar 2027 | 30 Nov 2026 | 0 |
| Shree Paradise Tai Infrastructure | Active | 31 Mar 2027 | same | 0 |
| Arunoday Heights Sankalp Builders and Developers | Active | 16 Apr 2027 | 16 Dec 2026 | 0 |
| AL AMIN TOWER S V BUILDERS | Active | 30 Apr 2027 | 30 Jun 2023 | 1 |
| ANUSAYA COMPLEX BUILING NO 3 GHANSHYAM SITARAM BHOIR | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Arfa Garden Quba Homes LLP | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| ARIHANT CITY PHASE-II - A BUILDING ARIHANT ENTERPRISES | De-registered | 30 Apr 2027 | 31 Dec 2026 | 0 |
| ARIHANT CITY PHASE-II - B BUILDING ARIHANT ENTERPRISES | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| ARIHANT CITY PHASE-II - C BUILDING ARIHANT ENTERPRISES | De-registered | 30 Apr 2027 | 31 Dec 2026 | 0 |
| ARUNODAY PLAZA SANKALP BUILDERS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| ATLANTA RESIDENCY PHASE II SRI BALAJI DEVELOPER | Active | 30 Apr 2027 | 31 Dec 2019 | 1 |
| CENTER ONE MURA REALTY LLP | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| DEV DRASHTI EMPIRE PHASE 1 SHRI HARI REALTY | Active | 30 Apr 2027 | 30 Apr 2024 | 0 |
| DEVKRUPA HEIGHTS NILESH SATISH PATIL | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| DHEERAJ HEIGHTS- PHASE-II SASHWAT HOME | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| DHEERAJ HEIGHTS-PHASE-1 SASHWAT HOME | Active | 30 Apr 2027 | 31 Dec 2024 | 0 |
| KHUSHI AXIS WORLD KHUSHI AXIS INFRATECH LLP | Active | 30 Apr 2027 | 31 Dec 2024 | 0 |
| KOHINOOR RESIDENCY ABRAR HAROON KHAN | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| NARAYANI DHAM BUILDING NO 2A AND 2B MAYA DEVELOPER | Active | 30 Apr 2027 | 31 Dec 2024 | 0 |
| Olivia Bliss Jai Bhawani Orchid Infra LLP | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Om Square Buildtech Ventures Realty | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| ORNATE RISE Ornate Buildcon Developers | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| OZONE GALAXY Phase III HALLMARK INFRA REALTY LLP | Active | 30 Apr 2027 | 30 Dec 2025 | 0 |
| PADMADISHA PARADISE - BUILDING 2 PADMADISHA PARADISE | Active | 30 Apr 2027 | 30 Dec 2026 | 0 |
| ROYAL ENCLAVE OM DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| SADRI PLAZA SHUBH ENTERPRISES | Active | 30 Apr 2027 | 31 Dec 2025 | 0 |
| SAI DEEP RESIDENCY KISHOR RATAN CHAUDHARY | Active | 30 Apr 2027 | 31 Dec 2024 | 0 |
| Sai Narayana Residency MM Landmark Realty LLP | Active | 30 Apr 2027 | 31 Dec 2025 | 0 |
| SAI NIDA APARTMENT PRASHANT WAGAJI GAWANDE | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| SAI RAM HEIGHTS SAI RAM BUILDERS AND DEVELOPERS | Active | 30 Apr 2027 | 31 Mar 2025 | 0 |
| SHIVAM RESIDENCY-PHASE 1 SHIVAM DEVELOPERS | Active | 30 Apr 2027 | 30 Dec 2023 | 0 |
| SINI ENTERPRISES VINOD BALNATH PATIL | Active | 30 Apr 2027 | 30 Dec 2023 | 0 |
250 more projects
- SUNSHINE LANDMARK · 30 Apr 2027
- SWARUP TOWER · 30 Apr 2027
- Upper Thane-IRIS Wing C · 30 Apr 2027
- WADHWA RHODESIA · 30 Apr 2027
- SHIV TIRTH · 28 Jun 2027
- GANGOTRI HEIGHTS · 30 Jun 2027
- PRINCE AVENUE · 30 Jun 2027
- NEELKANTH SADAN · 30 Jul 2027
- AYODHYA · 31 Jul 2027
- Dharmavihar C Wing · 31 Jul 2027
- L M TOWER · 31 Jul 2027
- Munisuvrat Textile Park · 31 Jul 2027
- ROYAL VILLAS · 31 Jul 2027
- SHREE RESIDENCY · 31 Jul 2027
- VARDHAMAN VATIKA · 31 Jul 2027
- BELPATRA · 30 Sep 2027
- ANWAR ARCADE · 30 Oct 2027
- DREAM HEIGHTS · 30 Oct 2027
- HUMSAAZ HOMES · 30 Oct 2027
- MAITRI ICON · 30 Oct 2027
- Shagun Residency · 30 Oct 2027
- Upper Thane-IRIS Wing D · 31 Oct 2027
- Upper Thane-Tiara H · 30 Nov 2027
- AFRA HEIGHT · 31 Dec 2027
- ARIHANTCITY PHASE-I - D3 - BUILDING · 31 Dec 2027
- DGT - Sector 3A - Cluster 2 - Phase 1 · 31 Dec 2027
- Lodha Villa Royale TDLR 2 · 31 Dec 2027
- Sapphire Homes · 31 Dec 2027
- THE LIVIN · 31 Dec 2027
- Upper Thane-IRIS Wing A · 31 Dec 2027
- Shubharambh Residency · 24 Mar 2028
- The Green Sapphirre · 30 Mar 2028
- AAI MAULI PARK BUILDING B · 30 Apr 2028
- APR Realty Crown · 30 Apr 2028
- BAGH-E-FIRDOUS TOWER · 30 Apr 2028
- DEEP LAXMI HEIGHT · 30 Apr 2028
- Infinity Square · 30 Apr 2028
- Irasa Greens · 30 Apr 2028
- JOGANI PRIDE · 30 Apr 2028
- LEO BUSINESS COMPLEX · 30 Apr 2028
- NANDAI RESIDENCY · 30 Apr 2028
- NARAYANI DHAM BUILDING NO 1 B · 30 Apr 2028
- NARAYANI DHAM BUILDING NO 1A · 30 Apr 2028
- R K APARTMENT · 30 Apr 2028
- REGAL SQUARE PH 4 TOWER 6 AND 8 · 30 Apr 2028
- ROYAL FLORA · 30 Apr 2028
- RUNWAL DREAMS · 30 Apr 2028
- SAI HEAVEN · 30 Apr 2028
- SAI VATIKA RESIDENCY · 30 Apr 2028
- Samruddhi Kalash · 30 Apr 2028
- Samruddhi Residency · 30 Apr 2028
- SIYARA FORTUNE B BUILDING · 30 Apr 2028
- SIYARA FORTUNE BUILDING A WING B · 30 Apr 2028
- TWIN TOWERS · 30 Apr 2028
- VARSHA HEIGHTS · 30 Apr 2028
- VITHOBA NIWAS · 30 Apr 2028
- VRUNDAVAN PARK · 30 Apr 2028
- WADHWA RHODESIA PHASE-II · 30 Apr 2028
- YOGI BELLEZA · 30 Apr 2028
- ZARA HEIGHTS · 30 Apr 2028
- UTSAV · 30 May 2028
- DWARKA · 31 May 2028
- Upper Thane - Tiara G · 31 May 2028
- Upper Thane-Supremus · 31 May 2028
- DGT - Sector 3A - Cluster 2 - Phase 2 · 30 Jun 2028
- DGT - Sector 3A - Cluster 2 - Phase 3 · 30 Jun 2028
- MARINE HEIGHTS · 30 Jun 2028
- CONTINENTAL FUTURA · 31 Jul 2028
- Om Jalaram Dham · 31 Jul 2028
- RIVIERA TOWER · 31 Jul 2028
- Sarvoday Greens Phase 3 · 31 Jul 2028
- Upper Thane - Eden D · 31 Jul 2028
- UPPER THANE-IRIS WING B · 31 Jul 2028
- Upper Thane-Verdura A · 31 Jul 2028
- DGT - Sector 3A - Cluster 2 - Phase 4 · 31 Aug 2028
- MANGALMURTI HEIGHTS · 30 Sep 2028
- Upper Thane-IRIS Wing G · 30 Sep 2028
- Yuvan Prime · 30 Sep 2028
- ASHOKA COMPLEX · 30 Oct 2028
- ASMA GARDEN · 30 Oct 2028
- GODREJ UPAVAN · 30 Oct 2028
- Opal Annex · 30 Oct 2028
- S.I. ARCADE · 30 Oct 2028
- Vrundavan Park Jaswandi · 30 Oct 2028
- YASHAL TOWER · 30 Oct 2028
- Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1 · 31 Oct 2028
- BHUMI WORLD SKY · 12 Dec 2028
- Xrbia Thane Ph 3 · 30 Dec 2028
- ARIHANT CITY PHASE-II - K BUILDING · 31 Dec 2028
- ARIHANT CITY PHASE-II - M BUILDING · 31 Dec 2028
- ARIHANT CITY PHASE-II - N BUILDING · 31 Dec 2028
- IMPERIAL TOWER · 31 Dec 2028
- KALYAN RESIDENCY · 31 Dec 2028
- Metro Heights · 31 Dec 2028
- NEELKANTH PALMS · 31 Dec 2028
- OM SAI ONE PARK · 31 Dec 2028
- OSIANS GARDEN - PHASE-II · 31 Dec 2028
- Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 2 · 28 Feb 2029
- SIYARA AVENUE · 31 Mar 2029
- AL-JANNAH MANZIL · 30 Apr 2029
- ANTALIYA · 30 Apr 2029
- ATLANTA EDENWORLD PHASE II · 30 Apr 2029
- AVANTIKA · 30 Apr 2029
- Balaji Bliss - B Wing · 30 Apr 2029
- CENTER PLAZA · 30 Apr 2029
- GEBI PRERNA · 30 Apr 2029
- Green Park Residency · 30 Apr 2029
- Haware Palms Kalyan Phase 1 · 30 Apr 2029
- Haware Palms Kalyan Phase II · 30 Apr 2029
- Haware Paramount Kalyan Phase 1 · 30 Apr 2029
- Haware Paramount Kalyan Phase IV · 30 Apr 2029
- Haware Paramount Kalyan Phase- III · 30 Apr 2029
- Haware Paramount Kalyan Phase-II · 30 Apr 2029
- Kohinoor Uptown T7 · 30 Apr 2029
- PADMADISHA PARADISE BUILDING TYPE - 3 · 30 Apr 2029
- PATHAN TOWER · 30 Apr 2029
- Raghunath Heights · 30 Apr 2029
- SHATRUNJAY HEIGHTS · 30 Apr 2029
- SIYARA ICON · 30 Apr 2029
- TALL RESIDENCY · 30 Apr 2029
- USHA PARADISE · 30 Apr 2029
- Vivanta Bliss Phase II · 30 Apr 2029
- ROYAL RESIDENCY · 31 May 2029
- Sai Swastik Ananta · 11 Jun 2029
- ARIHANT AARADHYA PHASE I · 31 Jul 2029
- JANGID EMPIRE · 31 Jul 2029
- MALIKA HEIGHTS · 31 Jul 2029
- SIYARA SIGNATURE · 31 Jul 2029
- RUBY HEIGHT · 30 Aug 2029
- UNITY TOWERS · 30 Oct 2029
- Upper Thane-Woodlands B · 30 Oct 2029
- Vistara World · 30 Oct 2029
- SIYARA VIVA · 28 Nov 2029
- NIRVANA HEIGHTS · 15 Dec 2029
- HIGH RISE APARTMENT · 31 Dec 2029
- KALYAN VIHAR · 31 Dec 2029
- KARTIK ENCLAVE · 31 Dec 2029
- MORYA CREEK CITY PHASE I · 31 Dec 2029
- SIYARA CROWN · 31 Dec 2029
- USHA GREENS · 31 Dec 2029
- USHA GREENS · 31 Dec 2029
- USHA GREENS · 31 Dec 2029
- ARZOO GREENS · 13 Mar 2030
- KOHINOOR UPTOWN T1 & T6 · 31 Mar 2030
- ARJUN HEIGHTS · 30 Apr 2030
- DATTA SRUSHTI COMPLEX · 30 Apr 2030
- MB GREEN COURT · 30 Apr 2030
- PURANJAY HEIGHTS · 30 Apr 2030
- RADHA KRISHNA NIVAS · 30 Apr 2030
- Riddhi Siddhi NX · 30 Apr 2030
- ROYAL PARK · 30 Apr 2030
- SHIVMASTU GREENS · 30 Apr 2030
- SIYARA BUSINESS PARK · 30 Apr 2030
- SUMERU HILLS · 30 Apr 2030
- VIJAY NAGAR GROUP · 30 Apr 2030
- ZIRCON HEIGHTS B WING PHASE II · 30 Apr 2030
- RANGARI HEIGHTS · 12 May 2030
- KIRAN HEIGHTS · 31 Jul 2030
- Munisuvrat Oasis · 31 Jul 2030
- SAMATA HEIGHTS · 30 Sep 2030
- Sumukh Galaxia · 30 Sep 2030
- Rehman Complex Phase 2 · 31 Dec 2030
- SKORA ML GOLDEN PALMS · 31 Dec 2030
- Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 3 · 28 Feb 2031
- Pearl Avenue · 31 Mar 2031
- AL-HASAN · 30 Apr 2031
- ARIHANT AARADHYA PHASE II · 30 Apr 2031
- KT SKYLIGHT · 30 Apr 2031
- SKORA ML VISTA · 30 Apr 2031
- SUKRUTH AVADH · 30 Apr 2031
- Royal Complex · 31 May 2031
- Adelphi A and B · 31 Jul 2031
- SILVER ANANTAM · 30 Nov 2031
- HARSHA APARTMENT CO-OPERATIVE HOUSING SOCIETY LIMITED · 30 Apr 2032
- Asma Garden Phase 2 · 31 Dec 2032
- R N PLAZA · 31 Dec 2032
- Aayat Manzil · 30 Apr 2033
- Anaya Apartment · 30 Apr 2033
- Arbisha Apartment · 30 Apr 2033
- Everest Heights · 30 Apr 2033
- PENTAGON HEIGHTS · 30 Apr 2033
- SKY HEIGHTS · 30 Apr 2033
- TAJ PALACE · 30 Apr 2033
- ASGAR HEIGHTS · 30 Apr 2035
- AL ABBAS BUILDING NO. 06 · 30 Apr 2036
- ATLANTA RESIDENCY PHASE I · completed
- PENTAGON HEIGHTS · completed
- PADMADISHA PARADISE · completed
- Shree Mahaveer Krupa · completed
- OM SAI HOME · completed
- Ornate Kallisto Phase I · completed
- SAI LEELA · completed
- Jainam Greens · completed
- ZEENAT RESIDENCY · completed
- M/s SIMCO JYOTI · completed
- Upper Thane Greenville A - E, E1, F - I · completed
- Upper Thane Treetops A - C, C1, C2, D - F · completed
- UPPER THANE - TIARA A to B · completed
- GAYATRI CLASSIC · completed
- Upper Thane - Sereno A, B, B1 · completed
- Upper Thane - Tiara C · completed
- Upper Thane - Woodlands G,H,I · completed
- MAHAVIR DREAMLAND · completed
- REGAL SQUARE PHASE III BLDG NO 7 · completed
- SHUBHAM ATLANTIS · completed
- UPPER THANE - TIARA D · completed
- UPPER THANE - Tiara I · completed
- AL ABBAS · completed
- OM SAI HOME · completed
- SARVODAYGREENS · completed
- UPPER THANE -SERENO A1 · completed
- Vivanta S Bliss C Wing · completed
- VRUNDAVAN · completed
- AMBER HEIGHTS · completed
- INFINI LANDMARK GYAN GANGA APARTMENTS · completed
- VARDHAMAN MARUTI · completed
- Magnolia A B and C · completed
- ADARSH TOWER · completed
- SWAPNALOK · completed
- AL TAJ · completed
- CENTRAL PLAZA · completed
- GODREJ NIRVAAN · completed
- Ornate Kallisto Phase II · completed
- Ornate Kallisto Phase IV · completed
- R R RESIDENCY - D WING · completed
- OM SAI HOME-D · completed
- REAL HEIGHTS · completed
- Upper Thane - Tiara E, F · completed
- ZIRCON HEIGHTS · completed
- GAYATRI KRUPA · completed
- ARIHANT CITY PHASE-I BUIDING-A,B,C,D,D1,D2,H,H1,H2,F · completed
- SEVEN HEIGHTS · completed
- KAPIL BLING · completed
- Upper Thane - Sereno A1, C & C1 · completed
- Codename One and Only · completed
- Upper Thane-Casa Eden · completed
- UPPER THANE - WOODLANDS A AND J · completed
- UPPER THANE - WOODLANDS C AND D · completed
- VRINDAVAN RESIDENCY · completed
- AHMED ARCADE · completed
- Upper Thane-MLCP C Shops · completed
- ALPHA RESIDENCY · completed
- Upper Thane - Eden E · completed
- UMA TOWER · 30 Jun 2019
- SHREE SIDDHIVINAYAK · 31 Dec 2019
- HARSH RAJ BUILDERS AND DEVELOPERS · 30 Sep 2020
- ABDULLAH ARCADE · 30 Dec 2021
- VRUNDAVAN-I · 30 Jun 2022
- DEEPLAXMI HEIGHT · 30 Dec 2022
- LAABH ENCLAVE- PHASE 2 · 31 Mar 2023
Other areas in Thane
- Kulgaon · 735
- Kalyan · 510
- Ambernath · 403
- Tilaknagar · 354
- Mira Road East · 277
- Kalyan East · 250
- Manpada · 232
- Naupada · 223
- Vishnunagar · 198
- Mumbra · 188
- Sandozbaugh · 180
- Thane · 161
Data compiled by GharKundli (gharkundli.com) from MahaRERA public records. Projects are grouped by the pincode filed on MahaRERA.