MahaRERA projects in Neral, Raigad (410101)
According to GharKundli's check of MahaRERA records, 291 housing projects are registered in pincode 410101 (Neral, Raigad). 134 are still being built, 54 with possession due by the end of 2027. For 197, the completion date on MahaRERA is later than the one first promised. 26 have at least one complaint filed on MahaRERA.
Pincode 410101 also covers: Mamdapur, Karjat, Dhamote, Bopele, Labdhi Gardens, Pashane.
“Possession due” is the latest completion date the builder has filed on MahaRERA; “first promised” is the date given at registration. Open a project for its full MahaRERA record.
| Project | MahaRERA status | Possession due (MahaRERA) | First promised | Complaints |
|---|---|---|---|---|
| Panvelkar Swarajya Phase-I Panvelkar Infrastructures Private Limited | De-registered | 30 Dec 2021passed | 31 Dec 2019 | 0 |
| IMPERIAL FORTUNE INFRA DEVELOPERS | Abeyance | 12 Feb 2024passed | same | 0 |
| GLOBE FANTASIAA - MOONSTONE GLOBE INDIA INFRA | Abeyance | 31 Dec 2026 | same | 0 |
| GLOBE FANTASIAA- CELESTIA GLOBE INDIA INFRA | Active | 31 Dec 2026 | same | 0 |
| IRA APARTMENT PRASHANT PRAKASH SAWANT | Active | 31 Dec 2026 | same | 0 |
| Madina Complex Al-Hamd Developers | Active | 31 Dec 2026 | 31 Aug 2026 | 3 |
| Renaissance Royal Phase 1 Shree Sharada Infrastructures | Active | 31 Dec 2026 | 30 Dec 2024 | 0 |
| VAASTU SANKALP VAASTU ENTEPRISES | Active | 31 Dec 2026 | 30 Jun 2024 | 0 |
| ARSH APARTMENT MATEEN RAFIQUE PATEL | Active | 30 Jan 2027 | 30 Jun 2025 | 0 |
| NAAZ PLAZA PRESTIGE REALITY | Active | 30 Jan 2027 | 30 Jun 2025 | 0 |
| HIMALAYA GARDENS HIMALAYA BUILDERS AND DEVELOPERS LLP | Active | 31 Mar 2027 | 1 Oct 2024 | 0 |
| ALIZA APARTMENTS M/S SKY HOMES | Active | 15 Apr 2027 | 15 Dec 2026 | 0 |
| AARSH RESIDENCY SHUBHAM ENTERPRISES | Active | 30 Apr 2027 | 30 Dec 2023 | 0 |
| ANAND PARK NARENDRA SOPAN DAHITANKAR | Active | 30 Apr 2027 | 31 Oct 2019 | 0 |
| Bellim Residency Mohd Khalid Mohd Iqbal Shaikh | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Cluster A Shibam Associates | Active | 30 Apr 2027 | 9 Dec 2023 | 0 |
| DHRUV RESIDENCY PLATINUM KAMLESH DEVIDAS DHRUV | Active | 30 Apr 2027 | 31 Dec 2025 | 0 |
| ELCARIM ENCLAVE ELCARIM DEVELOPERS AND PROPERTIES PRIVATE LIMITED | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| ELITE HOUSE FORTUNE INFRA DEVELOPERS | Active | 30 Apr 2027 | 12 Feb 2024 | 0 |
| FLORENCE LANDMARK PHASE 1 PALAK DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| FRIENDS ARCADE FRIENDS DEVELOPERS | Active | 30 Apr 2027 | 30 Dec 2023 | 0 |
| LABDHI GARDENS PHASE 6 Labdhi Lifestyle Limited | Active | 30 Apr 2027 | 30 Dec 2026 | 0 |
| LABDHI GARDENS PHASE 7 Labdhi Lifestyle Limited | Active | 30 Apr 2027 | 30 Dec 2026 | 0 |
| MULLA RESIDENCY Zafar Mohd Rashid Mulla | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| NIKHIL PARK GURUDEV DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Olympeo Retreat - Phase 2 PARADISO REALTY SOLUTIONS LLP | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| PRAARAMBH SADANIKA S.B. REALTORS | Active | 30 Apr 2027 | 31 Dec 2025 | 0 |
| SHALIMAR GALAXY MOHAMMED SALIM AKBAR HUSSAIN SHAIKH | Active | 30 Apr 2027 | 31 Dec 2019 | 0 |
| SUNNY HOUSING KIRAN DILIP CHAVAN | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| SWAMI KIMAYA GALAXY ENTERPRISES | Active | 30 Apr 2027 | 30 Dec 2021 | 0 |
| SWAMI MAHIMA Shree Samarth Developers | Active | 30 Apr 2027 | 31 Dec 2024 | 3 |
| Swami Sadan Anil Baburao Achrekar | Active | 30 Apr 2027 | 31 Dec 2025 | 0 |
| THE GREEN ORCHID PHASE III SHAKTI DEVELOPERS | Active | 30 Apr 2027 | 30 Dec 2026 | 0 |
| ZAINAB HEIGHTS SHALIN DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| SHREE SAI SHAMBU SAMEER LALCHAND MHATRE | Active | 31 May 2027 | same | 0 |
| Shree Parshwanath Residency OM SAI CONSTRUCTION | Active | 9 Jun 2027 | 9 Feb 2027 | 0 |
| HARSHITA APARTMENT PRASHANT PRAKASH SAWANT | Active | 28 Jun 2027 | 28 Feb 2027 | 0 |
| SWAMI AASHRAY STRUCTURA REALTY | Active | 30 Jun 2027 | 30 Jun 2026 | 0 |
| ALIYA PARK UNITY CONSTRUCTION | Active | 31 Jul 2027 | 31 Dec 2023 | 0 |
| ANAND AARADHYA AARADHYA DEVELOPERS | Active | 31 Jul 2027 | 31 Mar 2027 | 0 |
| KAILASH COMPLEX PHASE 2 BRAMHA CONSTRUCTIONS | Active | 31 Jul 2027 | 31 Mar 2027 | 0 |
| MALHAR HEIGHTS MALHAR ENTERPRISES | Active | 31 Jul 2027 | 30 Mar 2023 | 0 |
| Shanti Lake View Padmavati Developers | Active | 31 Jul 2027 | 31 Mar 2027 | 0 |
| SUZAIN PLAZA S N DEVELOPERS | Active | 31 Jul 2027 | 31 Dec 2025 | 0 |
| SWAGAT VILLAGE NAYAN INFRASTRUCTURE | Active | 29 Oct 2027 | 30 Jun 2023 | 1 |
| A Z LANDMARK A Z REALTY | Active | 30 Oct 2027 | 30 Jun 2023 | 0 |
| BLISS SOLITAIRE APARTMENT AHAMEDSHARIEF LALUSAHEB SAYED | Active | 30 Oct 2027 | 31 Mar 2026 | 0 |
| GREEN VALLEY ICON DEVELOPERS | Active | 30 Oct 2027 | 31 Mar 2026 | 0 |
| SUKOON RESIDENCY RIFAA STRUCTURAL SOLUTIONS PRIVATE LIMITED | Active | 30 Oct 2027 | 30 Jun 2027 | 0 |
| TULSI NISARG PRISTINE GROUP | Active | 30 Oct 2027 | 30 Jun 2021 | 3 |
241 more projects
- VARDHAMAN VATIKA · 30 Oct 2027
- ABIDA MANSION · 30 Nov 2027
- BRAMHA HERITAGE · 31 Dec 2027
- SAI MORESHWAR · 31 Dec 2027
- KOHINOOR RESIDENCY · 30 Jan 2028
- Kohinoor Plaza · 27 Mar 2028
- UNIVERSAL RESIDENCY · 20 Apr 2028
- A S RESIDENCY · 30 Apr 2028
- Ajmera Complex · 30 Apr 2028
- AMBER NIRVANA · 30 Apr 2028
- ANAND VILLA · 30 Apr 2028
- APPLE CROWN · 30 Apr 2028
- HILL VIEW · 30 Apr 2028
- Kalista · 30 Apr 2028
- LABDHI GARDENS PHASE 10 · 30 Apr 2028
- LABDHI GARDENS PHASE 11 · 30 Apr 2028
- LABDHI GARDENS PHASE 9 · 30 Apr 2028
- LABDHI UMANG · 30 Apr 2028
- Mushtaq Complex · 30 Apr 2028
- Olympeo Neo City · 30 Apr 2028
- Sara Heights · 30 Apr 2028
- Shivamrut Plaza · 30 Apr 2028
- SHRI MORESHWAR APARTMENT · 30 Apr 2028
- Swami Darshan · 30 Apr 2028
- SWAMI PRATIMA · 30 Apr 2028
- Vatsalya Apartment · 30 Apr 2028
- BAUG-E-ZAINAB · 26 Jun 2028
- DEEPJYOTI CITY · 31 Jul 2028
- VANSH HEIGHTS · 31 Jul 2028
- RONAK AVENUE · 30 Sep 2028
- SHREE SWAMI MOUNTVIEW · 23 Oct 2028
- Green City Phase 1 · 30 Oct 2028
- ARENA ONE · 31 Dec 2028
- Madina Complex Building No 3 and 4 · 31 Dec 2028
- Manaya Residency · 31 Dec 2028
- Om Signature · 31 Dec 2028
- Miracle Heights · 30 Jan 2029
- SONU SHREE BALAJI · 8 Feb 2029
- HALIMA PLANET · 28 Feb 2029
- ARYA RESIDENCY P1 · 31 Mar 2029
- Ammara Heights · 30 Apr 2029
- BELLA VISTA · 30 Apr 2029
- DIVINE CAPITAL WING NO B · 30 Apr 2029
- Madina Complex Phase-2 · 30 Apr 2029
- Olympeo Riverside - Phase 3 · 30 Apr 2029
- PALTE PARADISE · 30 Apr 2029
- Rajkumari Apartment · 30 Apr 2029
- RENAISSANCE ROYAL PHASE II · 30 Apr 2029
- Sai Darshan · 30 Apr 2029
- Tulsi Vedant · 30 Apr 2029
- Vrushti Palacio · 30 Apr 2029
- Zara Hills · 30 Apr 2029
- SARVODAY NAGAR · 31 May 2029
- PRAKASH COMPLEX · 31 Jul 2029
- GAGANGIRI PARK · 30 Aug 2029
- ForeverLand · 30 Oct 2029
- Globe Fantasiaa Emerald · 31 Dec 2029
- PLANET ICON · 30 Jan 2030
- Sunrise Arcade · 1 Apr 2030
- Ashtavinayak Complex · 30 Apr 2030
- ASMA TOWER · 30 Apr 2030
- Globe Fantasiaa Aurelia · 30 Apr 2030
- Maryam Complex · 30 Apr 2030
- Rahman Complex · 30 Apr 2030
- Tanzanite · 30 Apr 2030
- Virat Greenwoods Wing B & D · 30 Apr 2030
- VEDANT COMPLEX · 31 Jul 2030
- Saroj Serenity · 30 Oct 2030
- Shiv Srushti Park Complex - Phase II · 31 Dec 2030
- Mount City · 30 Mar 2031
- FLORENCE LANDMARK PHASE - 3 · 30 Apr 2031
- FLORENCE LANDMARK PHASE 2 · 30 Apr 2031
- GALAXY GARDEN PLOT - 3 · 30 Apr 2031
- MUNAF COMPLEX · 30 Apr 2031
- SHREE BALAJI TOWER · 30 Apr 2031
- Tower A Mercury, Venus · 30 Apr 2031
- Tower B-Jupiter, Neptune · 30 Apr 2031
- TOWER C-MARS,PLUTO · 30 Apr 2031
- KRISHNA PARADISE PHASE II · 30 Nov 2031
- MECCA AVENUE · 31 Dec 2031
- SIGNATURE PHASE 1 · 31 Dec 2031
- Vrindavan Homes Phase 3 · 30 Apr 2032
- GALAXY VRUNDAVAN · 30 Apr 2033
- THE DESTINATION · 31 Jul 2035
- Shubharambh Gardens · completed
- Shree G Square · completed
- 5P ARIA · completed
- SAI CHINTAMANI · completed
- SUNRISE RESIDENCY · completed
- TULJA ELITE · completed
- DWARIKA VALLEY PHASE I · completed
- GREEN PALMS · completed
- Cluster C · completed
- A Z RESIDENCY · completed
- SAI RESIDENCY · completed
- SHRI VARADVINAYAK APARTMENT · completed
- STUDIO HIGH 5 Phase 2 · completed
- SAGAR PLAZA · completed
- SAI GANESH APARTMENT · completed
- SQUARE PLANET · completed
- SUNSHINE RESIDENCY · completed
- Tulsi Centre Point · completed
- MORYA VILLA · completed
- SAI PALACE · completed
- Alpine Heritage · completed
- Space Gold Crest · completed
- LAXMI CASTELLO PHASE-II, B1, A-WING, B2, B-WING · completed
- NISARG · completed
- SAI SHRADDHA · completed
- SURYA GALAXY PHASE I · completed
- ROYAL PARADISE · completed
- AARADHYA · completed
- DWARIKA VALLEY PHASE II · completed
- Garden View Residency · completed
- jewel heaven phase 1 · completed
- LAXMI ORCHID · completed
- MATRU CHHAYA · completed
- Royal Residency · completed
- S V BUILDERS · completed
- SAI AAWAS · completed
- SHREE SAMARTH AVENUE · completed
- SHREE SAMARTH ENCLAVE · completed
- THE GREEN ORCHID - PHASE I · completed
- TRISHUL APARTMENT · completed
- VASTU KALASH · completed
- AVIVA APARTMENT · completed
- ONE KIYO PHASE-I · completed
- ORCHID PARK · completed
- KAILASH APARTMENT · completed
- VRINDAVAN RESIDENCY · completed
- Vivoli A-Wing · completed
- Durgeshwari Apartment · completed
- AL-BAQI · completed
- Shreeji Aura · completed
- SUNNY HOMES · completed
- UNITY IKON · completed
- HIMALAYA GARDENS · completed
- SWAMI AASHRAY · completed
- EMARAT VIEW · completed
- Shree G Funzone · completed
- STAR CITY · completed
- Zehra Residency · completed
- PETHKAR APARTMENT · completed
- NOBLE HEIGHTS · completed
- HILL SIDE RESIDENCY A WING · completed
- Studio High 5 Phase 3 Wing E Luxe · completed
- LAXMI KIRAN · completed
- SHAMBHO HOMES · completed
- SHREE SAI MANGAL APARTMENT · completed
- ESHAL TOWER · completed
- SHREE HINGAD CHANDRA · completed
- SHREE SAI TOWERS · completed
- AMBER HERITAGE · completed
- SHREE SADGURU RESIDENCY - 2 · completed
- Studio High 5 Phase 3 Wing F · completed
- CROWN C · completed
- Olympeo Retreat - Phase 1 · completed
- ROYAL HERITAGE · completed
- SUNDARAM COMPLEX · completed
- VRUSHTI KAMAL · completed
- GOKULDHAM · completed
- KUMKUM CORNER · completed
- UNITY HOMES · completed
- VRUSHTI PRIDE · completed
- SAI KRUPA VALLEY- PHASE 1 · completed
- MIRA RESIDENCY · completed
- LABDHI GARDENS PHASE 8 · completed
- BURHAN HEIGHTS · completed
- SHREE SAMARTH PARADISE · completed
- DIVINE CAPITAL · completed
- DRISHTI ARCADE · 31 Dec 2019
- Aarambh Residency C1 D1 · 6 Nov 2020
- SAI SAGAR · 30 Nov 2020
- DIVINE PATH · 30 Oct 2021
- SIDDHIVINAYAK PALACE · 30 Dec 2021
- MAHALAXMI ENCLAVE · 30 Mar 2022
- DECENT APARTMENT · 4 Apr 2022
- SKYLAND RESIDENCY · 30 May 2022
- DAMODAR VISHNU SHENAI · 30 Dec 2022
- SUNRISE APARTMENT · 30 Dec 2022
- SHIV JEEVAN APARTMENT · 30 Mar 2023
- Meenarch Apartment · 31 Mar 2023
- KASTURI VILLA · 30 May 2023
- Gokul Dham · 30 Jun 2023
- GREEN FIELD · 30 Jun 2023
- MONARCH PARADISE · 30 Jun 2023
- MONARCH RESIDENCY · 30 Jun 2023
- BLISS RESIDENCY · 30 Dec 2023
- DIAMOND PLAZA · 30 Dec 2023
- Suzain Appartment · 30 Dec 2023
- PUSHKAR APARTMENT · 1 Feb 2024
- SHREE SAMARTH APARTMENT · 30 Mar 2024
- SHREE BAA NIWAS · 29 Jun 2024
- LAXMI ICON · 30 Jun 2024
- Mahalaxmi Darshan · 30 Jun 2024
- RAJ HEIGHT · 30 Jun 2024
- TULSI CENTRE POINT · 31 Jul 2024
- ALEEZA ORCHID · 30 Sep 2024
- THE GREEN ORCHID PHASE II · 30 Dec 2024
- Virat Greenwoods Wing E · 30 Dec 2024
- DREAMS PARK - DAISY · 31 Dec 2024
- SHARDA SADAN APARTMENT · 31 Dec 2024
- THE MORNING · 31 Dec 2024
- SWASTIK HOMES · 3 Mar 2025
- S.P SHRAVANDHARA APARTMENT · 10 Mar 2025
- SHRUSTI VAN · 30 Mar 2025
- KULSWAMINI APARTMENT · 31 Mar 2025
- Moonstone · 31 Mar 2025
- PARDESHI PLAZA · 31 Mar 2025
- SR PLAZA · 15 Apr 2025
- GAGANGIRI COMPLEX · 31 May 2025
- GURU KRUPA APARTMENT · 30 Jun 2025
- KUBER DARSHAN · 30 Jun 2025
- ABODE APARTMENT · 30 Sep 2025
- ANAMIKA HEIGHTS · 2 Oct 2025
- AVNIT PLAZA · 31 Oct 2025
- TWIN TOWERS · 25 Dec 2025
- RIDDHI SIDDHI APARTMENT · 30 Dec 2025
- SAI ENRICH HILLS · 30 Dec 2025
- BALAJI RESIDENCY · 31 Dec 2025
- DESHMUKH ARCADE · 31 Dec 2025
- PLANET HIGHLANDS · 31 Dec 2025
- SAI DHAM · 31 Dec 2025
- SPACE WORLD BUILDING NO 2 A WING · 31 Dec 2025
- SPACE WORLD BUILDING NO 2 B WING · 31 Dec 2025
- SPACE WORLD BUILDING NO 2 C WING · 31 Dec 2025
- VANDE MATARAM DIVINE · 31 Dec 2025
- ZEHRA MANSION · 31 Dec 2025
- SADAF RESIDENCY · 19 May 2026
- Golden Van · 28 Jun 2026
- BALAJI KRUPA · 30 Jun 2026
- Chitrapatjanak Dadasaheb Phalke Township - Phase 1 · 30 Jun 2026
- SKY HOMES · 30 Jun 2026
- KAILASH COMPLEX PHASE 1 · 31 Jul 2026
- Pranill Shree Ganesha · 31 Jul 2026
- NOBLE APARTMENT · 30 Aug 2026
- ABHISHEK FLORIDA- SUNFLOWER, ROSE, JASMINE · —
- LABDHI GARDENS PHASE 4 · —
- Spsaichatra · —
- VIJAY ESTATE VAKAS PHASE - 1 · —
- VISION AARAMBH · —
Other areas in Raigad
- Panvel · 2,293
- Taloja · 273
- Karjat · 260
- Shilphata · 168
- Dronagiri · 167
- Kharghar · 157
- Pen · 110
- Panvel · 101
- Alibag · 94
- Mahad · 74
- Kalamboli · 67
- Roha · 56
Data compiled by GharKundli (gharkundli.com) from MahaRERA public records. Projects are grouped by the pincode filed on MahaRERA.