MahaRERA projects in Neral, Raigad (410101)

According to GharKundli's check of MahaRERA records, 291 housing projects are registered in pincode 410101 (Neral, Raigad). 134 are still being built, 54 with possession due by the end of 2027. For 197, the completion date on MahaRERA is later than the one first promised. 26 have at least one complaint filed on MahaRERA.

Pincode 410101 also covers: Mamdapur, Karjat, Dhamote, Bopele, Labdhi Gardens, Pashane.

“Possession due” is the latest completion date the builder has filed on MahaRERA; “first promised” is the date given at registration. Open a project for its full MahaRERA record.

ProjectMahaRERA statusPossession due (MahaRERA)First promisedComplaints
Panvelkar Swarajya Phase-I
Panvelkar Infrastructures Private Limited
De-registered30 Dec 2021passed31 Dec 20190
IMPERIAL
FORTUNE INFRA DEVELOPERS
Abeyance12 Feb 2024passedsame0
GLOBE FANTASIAA - MOONSTONE
GLOBE INDIA INFRA
Abeyance31 Dec 2026same0
GLOBE FANTASIAA- CELESTIA
GLOBE INDIA INFRA
Active31 Dec 2026same0
IRA APARTMENT
PRASHANT PRAKASH SAWANT
Active31 Dec 2026same0
Madina Complex
Al-Hamd Developers
Active31 Dec 202631 Aug 20263
Renaissance Royal Phase 1
Shree Sharada Infrastructures
Active31 Dec 202630 Dec 20240
VAASTU SANKALP
VAASTU ENTEPRISES
Active31 Dec 202630 Jun 20240
ARSH APARTMENT
MATEEN RAFIQUE PATEL
Active30 Jan 202730 Jun 20250
NAAZ PLAZA
PRESTIGE REALITY
Active30 Jan 202730 Jun 20250
HIMALAYA GARDENS
HIMALAYA BUILDERS AND DEVELOPERS LLP
Active31 Mar 20271 Oct 20240
ALIZA APARTMENTS
M/S SKY HOMES
Active15 Apr 202715 Dec 20260
AARSH RESIDENCY
SHUBHAM ENTERPRISES
Active30 Apr 202730 Dec 20230
ANAND PARK
NARENDRA SOPAN DAHITANKAR
Active30 Apr 202731 Oct 20190
Bellim Residency
Mohd Khalid Mohd Iqbal Shaikh
Active30 Apr 202731 Dec 20260
Cluster A
Shibam Associates
Active30 Apr 20279 Dec 20230
DHRUV RESIDENCY PLATINUM
KAMLESH DEVIDAS DHRUV
Active30 Apr 202731 Dec 20250
ELCARIM ENCLAVE
ELCARIM DEVELOPERS AND PROPERTIES PRIVATE LIMITED
Active30 Apr 202731 Dec 20260
ELITE HOUSE
FORTUNE INFRA DEVELOPERS
Active30 Apr 202712 Feb 20240
FLORENCE LANDMARK PHASE 1
PALAK DEVELOPERS
Active30 Apr 202731 Dec 20260
FRIENDS ARCADE
FRIENDS DEVELOPERS
Active30 Apr 202730 Dec 20230
LABDHI GARDENS PHASE 6
Labdhi Lifestyle Limited
Active30 Apr 202730 Dec 20260
LABDHI GARDENS PHASE 7
Labdhi Lifestyle Limited
Active30 Apr 202730 Dec 20260
MULLA RESIDENCY
Zafar Mohd Rashid Mulla
Active30 Apr 202731 Dec 20260
NIKHIL PARK
GURUDEV DEVELOPERS
Active30 Apr 202731 Dec 20260
Olympeo Retreat - Phase 2
PARADISO REALTY SOLUTIONS LLP
Active30 Apr 202731 Dec 20260
PRAARAMBH SADANIKA
S.B. REALTORS
Active30 Apr 202731 Dec 20250
SHALIMAR GALAXY
MOHAMMED SALIM AKBAR HUSSAIN SHAIKH
Active30 Apr 202731 Dec 20190
SUNNY HOUSING
KIRAN DILIP CHAVAN
Active30 Apr 202731 Dec 20260
SWAMI KIMAYA
GALAXY ENTERPRISES
Active30 Apr 202730 Dec 20210
SWAMI MAHIMA
Shree Samarth Developers
Active30 Apr 202731 Dec 20243
Swami Sadan
Anil Baburao Achrekar
Active30 Apr 202731 Dec 20250
THE GREEN ORCHID PHASE III
SHAKTI DEVELOPERS
Active30 Apr 202730 Dec 20260
ZAINAB HEIGHTS
SHALIN DEVELOPERS
Active30 Apr 202731 Dec 20260
SHREE SAI SHAMBU
SAMEER LALCHAND MHATRE
Active31 May 2027same0
Shree Parshwanath Residency
OM SAI CONSTRUCTION
Active9 Jun 20279 Feb 20270
HARSHITA APARTMENT
PRASHANT PRAKASH SAWANT
Active28 Jun 202728 Feb 20270
SWAMI AASHRAY
STRUCTURA REALTY
Active30 Jun 202730 Jun 20260
ALIYA PARK
UNITY CONSTRUCTION
Active31 Jul 202731 Dec 20230
ANAND AARADHYA
AARADHYA DEVELOPERS
Active31 Jul 202731 Mar 20270
KAILASH COMPLEX PHASE 2
BRAMHA CONSTRUCTIONS
Active31 Jul 202731 Mar 20270
MALHAR HEIGHTS
MALHAR ENTERPRISES
Active31 Jul 202730 Mar 20230
Shanti Lake View
Padmavati Developers
Active31 Jul 202731 Mar 20270
SUZAIN PLAZA
S N DEVELOPERS
Active31 Jul 202731 Dec 20250
SWAGAT VILLAGE
NAYAN INFRASTRUCTURE
Active29 Oct 202730 Jun 20231
A Z LANDMARK
A Z REALTY
Active30 Oct 202730 Jun 20230
BLISS SOLITAIRE APARTMENT
AHAMEDSHARIEF LALUSAHEB SAYED
Active30 Oct 202731 Mar 20260
GREEN VALLEY
ICON DEVELOPERS
Active30 Oct 202731 Mar 20260
SUKOON RESIDENCY
RIFAA STRUCTURAL SOLUTIONS PRIVATE LIMITED
Active30 Oct 202730 Jun 20270
TULSI NISARG
PRISTINE GROUP
Active30 Oct 202730 Jun 20213

241 more projects

  1. VARDHAMAN VATIKA · 30 Oct 2027
  2. ABIDA MANSION · 30 Nov 2027
  3. BRAMHA HERITAGE · 31 Dec 2027
  4. SAI MORESHWAR · 31 Dec 2027
  5. KOHINOOR RESIDENCY · 30 Jan 2028
  6. Kohinoor Plaza · 27 Mar 2028
  7. UNIVERSAL RESIDENCY · 20 Apr 2028
  8. A S RESIDENCY · 30 Apr 2028
  9. Ajmera Complex · 30 Apr 2028
  10. AMBER NIRVANA · 30 Apr 2028
  11. ANAND VILLA · 30 Apr 2028
  12. APPLE CROWN · 30 Apr 2028
  13. HILL VIEW · 30 Apr 2028
  14. Kalista · 30 Apr 2028
  15. LABDHI GARDENS PHASE 10 · 30 Apr 2028
  16. LABDHI GARDENS PHASE 11 · 30 Apr 2028
  17. LABDHI GARDENS PHASE 9 · 30 Apr 2028
  18. LABDHI UMANG · 30 Apr 2028
  19. Mushtaq Complex · 30 Apr 2028
  20. Olympeo Neo City · 30 Apr 2028
  21. Sara Heights · 30 Apr 2028
  22. Shivamrut Plaza · 30 Apr 2028
  23. SHRI MORESHWAR APARTMENT · 30 Apr 2028
  24. Swami Darshan · 30 Apr 2028
  25. SWAMI PRATIMA · 30 Apr 2028
  26. Vatsalya Apartment · 30 Apr 2028
  27. BAUG-E-ZAINAB · 26 Jun 2028
  28. DEEPJYOTI CITY · 31 Jul 2028
  29. VANSH HEIGHTS · 31 Jul 2028
  30. RONAK AVENUE · 30 Sep 2028
  31. SHREE SWAMI MOUNTVIEW · 23 Oct 2028
  32. Green City Phase 1 · 30 Oct 2028
  33. ARENA ONE · 31 Dec 2028
  34. Madina Complex Building No 3 and 4 · 31 Dec 2028
  35. Manaya Residency · 31 Dec 2028
  36. Om Signature · 31 Dec 2028
  37. Miracle Heights · 30 Jan 2029
  38. SONU SHREE BALAJI · 8 Feb 2029
  39. HALIMA PLANET · 28 Feb 2029
  40. ARYA RESIDENCY P1 · 31 Mar 2029
  41. Ammara Heights · 30 Apr 2029
  42. BELLA VISTA · 30 Apr 2029
  43. DIVINE CAPITAL WING NO B · 30 Apr 2029
  44. Madina Complex Phase-2 · 30 Apr 2029
  45. Olympeo Riverside - Phase 3 · 30 Apr 2029
  46. PALTE PARADISE · 30 Apr 2029
  47. Rajkumari Apartment · 30 Apr 2029
  48. RENAISSANCE ROYAL PHASE II · 30 Apr 2029
  49. Sai Darshan · 30 Apr 2029
  50. Tulsi Vedant · 30 Apr 2029
  51. Vrushti Palacio · 30 Apr 2029
  52. Zara Hills · 30 Apr 2029
  53. SARVODAY NAGAR · 31 May 2029
  54. PRAKASH COMPLEX · 31 Jul 2029
  55. GAGANGIRI PARK · 30 Aug 2029
  56. ForeverLand · 30 Oct 2029
  57. Globe Fantasiaa Emerald · 31 Dec 2029
  58. PLANET ICON · 30 Jan 2030
  59. Sunrise Arcade · 1 Apr 2030
  60. Ashtavinayak Complex · 30 Apr 2030
  61. ASMA TOWER · 30 Apr 2030
  62. Globe Fantasiaa Aurelia · 30 Apr 2030
  63. Maryam Complex · 30 Apr 2030
  64. Rahman Complex · 30 Apr 2030
  65. Tanzanite · 30 Apr 2030
  66. Virat Greenwoods Wing B & D · 30 Apr 2030
  67. VEDANT COMPLEX · 31 Jul 2030
  68. Saroj Serenity · 30 Oct 2030
  69. Shiv Srushti Park Complex - Phase II · 31 Dec 2030
  70. Mount City · 30 Mar 2031
  71. FLORENCE LANDMARK PHASE - 3 · 30 Apr 2031
  72. FLORENCE LANDMARK PHASE 2 · 30 Apr 2031
  73. GALAXY GARDEN PLOT - 3 · 30 Apr 2031
  74. MUNAF COMPLEX · 30 Apr 2031
  75. SHREE BALAJI TOWER · 30 Apr 2031
  76. Tower A Mercury, Venus · 30 Apr 2031
  77. Tower B-Jupiter, Neptune · 30 Apr 2031
  78. TOWER C-MARS,PLUTO · 30 Apr 2031
  79. KRISHNA PARADISE PHASE II · 30 Nov 2031
  80. MECCA AVENUE · 31 Dec 2031
  81. SIGNATURE PHASE 1 · 31 Dec 2031
  82. Vrindavan Homes Phase 3 · 30 Apr 2032
  83. GALAXY VRUNDAVAN · 30 Apr 2033
  84. THE DESTINATION · 31 Jul 2035
  85. Shubharambh Gardens · completed
  86. Shree G Square · completed
  87. 5P ARIA · completed
  88. SAI CHINTAMANI · completed
  89. SUNRISE RESIDENCY · completed
  90. TULJA ELITE · completed
  91. DWARIKA VALLEY PHASE I · completed
  92. GREEN PALMS · completed
  93. Cluster C · completed
  94. A Z RESIDENCY · completed
  95. SAI RESIDENCY · completed
  96. SHRI VARADVINAYAK APARTMENT · completed
  97. STUDIO HIGH 5 Phase 2 · completed
  98. SAGAR PLAZA · completed
  99. SAI GANESH APARTMENT · completed
  100. SQUARE PLANET · completed
  101. SUNSHINE RESIDENCY · completed
  102. Tulsi Centre Point · completed
  103. MORYA VILLA · completed
  104. SAI PALACE · completed
  105. Alpine Heritage · completed
  106. Space Gold Crest · completed
  107. LAXMI CASTELLO PHASE-II, B1, A-WING, B2, B-WING · completed
  108. NISARG · completed
  109. SAI SHRADDHA · completed
  110. SURYA GALAXY PHASE I · completed
  111. ROYAL PARADISE · completed
  112. AARADHYA · completed
  113. DWARIKA VALLEY PHASE II · completed
  114. Garden View Residency · completed
  115. jewel heaven phase 1 · completed
  116. LAXMI ORCHID · completed
  117. MATRU CHHAYA · completed
  118. Royal Residency · completed
  119. S V BUILDERS · completed
  120. SAI AAWAS · completed
  121. SHREE SAMARTH AVENUE · completed
  122. SHREE SAMARTH ENCLAVE · completed
  123. THE GREEN ORCHID - PHASE I · completed
  124. TRISHUL APARTMENT · completed
  125. VASTU KALASH · completed
  126. AVIVA APARTMENT · completed
  127. ONE KIYO PHASE-I · completed
  128. ORCHID PARK · completed
  129. KAILASH APARTMENT · completed
  130. VRINDAVAN RESIDENCY · completed
  131. Vivoli A-Wing · completed
  132. Durgeshwari Apartment · completed
  133. AL-BAQI · completed
  134. Shreeji Aura · completed
  135. SUNNY HOMES · completed
  136. UNITY IKON · completed
  137. HIMALAYA GARDENS · completed
  138. SWAMI AASHRAY · completed
  139. EMARAT VIEW · completed
  140. Shree G Funzone · completed
  141. STAR CITY · completed
  142. Zehra Residency · completed
  143. PETHKAR APARTMENT · completed
  144. NOBLE HEIGHTS · completed
  145. HILL SIDE RESIDENCY A WING · completed
  146. Studio High 5 Phase 3 Wing E Luxe · completed
  147. LAXMI KIRAN · completed
  148. SHAMBHO HOMES · completed
  149. SHREE SAI MANGAL APARTMENT · completed
  150. ESHAL TOWER · completed
  151. SHREE HINGAD CHANDRA · completed
  152. SHREE SAI TOWERS · completed
  153. AMBER HERITAGE · completed
  154. SHREE SADGURU RESIDENCY - 2 · completed
  155. Studio High 5 Phase 3 Wing F · completed
  156. CROWN C · completed
  157. Olympeo Retreat - Phase 1 · completed
  158. ROYAL HERITAGE · completed
  159. SUNDARAM COMPLEX · completed
  160. VRUSHTI KAMAL · completed
  161. GOKULDHAM · completed
  162. KUMKUM CORNER · completed
  163. UNITY HOMES · completed
  164. VRUSHTI PRIDE · completed
  165. SAI KRUPA VALLEY- PHASE 1 · completed
  166. MIRA RESIDENCY · completed
  167. LABDHI GARDENS PHASE 8 · completed
  168. BURHAN HEIGHTS · completed
  169. SHREE SAMARTH PARADISE · completed
  170. DIVINE CAPITAL · completed
  171. DRISHTI ARCADE · 31 Dec 2019
  172. Aarambh Residency C1 D1 · 6 Nov 2020
  173. SAI SAGAR · 30 Nov 2020
  174. DIVINE PATH · 30 Oct 2021
  175. SIDDHIVINAYAK PALACE · 30 Dec 2021
  176. MAHALAXMI ENCLAVE · 30 Mar 2022
  177. DECENT APARTMENT · 4 Apr 2022
  178. SKYLAND RESIDENCY · 30 May 2022
  179. DAMODAR VISHNU SHENAI · 30 Dec 2022
  180. SUNRISE APARTMENT · 30 Dec 2022
  181. SHIV JEEVAN APARTMENT · 30 Mar 2023
  182. Meenarch Apartment · 31 Mar 2023
  183. KASTURI VILLA · 30 May 2023
  184. Gokul Dham · 30 Jun 2023
  185. GREEN FIELD · 30 Jun 2023
  186. MONARCH PARADISE · 30 Jun 2023
  187. MONARCH RESIDENCY · 30 Jun 2023
  188. BLISS RESIDENCY · 30 Dec 2023
  189. DIAMOND PLAZA · 30 Dec 2023
  190. Suzain Appartment · 30 Dec 2023
  191. PUSHKAR APARTMENT · 1 Feb 2024
  192. SHREE SAMARTH APARTMENT · 30 Mar 2024
  193. SHREE BAA NIWAS · 29 Jun 2024
  194. LAXMI ICON · 30 Jun 2024
  195. Mahalaxmi Darshan · 30 Jun 2024
  196. RAJ HEIGHT · 30 Jun 2024
  197. TULSI CENTRE POINT · 31 Jul 2024
  198. ALEEZA ORCHID · 30 Sep 2024
  199. THE GREEN ORCHID PHASE II · 30 Dec 2024
  200. Virat Greenwoods Wing E · 30 Dec 2024
  201. DREAMS PARK - DAISY · 31 Dec 2024
  202. SHARDA SADAN APARTMENT · 31 Dec 2024
  203. THE MORNING · 31 Dec 2024
  204. SWASTIK HOMES · 3 Mar 2025
  205. S.P SHRAVANDHARA APARTMENT · 10 Mar 2025
  206. SHRUSTI VAN · 30 Mar 2025
  207. KULSWAMINI APARTMENT · 31 Mar 2025
  208. Moonstone · 31 Mar 2025
  209. PARDESHI PLAZA · 31 Mar 2025
  210. SR PLAZA · 15 Apr 2025
  211. GAGANGIRI COMPLEX · 31 May 2025
  212. GURU KRUPA APARTMENT · 30 Jun 2025
  213. KUBER DARSHAN · 30 Jun 2025
  214. ABODE APARTMENT · 30 Sep 2025
  215. ANAMIKA HEIGHTS · 2 Oct 2025
  216. AVNIT PLAZA · 31 Oct 2025
  217. TWIN TOWERS · 25 Dec 2025
  218. RIDDHI SIDDHI APARTMENT · 30 Dec 2025
  219. SAI ENRICH HILLS · 30 Dec 2025
  220. BALAJI RESIDENCY · 31 Dec 2025
  221. DESHMUKH ARCADE · 31 Dec 2025
  222. PLANET HIGHLANDS · 31 Dec 2025
  223. SAI DHAM · 31 Dec 2025
  224. SPACE WORLD BUILDING NO 2 A WING · 31 Dec 2025
  225. SPACE WORLD BUILDING NO 2 B WING · 31 Dec 2025
  226. SPACE WORLD BUILDING NO 2 C WING · 31 Dec 2025
  227. VANDE MATARAM DIVINE · 31 Dec 2025
  228. ZEHRA MANSION · 31 Dec 2025
  229. SADAF RESIDENCY · 19 May 2026
  230. Golden Van · 28 Jun 2026
  231. BALAJI KRUPA · 30 Jun 2026
  232. Chitrapatjanak Dadasaheb Phalke Township - Phase 1 · 30 Jun 2026
  233. SKY HOMES · 30 Jun 2026
  234. KAILASH COMPLEX PHASE 1 · 31 Jul 2026
  235. Pranill Shree Ganesha · 31 Jul 2026
  236. NOBLE APARTMENT · 30 Aug 2026
  237. ABHISHEK FLORIDA- SUNFLOWER, ROSE, JASMINE · —
  238. LABDHI GARDENS PHASE 4 · —
  239. Spsaichatra · —
  240. VIJAY ESTATE VAKAS PHASE - 1 · —
  241. VISION AARAMBH · —

Other areas in Raigad

All areas in Raigad →

Data compiled by GharKundli (gharkundli.com) from MahaRERA public records. Projects are grouped by the pincode filed on MahaRERA.