MahaRERA projects in Malad West, Mumbai Suburban (400064)
According to GharKundli's check of MahaRERA records, 256 housing projects are registered in pincode 400064 (Malad West, Mumbai Suburban). 135 are still being built, 57 with possession due by the end of 2027. For 170, the completion date on MahaRERA is later than the one first promised. 78 have at least one complaint filed on MahaRERA.
Pincode 400064 also covers: Malad, Borivali, Malad East, Valnai, Malad North, Worli.
“Possession due” is the latest completion date the builder has filed on MahaRERA; “first promised” is the date given at registration. Open a project for its full MahaRERA record.
| Project | MahaRERA status | Possession due (MahaRERA) | First promised | Complaints |
|---|---|---|---|---|
| AKASH CHSL HAMMAD SADIQ KHAN | Active | 23 Oct 2026passed | 23 Jun 2026 | 0 |
| SHREE SANTOSH APPARTMENT BHARAT NAVINCHANDRA GALA | Active | 30 Oct 2026passed | 31 Dec 2018 | 4 |
| SHREYA BHARAT NAVINCHANDRA GALA | Active | 30 Oct 2026passed | 31 Dec 2018 | 1 |
| AABIEL AVENUE RIGHT CHANNEL CONSTRUCTION PVT LTD | Active | 31 Oct 2026passed | 31 Dec 2019 | 0 |
| RAJINFINIA PHASE II WING A WING B WING C RAJSANKET REALTY LIMITED | Active | 28 Dec 2026 | 30 Dec 2023 | 42 |
| CENTRICO CRESCENT AMITY REALTORS PVT.LTD | Active | 31 Dec 2026 | 30 Dec 2023 | 13 |
| MALAD SUKH SADAN CHSL FERRO BUILD | Active | 31 Dec 2026 | 31 Dec 2025 | 0 |
| Pratap Oasis JPV Realtors Private Limited | Active | 31 Dec 2026 | 30 Dec 2023 | 2 |
| RAMDEV VEERAL HEIGHTS RAMDEV ASSOCIATES | Active | 31 Dec 2026 | 1 Jun 2025 | 0 |
| Rite Amor Rite Pragati Developers | Active | 31 Dec 2026 | 31 Aug 2023 | 0 |
| Samarth Reva Samarth Erectors and Developers - Mariyamman | Active | 31 Dec 2026 | 31 Dec 2025 | 0 |
| RAJGOPAL BUILDING HARMONY AND PROSPERITY DEVELOPER | Active | 9 Jan 2027 | 9 Sep 2026 | 0 |
| Malad Sati Darshan CHS Ltd. Goyal Sati Darshan LLP | Active | 11 Jan 2027 | 31 May 2026 | 0 |
| REDEVELOPMENT OF UNION BANK OF INDIA EMPLOYEES ANKUR CHSL PRANAV CONSTRUCTIONS LIMITED | Active | 3 Feb 2027 | same | 0 |
| ALLIANCE ABHIMANYU ALLIANCE CITY DEVELOPERS REALTORS PVT LTD | Active | 28 Feb 2027 | same | 0 |
| Modispaces Amizarna Modispaces Real Estate Pvt Ltd | Active | 30 Mar 2027 | 10 Dec 2025 | 0 |
| PRABHU PLAZA M/S UNITED HOUSING CORPORATION | Active | 30 Mar 2027 | 30 Jun 2026 | 1 |
| MILAN MANDIR NX MILAN LIFE SPACES LLP | Active | 31 Mar 2027 | same | 1 |
| AVIRAHI ELEGANCE ABHIGNA ENTERPRISES | Active | 10 Apr 2027 | 30 Sep 2024 | 0 |
| Bhagat Grandeur Chirag Agro Fins Private Limited | Active | 29 Apr 2027 | 31 Dec 2018 | 1 |
| AADITYA PLAZA JET BUILD DEVELOPERS(MUMBAI) | Active | 30 Apr 2027 | 31 Dec 2018 | 1 |
| ADHRIT MUNDARA DEVELOPERS | Active | 30 Apr 2027 | 30 Oct 2023 | 6 |
| GEETANJALI PARADISE VASUNDHARA DEVELOCUS LLP | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| HARSHAIL HORNBILL APARTMENT ROSEFINCH DEVELOPERS LLP | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| JAYMALA SADAN CHSL SWAANAND BUILDERS AND CONTRACTORS | Active | 30 Apr 2027 | 31 Dec 2026 | 1 |
| LIBERTY HEIGHTS VP CASA CONSTRUCTIONS LLP | Active | 30 Apr 2027 | 30 Dec 2026 | 0 |
| LOVELY CHS. LTD., JINAM REALTORS | Active | 30 Apr 2027 | 30 Dec 2024 | 1 |
| PEARL GARDENS SHIV ENTERPRISES | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| POLO MATRIX Polo Infra Developers Private Limited | Active | 30 Apr 2027 | 31 Dec 2025 | 0 |
| RISHAB LAXMI ADITI DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Runwal Nexus Asmira Ventures Private Limited | Active | 30 Apr 2027 | 30 Dec 2026 | 2 |
| SANGHVI JEWEL SANGHVI REALTORS | Active | 30 Apr 2027 | 31 Dec 2018 | 1 |
| SHAM NIRMAL HEIGHTS ALTAA BUIILDERS | Active | 30 Apr 2027 | 30 Dec 2022 | 3 |
| SHARANYA M/S SATSANG ENTERPRISES | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| SOLITAIRE SOLITAIRE CONSTRUCTIONS | Active | 30 Apr 2027 | 31 Mar 2019 | 1 |
| THE WEST LIONDALE SKYSCRAPER LLP | Active | 30 Apr 2027 | 31 Dec 2025 | 0 |
| VICTORY DIVINE YASHODANAND REALTORS | Active | 30 Apr 2027 | 30 Sep 2020 | 1 |
| PALACE LIBERTY SERINITY EXQUISITE LLP | Active | 11 May 2027 | 11 May 2026 | 0 |
| LIBERTE64 Jadhwani Infrastructure LLP | Active | 30 May 2027 | 31 Aug 2026 | 0 |
| ACRES ABODE ACRES DEVELOPERS (PROJECT ARJUN) | Active | 28 Jun 2027 | 28 Feb 2027 | 0 |
| Lotus Sky Garden Lotus Logistics and Developers Pvt Ltd | Active | 30 Jun 2027 | 30 Dec 2022 | 3 |
| Navlabh Sambhav Rahul Nagda | Active | 30 Jun 2027 | 30 Sep 2025 | 0 |
| AJMERA ARHAM VISHAL CONSTRUCTION | Active | 31 Jul 2027 | 31 Jul 2026 | 0 |
| Mangal Business Park - Gautam Apartment MANGAL BUILDHOME PRIVATE LIMITED | Active | 31 Jul 2027 | 31 Mar 2027 | 0 |
| Redevelopment of Dadarkar Apartment CHSL Sankalp Structures Private Limited | Active | 31 Jul 2027 | 30 Sep 2023 | 0 |
| RASHMI SIGNATURE Modi's Navnirman Limited | Active | 11 Aug 2027 | same | 0 |
| 63 GOLDMEDAL AVENUE RISHABRAJ ESTATE DEVELOPERS PVT LTD | Active | 30 Sep 2027 | 30 May 2027 | 1 |
| AVIRA JEWELLERY HUB AVIRA REALTY PRIVATE LIMITED | Active | 30 Sep 2027 | same | 0 |
| Kamla Ridhima Kamla Homes & Lifestyles Private Limited | Active | 30 Sep 2027 | 31 May 2027 | 0 |
| SHIV PALACE NAVKARMIK INFRA & DEVELOPMENT PRIVATE LIMITED | Active | 30 Sep 2027 | 31 May 2027 | 0 |
206 more projects
- Mickey Links · 30 Oct 2027
- PARVATI MADHAV BHAVAN · 30 Oct 2027
- SEERon Dyo · 30 Oct 2027
- Shreeji Eternity Wing - A, Shreeji Eternity Wing - B, Shreeji Eternity Wing - C · 30 Oct 2027
- RAJ IMPERIA · 31 Oct 2027
- REDEVELOPMENT OF GLENDON CHSL, SHELDON CHSL, ORLEM LUCIANA CHSL · 2 Nov 2027
- Shreeji Atlantis Wing B · 31 Dec 2027
- AURIS ILARIA TOWER A · 29 Feb 2028
- Santosh Prerna Co-Operative Housing Society Limited · 30 Mar 2028
- VIR PARADISE · 30 Mar 2028
- ADITYA GORASWADI CHSL · 30 Apr 2028
- ADVENT DEEPAK · 30 Apr 2028
- ALFRED SPLENDOUR · 30 Apr 2028
- Aranya The Park · 30 Apr 2028
- ASCEND TOWER · 30 Apr 2028
- Gyan Bhuvan · 30 Apr 2028
- MALAD WEBB · 30 Apr 2028
- METRO MAJESTIC · 30 Apr 2028
- Pratap Liberty One · 30 Apr 2028
- PRIYAM RESIDENCY · 30 Apr 2028
- ROYAL BLISS · 30 Apr 2028
- SADGURU AVIGHNA · 30 Apr 2028
- Shreeji Bliss · 31 May 2028
- Mamtora Embassy · 30 Jun 2028
- REDEVELOPMENT OF KAVERI CHSL · 3 Jul 2028
- NAVKETTAN PUSHPAANGAN · 31 Jul 2028
- THE CURVE · 31 Jul 2028
- AURIS ILARIA TOWER B · 30 Aug 2028
- Annapurna Sadan CHS LTD · 1 Sep 2028
- The Redevelopment of Shree Santoshi Nagar CHSL · 3 Oct 2028
- MARU MANSION · 30 Oct 2028
- RISHAB AANGAN · 30 Oct 2028
- Ruparel Stardom · 30 Oct 2028
- Sahakar Shanti Signature · 30 Oct 2028
- Shreeji Eternity Wing - D · 30 Oct 2028
- Surbhi Apartment · 30 Oct 2028
- AURUM BUSINESS SQUARE · 1 Dec 2028
- RASHMI ICON · 11 Dec 2028
- METRO MARVEL'S · 31 Dec 2028
- SHREEJI NAKSHTRA · 31 Dec 2028
- IRENE WING B PHASE 1 · 28 Feb 2029
- THE REDEVELOPMENT OF JOE HENRIQUES BUNGALOW · 11 Mar 2029
- JUSTIN CO-OP. HSG. SOC. LTD · 31 Mar 2029
- Malad Vrindavan CHSL · 13 Apr 2029
- Aditya Breeze · 30 Apr 2029
- ANCHORPOINT AVIARA · 30 Apr 2029
- Chandak Treesourus · 30 Apr 2029
- Florence Residency · 30 Apr 2029
- JASWANTI SQUARE · 30 Apr 2029
- KANCHAN VILLA CHSL · 30 Apr 2029
- MARQUIS RESIDENCES PHASE 2 · 30 Apr 2029
- MEGHMALA CRYSTA · 30 Apr 2029
- METRO EXCELLENCY · 30 Apr 2029
- Pratap Bhavan · 30 Apr 2029
- Sagar Sarita Co-operative Housing Society LTD · 30 Apr 2029
- TRUSTWORTH MALAD · 30 Apr 2029
- DEEP SHIKHAR · 31 Jul 2029
- Madhusudan Shrine · 31 Jul 2029
- WESTWINDS 64 · 31 Aug 2029
- Christina Apartment CHSL · 30 Oct 2029
- Modirealty Olive · 30 Oct 2029
- Mahindra Marina64 - Phase 1 · 31 Dec 2029
- Narang Vivenda · 31 Dec 2029
- AURIS SERENITY TOWER 4 RESIDENTIAL · 31 Mar 2030
- BHAVANA RESIDENCY · 31 Mar 2030
- ASHTALAKSHMI PARRADISE CHSL · 30 Apr 2030
- CELESTIAL HEIGHTS - PHASE II · 30 Apr 2030
- JDN CORNERSTONE · 30 Apr 2030
- Mahindra Marina64 - Phase 2 · 30 Apr 2030
- NICCO SUNDERMILAN · 30 Apr 2030
- REYANSH INFINITY · 30 Apr 2030
- SHUBH MANGAL SRA CHS (Prop) · 30 Apr 2030
- OUR HOME CHSL · 30 Sep 2030
- Mahindra Marina64 - Phase 3 · 30 Oct 2030
- SHREEJI AMBER · 30 Oct 2030
- SHREEJI TRINITY · 30 Oct 2030
- BUILDING NO 2 AJMERA SHIKHAR · 31 Dec 2030
- Ethics Orovia · 30 Aug 2031
- ARKADE ASCEND · 30 Oct 2031
- BRAHMAND · 30 Apr 2032
- MALAD JEWEL · 30 Apr 2032
- RISHABRAJ CERAMONT · 30 Apr 2032
- Rustomjee Ozone Skye · 30 Apr 2032
- STAROM EKYA · 30 Apr 2032
- Raheja SkyPolis - 1 · 30 Apr 2035
- Lotus Niwas / Satya Niwas · completed
- malad shanti · completed
- Milan Residency · completed
- SHEETAL OM JAY ARADHANA · completed
- AVIRON CLASSIC · completed
- KAPADIA AVENUE · completed
- Horizon Jewel · completed
- SUMATI SADAN · completed
- Shreeji Aspire · completed
- KRISHNAM · completed
- Dhoot Sky Residency-New Sonali CHSL · completed
- Sri Balaji Enclave · completed
- Spring Field · completed
- Vasupujya Darshan · completed
- REDEVELOPMENT OF MALAD AMBER CHSL · completed
- ALLIANCE BHASKAR · completed
- BHOOMI CELESTIA -A1 WING · completed
- LA SERENA CO-OP. HSG. SOC. LTD. · completed
- PARK ROSE CHSL · completed
- ROMELL RHYTHM · completed
- Asmita Sand Dunes · completed
- Shreeji Atlantis Wing A · completed
- ACRES ESPACER · completed
- Om Shree Ram Kripa · completed
- REDEVELOPMENT OF SILVERENE CHSL · completed
- TAXMEN COOP HSG SOCIETY LTD · completed
- SHEETAL DHARMARAJ · completed
- ALLIANCE RUIA SADAN · completed
- Arkade Serene · completed
- RAM RAMESHWAR DARSHAN CHSL · completed
- REDEVELOPMENT OF KHATRI APARTMENTS COOPERATIVE HOUSING SOCIETY LIMITED · completed
- SATGURU HEIGHTS · completed
- SUBHSHRI ARCADE · completed
- ASHISH BUILDING OF EMTICIBOM EMPLOYEES CHS LTD · completed
- BENTS CHSL · completed
- SILVER COIN CHSL · completed
- REDEVELOPMENT OF TIARA CHSL · completed
- Chaitanya Krishnai · completed
- CELESTIAL HEIGHTS · completed
- Aditya Chandrashali · completed
- AUDUMBAR APARTMENTS CHS LTD · completed
- BHOOMI CELESTIA - A WING · completed
- Gajanan Niwas · completed
- INFINITY ELEMENTS · completed
- Mahavir Santoshika · completed
- Anant Nath Nagar CHSL · completed
- New Aashirwad CHS · completed
- CEMENTERS TAVISA · completed
- REDEVELOPMENT OF RAMESH MANDIR CHSL · completed
- Dhaval CHSL · completed
- PANOM PARK C AND D WING · completed
- TRIUMPH SWASTIK · completed
- ALLIANCE SAAWAI · completed
- REDEVELOPMENT OF GOLD COIN CHSL · completed
- ONE WORLD · completed
- KOJAR IMPERIA · completed
- La Charmaine CHSL · completed
- PERRY APARTMENT · completed
- Sharon Rose CHSL · completed
- Shri Jay-Sukh Co-Op. Hsg. Soc. Ltd. · completed
- ACRES ADVAITA · completed
- ACRES AVYAN · completed
- DEVRAJ RESIDENCY · completed
- FINE HEIGHTS · completed
- IMPERIAL HAVA HIRA · completed
- SAHAKAR AVENUE · completed
- Arkade Eden · completed
- Chandraraj Complex · completed
- KABRA GARNET - Redevelopment of Jayvikas Premises Co-Op Hsg Soc Ltd · completed
- Kamla Jainson Wing C · completed
- Pratap Cress · completed
- AJMERA BOULEVARD · completed
- Metro Millennium · completed
- Veena Suyog · completed
- MARQUIS RESIDENCES PHASE 1 · completed
- Raj Shivganga · 31 Dec 2019
- SIDDHARTH PALACE · 30 Jun 2022
- Eaze Zone in Laxmi Singh Complex · 30 Dec 2022
- ROOPVIJAY CHS LIMITED · 30 Apr 2023
- MAITRI SIYA ENCLAVE · 30 Jun 2023
- OM PALACE · 31 Jul 2023
- Kamla Jainson Phase 1 Part Podium from 2nd to 4th floor and 5th to 25th habitable floors · 30 Dec 2023
- JAY GAGAN · 31 Mar 2024
- TRIUMPH TOWERS · 31 May 2024
- BALAJI ENCLAVE · 31 Jul 2024
- AURIS SERENITY TOWER 3 · 30 Dec 2024
- NEW SIMIT APARTMENT · 31 Dec 2024
- DISHA DARSHAN · 31 Mar 2025
- MALAD SHALIGRAM · 31 Mar 2025
- SHEETAL ANUPAM · 15 May 2025
- LEELAS RESIDENCY · 31 Dec 2025
- MALAD SHITALNATH CHSL · 31 Dec 2025
- Siddha Shila · 31 Dec 2025
- TRISHUL CO-OPERATIVE HOUSING SOCIETY LTD · 31 Dec 2025
- Sky Crest · 31 Mar 2026
- SHREE GOVIND KRUPA · 15 Jun 2026
- 9, Business Bay · 31 Jul 2026
- Deep Darshani Chs · 31 Jul 2026
- HANSINI ASTORIA · 31 Jul 2026
- A.N. HEIGHTS · 30 Aug 2026
- YASH SHRINE · 30 Aug 2026
- SADHANA BLISS · 30 Sep 2026
- Shree Hari Krupa · 30 Sep 2026
- Shreeji Plaza Wing A · 30 Sep 2026
- Shreeji Plaza Wing B · 30 Sep 2026
- ADVENT PALAZZO · —
- AHIMSA HEIGHTS · —
- AURIS GALLERIA · —
- AURIS SERENITY TOWER 1 · —
- AURIS SERENITY TOWER 2 · —
- ELEMENT · —
- Grace Luxuria · —
- IRENE WING A PHASE 1 · —
- KABRA AURUM WING A B C AND D Redevelopment of Goregaon Unnat Nagar II Plot No 51 to 55 CHSL · —
- La Vista · —
- LINKPARK · —
- ROMELL DIVA PHASE III - 21ST TO 23RD FLOOR · —
- Rosary Villa Co Operative Housing Society Limited · —
- SIDDHI VINAYAK · —
- Sky Residency Loksadan CHS Phase 1 Up to G Plus 7pt. · —
- SKY TOWER · —
Other areas in Mumbai Suburban
- Borivali West · 316
- Kandivali West · 288
- Chembur · 280
- Mulund West · 275
- Vile Parle East · 218
- Borivali East · 208
- Ghatkopar East · 201
- Malad East · 177
- Dahisar East · 172
- Goregaon West · 167
- Vikhroli East · 167
- Bhandup West · 159
Data compiled by GharKundli (gharkundli.com) from MahaRERA public records. Projects are grouped by the pincode filed on MahaRERA.