MahaRERA projects in Borivali West, Mumbai Suburban (400092)
According to GharKundli's check of MahaRERA records, 316 housing projects are registered in pincode 400092 (Borivali West, Mumbai Suburban). 155 are still being built, 48 with possession due by the end of 2027. For 204, the completion date on MahaRERA is later than the one first promised. 75 have at least one complaint filed on MahaRERA.
Pincode 400092 also covers: Borivali, Shimpoli, Babhai Naka, Haridas Nagar, Magathane, Borivli West.
“Possession due” is the latest completion date the builder has filed on MahaRERA; “first promised” is the date given at registration. Open a project for its full MahaRERA record.
| Project | MahaRERA status | Possession due (MahaRERA) | First promised | Complaints |
|---|---|---|---|---|
| MEGHA EDGE- RED ROSE MEGHA LAKSHMI ENTERPRISE | Active | 30 Oct 2026passed | 30 Sep 2025 | 0 |
| RASHMI CELESTIA Modi's Navnirman Limited | Active | 31 Oct 2026passed | 11 Aug 2025 | 0 |
| THE ZONE MS AMANN RAJ HOUSING AND DEVELOPMENT CORPORATION | Active | 30 Dec 2026 | 31 Jan 2021 | 5 |
| BANSI TERRACE CHSL AADHUNIK DEVELOPERS | Active | 31 Dec 2026 | same | 0 |
| DAIVI ETERNEETY YASH DEVELOPMENT | Active | 31 Dec 2026 | same | 0 |
| FORTUNE AVIRAHI WING A FORTUNE CONSTRUCTIONS | Active | 31 Dec 2026 | 30 Dec 2022 | 0 |
| Lekh Residency LEKH REALTY | Active | 31 Dec 2026 | 31 Dec 2025 | 0 |
| Meghalok Heights S S Landmark Private Limited | Active | 31 Dec 2026 | 31 Dec 2025 | 0 |
| SONI ARCADE, BUILDING NO 2 SONI & ASSOCIATES | Active | 31 Dec 2026 | 31 Dec 2018 | 3 |
| Sparkle Umadarshan SPARKLE EARTH DEVELOPER | Active | 31 Dec 2026 | 31 Dec 2025 | 0 |
| Avyukta Neelkamal Shivoham Associates | Active | 1 Jan 2027 | 1 Sep 2026 | 2 |
| Gopal Terrace Co-operative Housing Society LTD Polo Infra Developers Private Limited | Active | 30 Jan 2027 | 31 Mar 2025 | 0 |
| Sai Signature Spaces RAMACHANDRAN MUNISAWMY NARAYAN | Active | 30 Jan 2027 | 30 Sep 2025 | 0 |
| SIGNET DG BUILDERS | Active | 1 Feb 2027 | 1 Oct 2026 | 1 |
| KAVERI HERITAGE KAVERI SHINE BUILDERS AND DEVELOPERS LLP | Active | 1 Mar 2027 | 31 Mar 2025 | 0 |
| RITE DEVANGI YASHODANAND INFRA | Active | 25 Mar 2027 | 30 Oct 2024 | 0 |
| Borivali New Roma Sadan CHSL SUMUKH INFRAPROJECT | Active | 31 Mar 2027 | 30 Jun 2023 | 0 |
| Mahavir Krupa CHSL Ltd M/s Shri Neelkanth Developers & Builders | Active | 31 Mar 2027 | 31 Mar 2026 | 0 |
| OSSIA ENCLAVE R. B. Developers | Active | 31 Mar 2027 | 30 Jun 2018 | 0 |
| 27 VIDYA Zandor Holdings LLP | Active | 30 Apr 2027 | 30 Apr 2025 | 0 |
| 9 RAJGIR M S KAVITA CONSTRUCTION COMPANY | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Adarsh Garden Grove Adarsh Enterprises | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| ATULYA PHOENIX DEVELOPERS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| NEW ASHWIN CHSL OSSIA BUILDCON PRIVATE LIMITED | Active | 30 Apr 2027 | 31 Dec 2026 | 3 |
| OM SHRI JAGANNATH CHSL SAMARPAN HOMES & DEVELOPERS | Active | 30 Apr 2027 | 31 Mar 2026 | 1 |
| SHRADDHA SKYLINE SHRADDHA DEVELOPERS & REALTORS | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Sun Sumit Deepshal SUN SUMIT VENTURE | Active | 30 Apr 2027 | 31 Dec 2026 | 0 |
| Brahma Aashirvad M/s Brahma Realtors | Active | 31 May 2027 | 26 Feb 2026 | 0 |
| HIMAT MANSION CHS LTD BHATIA BUILDERS AND DEVELOPERS PVT LTDC | Active | 30 Jun 2027 | same | 0 |
| Sethia Marine View SETHIA DEVELOPERS | Active | 30 Jun 2027 | 30 Jun 2026 | 0 |
| Kamla Borivli Rajesh KAMLA HOMES AND LIFESTYLES PRIVATE LIMITED | Active | 31 Jul 2027 | 31 Mar 2027 | 0 |
| ORCHID TOWER Shree Laxmi Estate Pvt. Ltd. | Active | 31 Jul 2027 | 31 Mar 2026 | 1 |
| Shivsagar Gurukrupa Developers | Active | 31 Jul 2027 | 31 Mar 2026 | 0 |
| STATE SECTOR BANK EMPLOYEES CHS LTD KAILAS BUILDING Konark Structural Engineers Private Limited | Active | 31 Jul 2027 | 31 Mar 2025 | 0 |
| TRIENITY 1 PHASE II TRIENITY PRIME PROPERTY PROJECTS LLP | Active | 31 Jul 2027 | 31 Jan 2025 | 1 |
| GAUTAM PRABHU H RISHABRAJ REALTY | Active | 30 Aug 2027 | 30 Apr 2027 | 0 |
| EBHAAN ENCLAVE SAWANT CONSTRUCTIONS | Active | 30 Sep 2027 | 31 May 2027 | 1 |
| GIRIVAR AVENUE MEHTA SPACES | Active | 30 Sep 2027 | 31 Dec 2026 | 0 |
| PROPOSED RED ON PLOT BEARING FP NO 40 OF TPS III VILLAGE BORIVALI WEST MUMBAI SURBHI MIDAS CONSTRUCTION | Active | 30 Sep 2027 | 31 May 2025 | 0 |
| PRATHAMESH SOLITAIRE MANGESH TUKARAM SAWANT | Active | 29 Oct 2027 | 30 Apr 2025 | 0 |
| Aureate NEXT SPACE REALTY LLP | Active | 30 Oct 2027 | 30 Jun 2027 | 0 |
| JALARAM ENCLAVE SHREE SUNDHA DEVELOPERS | Active | 30 Oct 2027 | 30 Jun 2027 | 1 |
| Manglam Rajanigandha Manglam & Karnani Ventures LLP | Active | 30 Oct 2027 | 30 Jun 2027 | 0 |
| BLUE STAR CRYSTAL CHSL PARADIGM BLUE STAR LLP | Active | 12 Nov 2027 | 12 Jul 2027 | 0 |
| DOTOM HILTON DOTOM SUPERSTRUCTURES LLP | Active | 31 Dec 2027 | 31 Aug 2027 | 1 |
| KHANDELWAL LUXOR WING B SHREE KRISHNA SAI DEVELOPMENT CORPORATION | Active | 31 Dec 2027 | same | 0 |
| KHANDELWAL RESERVE WING B SHREE KRISHNA SAI DEVELOPMENT CORPORATION | Active | 31 Dec 2027 | same | 2 |
| SBI RAGVIHAR CHS Tuvin Consultancy LLP | Active | 31 Dec 2027 | 10 Dec 2020 | 5 |
| NIRDHAR CO OPERATIVE HOUSING SOCIETY LIMITED SWAMI SHRIHARI DEVELOPERS PVT LTD | Active | 1 Jan 2028 | 9 Jun 2019 | 3 |
| JALARAM SQUARE SHREE JALARAM DEVELOPERS | Active | 30 Jan 2028 | 30 Sep 2027 | 1 |
250 more projects
- MODISPACES NILE · 30 Jan 2028
- Dollars Avenue CHSL · 2 Mar 2028
- DARSHAN TOWER CHS REDEVELOPMENT PROJECT · 31 Mar 2028
- VAMANASHRAM · 31 Mar 2028
- ANANTHAM · 30 Apr 2028
- ANJANI SHIKHAR · 30 Apr 2028
- BHAVIK DARSHAN CHS LTD AND GAJMUKH CHS LTD · 30 Apr 2028
- BORIVALI KESAR KRIPA CHS LTD · 30 Apr 2028
- BORIVLI ANJALI CHSL · 30 Apr 2028
- IPSIT ANAND MANGAL · 30 Apr 2028
- Navkar Girija Sadan · 30 Apr 2028
- OM AMAR SHAKTI · 30 Apr 2028
- Sanjay Abode – Shree Vijay C-D Wing CHSL · 30 Apr 2028
- SHIMPOLI SAI SMRUTI · 30 Apr 2028
- SHREE HARI OM NAGAR · 30 Apr 2028
- SHREE RADHE SHYAM HEIGHTS · 30 Apr 2028
- THE CAPITAL · 30 Apr 2028
- Triguni Heights · 30 Apr 2028
- TRILOGY VITHAL CO-OPERATIVE HOUSING SOCIETY LIMITED · 30 Apr 2028
- VIJAYDEEP · 30 Apr 2028
- VILAS VAIBHAV CHS · 30 Apr 2028
- Ganapati Baug CHSL · 31 May 2028
- Express Tower CHS · 16 Jun 2028
- NEW AAKANKSHA CHSL · 23 Jun 2028
- DEVENDRA CHSL · 31 Jul 2028
- Mohan Terrace 'A' CHSL · 31 Jul 2028
- Acres Aarambh · 13 Aug 2028
- SUKHSAGAR HEIGHTS · 28 Sep 2028
- GAURAV GALAXY · 30 Oct 2028
- Rishabraj Anuja · 30 Oct 2028
- Ruparel Zinnia · 30 Oct 2028
- Shreeji Leela · 30 Oct 2028
- EMPIRE ETERNITY · 30 Nov 2028
- MANORAMA JEWEL · 31 Dec 2028
- RITA PALACE CHSL · 31 Dec 2028
- DOTOM VUE · 28 Feb 2029
- MUNICIPAL STAFF MANDAR CHSL · 30 Mar 2029
- 21 JEWEL · 30 Apr 2029
- 92 PLATINUM HIVE · 30 Apr 2029
- Adarsh Garden Grove WING B · 30 Apr 2029
- Anmol Residency · 30 Apr 2029
- DENA SADICHCHHA CO OPERATIVE HOUSING SOCIETY LIMITED · 30 Apr 2029
- GORAI RUBY CHSL · 30 Apr 2029
- HANSA RESIDENCY · 30 Apr 2029
- KSHITIJ VILLA · 30 Apr 2029
- NAVISH PRESIDENCY · 30 Apr 2029
- NAVKAR DEVDATT · 30 Apr 2029
- NICCO VANASHRI AND NICCO HEIGHTS · 30 Apr 2029
- Shraddha Paradise · 30 Apr 2029
- SHREE VIGHNESHWAR CHS SRA · 30 Apr 2029
- VANITA NIKETAN CO OPERATIVE HOUSING SOCIETY · 30 Apr 2029
- VARDHAMAN · 30 Apr 2029
- ZEN PRISTINE · 30 Apr 2029
- SHIVALAYA · 2 May 2029
- SKYLARK HEIGHTS · 11 Jun 2029
- I SPACE URBAN VISTA · 30 Jun 2029
- ADITI CO OPERATIVE HOUSING SOCIETY LTD · 31 Jul 2029
- AVYUKTA JAYESH · 31 Jul 2029
- INSPIRA AURA · 31 Jul 2029
- PARIJAT, MRUGENDRA CHSL · 31 Jul 2029
- Sumit KMR Param · 31 Jul 2029
- RC 92 - Redevelopment of New Link View CHSL · 30 Oct 2029
- UNIQUE REGALIA · 30 Oct 2029
- Mahavir Dynasty · 30 Dec 2029
- AAFCON HARMONY · 31 Dec 2029
- BRINDAVAN SILVERPARK CHS · 31 Dec 2029
- Gorai (2) Shubharambha CHSL · 31 Dec 2029
- Shree Om Paradise CHSL · 31 Dec 2029
- ROHOM RADIANCE · 1 Jan 2030
- Giriraj Mandir Premises Co operative Society Limited · 30 Jan 2030
- HARSHAIL IRIS APARTMENT · 30 Jan 2030
- POOJA CO-OPERATIVE HOUSING SOCIETY LIMITED · 28 Feb 2030
- ASHWAMEDH HEIGHTS · 30 Apr 2030
- GIIRNAR · 30 Apr 2030
- Girnar Apartment Co-Operative Housing Society Limited · 30 Apr 2030
- GOLD LEAF · 30 Apr 2030
- IPSIT DEEP DARSHAN · 30 Apr 2030
- JAI DENA CHSL · 30 Apr 2030
- KHANDELWAL LUXOR WING A · 30 Apr 2030
- KHANDELWAL RESERVE WING A · 30 Apr 2030
- MADHAV BAUG · 30 Apr 2030
- Arham · 31 Jul 2030
- RUCHI CHSL · 31 Jul 2030
- Siddharth Borivali CHSL · 30 Oct 2030
- Altus · 31 Dec 2030
- Giriraj Gold · 31 Dec 2030
- HIRANYAKESHI HEIGHTS · 31 Dec 2030
- THE NEXT LEVEL COMMERCIAL · 15 Apr 2031
- AVVIRAHI PLATINUM · 25 Apr 2031
- ENTERPRISE ONE · 30 Apr 2031
- HILL VIEW · 30 Apr 2031
- One Reserve · 30 Apr 2031
- Paradigm Anantaara · 30 Apr 2031
- The Crimson · 30 Apr 2031
- THRISH9 · 30 Apr 2031
- Veena Celestia · 30 Apr 2031
- VIJAYA HEIGHTS · 30 Apr 2031
- KANAKIA PRIVAASA TOWER 1 & 2 · 30 Jun 2031
- NEELDHARA CO-OPERATIVE HOUSING SOCIETY LIMITED · 30 Jul 2031
- Shreeji Ananta · 30 Sep 2031
- BHOOMI AIRAVAT · 30 Apr 2032
- BRAHMAND GALAXY · 30 Apr 2033
- H. Rishabraj Towers · 30 Apr 2033
- JPC VELORA · 30 Apr 2033
- Hiranandani Bluecrest · 31 Aug 2033
- Gorai Laxmi CHSL Casa Bellisimo B wing · completed
- ACHARYA ASHRAM SAHAKARI GRIHA RACHANA SANSTHA MARYADIT · completed
- ASHWINI RESIDENCY BORIVALI ASHWINI CHSL · completed
- NEELREKHA · completed
- Avirahi Homes Building 3 · completed
- GORAI SHREE RAM TOWER CHS LTD · completed
- SAJAG CHS · completed
- PARAG - RESERVE CO-OP HSG SOC · completed
- Ankur Palace · completed
- ANANDA RESIDENCY · completed
- Gayatri CHSL 8th 9th floor · completed
- Vastu Pinnacle · completed
- DURGA SMRUTI CHS LTD · completed
- BT SUJATA CHSL · completed
- Gorai Laxmi CHSLCasa Bellisimo B Wing Phase II · completed
- SBI Staff Trinity CHS Ltd · completed
- SAMTA · completed
- CASA RARE · completed
- RBI employees Ashish chsl · completed
- Rite Oscar · completed
- Sanskruti Splendour · completed
- Aashray · completed
- SHRADDHA CHHAYA · completed
- RASHMI TERRACE · completed
- Priya Apartment · completed
- Avirahi Heights · completed
- NANDANVAN · completed
- VICTORY ARCH · completed
- AASHIRWAD RESIDENCY WING D · completed
- AADHUNIK AURA · completed
- PATKESHWAR APARTMENT CHS LTD · completed
- ADINATH CHSL · completed
- REDEVELOPMENT OF BORIVALI SHIVDARSHAN CHSL · completed
- Rite Fortis · completed
- Blue Star CHSL · completed
- PREETI SANGAM CHS · completed
- KRISHNA KOYNA · completed
- Dreamsville · completed
- RISHABRAJ SURAJ · completed
- Boirvali Samarpan CHS Ltd · completed
- Chaitanya Om Shivam - Om Shivam Premises CSL · completed
- REDEVELOPMENT OF POPULAR TERRACE CHSL · completed
- THE JAMBLI GALLI CHS LTD · completed
- EVARA · completed
- SHREE DATTA DIGAMBER CHSL · completed
- Aura · completed
- D Wing Building No. 1 · completed
- RBIES Jaidatta CHSL · completed
- Anjani Tirth · completed
- AXIOM SIGNATURE · completed
- Bathia Building No 2 · completed
- Modispaces Volga · completed
- OM SAI SADAN · completed
- Prem Ratan · completed
- Samarth Arihant · completed
- Sanskruti Vrushi · completed
- Sumit One · completed
- UNIQUE ABODE · completed
- UNIQUE SERENITY · completed
- SUPREME MADHUKAR · completed
- BORIVALI NEELKANTH NAGAR CHS LTD · completed
- Kasturi Milan · completed
- MAHASHREENATHJI CO-OP HOUSING SOCIETY LTD · completed
- BORIVLI SHEELA CHS LTD · completed
- HIMAANSHU RESIDENCY · completed
- KAMLA PRASANNA JEEVAN BUILDING 2 · completed
- KAMLA PRASANNA JEEVAN BUILDING1 · completed
- NEW INDIA ASSURANCE EMPLOYEES MANDAR CHS LTD · completed
- OM MOTI NAGAR CHSL · completed
- VISHAL-1 · completed
- Supreme Imperial · completed
- GARDEN VIEW · completed
- DEVKRUPA CO-OPERATIVE SOCIETY LTD · completed
- 21 SQUARE · completed
- BORIVALI YASHODHAN CHSL · completed
- ELEGANTE CORNER · completed
- FRIENDS BUSINESS BAY · completed
- Jay Shrinath CHSL · completed
- Rajkamal · completed
- RASHMI VASUDEO · completed
- BORIVALI PADAM CHSL · completed
- New Abhiram CHS LTD · completed
- KAMLA OM HANSA CHSL · completed
- Shree Yashodhan · completed
- MAYA MAMTA · completed
- THE PEARL - Borivali Rajmani CHS LTD · completed
- AURIS BUSINESS CENTRE · completed
- OM AARTI · completed
- ABHIMAN · completed
- AJMERA MANOR · completed
- ANTARIKSH · completed
- Avyukta Prakash · completed
- Mehta Premiere-Residential · completed
- PREESHA PARADISE · completed
- RANJAN ELEGANCE · completed
- RISHABRAJ PARK VISTAS · completed
- SHRADDHA ELITE · completed
- ACHARYA ASHRAM SAHAKARI GRIHA RACHANA SANSTHA MARYADIT · completed
- WEST AVENUE · completed
- SUN SUMIT JEEVAN MANGAL · completed
- EMERALD AND SAPPHIRE · completed
- House of Shreeji Sharan · completed
- Shikhhar · completed
- SWASTIK · completed
- AKSHAYA AND JAYSHREE REDEVELOPMENT · completed
- BELLA VISTA · completed
- Mahirr · completed
- RISHABRAJ MANGALESH · completed
- TREVI · completed
- REDEVELOPMENT OF LAKSHMAN TOWER CHSL · completed
- OMKARA UNCHAI · completed
- ALLIANCE ETERNIS · completed
- PRANEETA HEIGHTS · completed
- Pratap Adinath · completed
- VRAJ GATEWAY-APARNA CHSL · completed
- SAI LAXMI CHSL · 31 Dec 2018
- NEELKANTH SMRUTI CHS LIMITED · 30 Dec 2020
- OM SARJAN CHSL · 30 Dec 2021
- Address II · 30 Jun 2022
- OM SATYAM NIWAS CHS LTD · 31 Jul 2022
- NAVKAR PARADISE · 15 Dec 2022
- SWASHRAY · 31 Dec 2022
- SHREEYOG CHSL · 30 Jun 2023
- ICON BELLE VUE · 30 Aug 2023
- Rite Aspire · 31 Dec 2023
- ZEN ENCLAVE · 31 Dec 2023
- MAHAVIR SPACES · 31 May 2024
- MADHUBAN HEIGHTS · 28 Aug 2024
- Nutan Dream · 29 Dec 2024
- SOHAM MAJESTY · 30 Dec 2024
- Rajeshwari Co-Op. Hsg. Soc. Ltd. · 31 Dec 2024
- ANAMIKA NIWAS CHSLLTD · 31 Mar 2025
- SAKSHAT NAVKAR · 31 May 2025
- Jessika Chs.Ltd. · 30 Jun 2025
- ViR ENCLAVE · 30 Jun 2025
- W 92 · 30 Jun 2025
- ASHIRWAD CHSL · 1 Aug 2025
- POPPY CHS LTD · 14 Aug 2025
- Borivali Keshav Co-Operative Housing Society Ltd. · 30 Sep 2025
- Shiv Tapasya · 30 Sep 2025
- HARI SMRUTI CHS · 30 Dec 2025
- OM VASUDEV CHS LTD. · 31 Mar 2026
- PARVATI HUB · 31 Mar 2026
- GARUDA SHATRUNJAY · 30 Jun 2026
- JOVIAL ARK · 31 Jul 2026
Other areas in Mumbai Suburban
- Kandivali West · 288
- Chembur · 280
- Mulund West · 275
- Malad West · 256
- Vile Parle East · 218
- Borivali East · 208
- Ghatkopar East · 201
- Malad East · 177
- Dahisar East · 172
- Goregaon West · 167
- Vikhroli East · 167
- Bhandup West · 159
Data compiled by GharKundli (gharkundli.com) from MahaRERA public records. Projects are grouped by the pincode filed on MahaRERA.