Skip to content
GharKundli

Possession due in 2027 · Raigad

According to GharKundli's check of MahaRERA records, 411 housing projects in Raigad have a MahaRERA completion date in 2027, out of 2,022 Raigad projects GharKundli has read in detail so far.

The date is the latest completion date the builder has filed on MahaRERA, including MahaRERA’s automatic 4-month extension of August 2026 where it applies. “First promised” is the date given at registration. Completed projects are not listed. Open a project for its full MahaRERA record.

ProjectWherePossession due (MahaRERA)First promisedComplaints
ARSH APARTMENT
MATEEN RAFIQUE PATEL
Mamdapur30 Jan 202730 Jun 20250
Dhanlaxmi Heights
Dhanlaxmi Developers
Bhisegaon30 Jan 202731 Mar 20260
GAJ OASIS
SHIV BUILDERS AND DEVELOPERS
Panvel30 Jan 202730 Sep 20260
GANGA SHANKAR HEIGHTS
Vikrant Anil Turekar
Pushpak New30 Jan 202730 Sep 20232
NAAZ PLAZA
PRESTIGE REALITY
At Mamdapur30 Jan 202730 Jun 20250
ROYAL YUSRA HEIGHTS
AL-YUSRA DEVELOPERS LLP
Taloje Panchnad30 Jan 202730 Jun 20251
SHANKAR HEIGHTS
SIRVI INFRA
Panvel30 Jan 202731 Mar 20260
THARWANI PALLADIAN
THARWANI REALTORS
Village Kharghar30 Jan 202730 Sep 20260
Godavari Grandeur
MAITREE BUILDERS AND DEVELOPERS
Panvel1 Feb 20271 Oct 20260
SUMAN RESIDENCY
PRANAY KANHA KOLI
Ulwa20 Feb 202731 Dec 20230
MARATHON NEXZONE BODHI - 1
SANVO RESORTS PVT. LTD. (Marathon)
Palaspe Phata28 Feb 202730 Jun 20265
Shikara Greens Phase I
Shikara Constructions Pvt. Ltd.
Chinchavali Village28 Feb 202730 Dec 20230
AMANSARA EARTHSTAR
SVB LIFESPACES LLP
Ganeshnagar6 Mar 20276 Nov 20261
AMANSARA EARTHSTAR PH
SVB LIFESPACES LLP
Law College Road6 Mar 20276 Nov 20260
SIDDHIVINAYAK APARTMENTS
BALDEV DIWAN SINGH
Dronagiri25 Mar 202725 Nov 20260
AARVI RESIDENCY
DHARMPAL OMKARMAL CHOUDHARY
Rees30 Mar 202731 Dec 20250
Ambers Dnyaneshwar Capital
Capital Builders
Pushpak Node30 Mar 202730 Nov 20260
GOVIND GREENS
PRIYAL BUILDCON LLP
Village Kewale30 Mar 202731 May 20240
Jai Mata Di
Vraj Developers
Navi Mumbai30 Mar 202730 Nov 20260
JAMBRUNG VALLEY
KIRTIRAJ NANASAHEB SAWANT
Jambrung30 Mar 202730 Nov 20261
Om Unnati
Om Group
Taloje Majkur30 Mar 202730 Nov 20260
PENDSE PARK
F ND H CONSTRUCTIONS
Pen30 Mar 202731 May 20260
Rupal Siddharth Co Operative Housing Society
Punit Enterprise
Old Panvel30 Mar 202731 May 20260
Shiv Sagar
Vishwmbhar Nath krishna Govind Mishra
Wahal30 Mar 202730 Nov 20260
Shree Krupa Apartment
Rajesh Dattatray Shinde
Dahiwali30 Mar 202731 Dec 20250
BALAJI AANGAN
BALAJI LAND DEVELOER
Halivali Karjat31 Mar 202728 Feb 20210
DHARTI KRISHNA
KRISHNA LIFESPACE INFRA
Pushpak31 Mar 2027same0
ETERNIA
GREENSCAPE DEVELOPERS PRIVATE LIMITED
Police Head Quter31 Mar 202730 Dec 20231
HIMALAYA GARDENS
HIMALAYA BUILDERS AND DEVELOPERS LLP
Pashane31 Mar 20271 Oct 20240
JYOTI RESIDENCY
JANVI ENTERPRISES
Khalapur31 Mar 202730 Dec 20240
Kalpataru Aria - Phase B
Arena Orchards Private Limited (Kalpataru)
Karjat31 Mar 202731 Mar 20260
MITHILA ICON
N R BUILDERS AND DEVELOEPRS
Roha31 Mar 202731 Mar 20240
Mountain View Residency 2
Immaculate Developers
Raigarh31 Mar 202730 Mar 20251
Munot Vastu Exotica -Commercial
Vastu Infrastructure
Old Panvel31 Mar 2027same0
Munot Vastu Exotica Phase -I
Vastu Infrastructure
Old Panvel31 Mar 2027same1
Munot Vastu Exotica Phase -II
Vastu Infrastructure
Old Panvel31 Mar 2027same1
NEEL SIDHI RUBY
NEEL SIDHI REALTIES
Khanda Colony31 Mar 202731 May 20230
PATIL APARTMENT
NAVNATH HANUMAN PATIL
Pushpak31 Mar 2027same0
Rudrashakti Heights
Prakash Maruti Gharat
Pushpak Node Vadghar, Panvel31 Mar 202731 Oct 20250
SAI ELEGANCE
PRATHAM INFRASTRUCTURE
Pushpak New31 Mar 202730 Dec 20230
SITA RESIDENCY
KRISHNA PANDIT GHARAT
Pushpak Node31 Mar 202731 Mar 20230
THE RETREAT DURSHET 1ST PHASE
BRICKS INFRASTRUCTURE
Durshet31 Mar 202730 Mar 20241
AK PLATINUM TOWER
Amit Shashikant Khatu
Ashtami8 Apr 20279 Dec 20250
SHREE VASANTI RESIDENCY
KAPIL VIJAY JAIN
Near Primary School, Ramwadi15 Apr 202730 Jun 20250
Bliss Studio
BALSAM BUILDERS
Pathraj19 Apr 202721 Dec 20222
GALAXY PRIME
GALAXY BUILDCON
Panvel25 Apr 202725 Dec 20260
DEVASHREE AANGAN
SHASHIKANT MARUTI DISALE
Village Khanav29 Apr 20279 Feb 20244
Sai Mangalmurti
Avinash Damodar Naik
Pushpak Node Vadghar29 Apr 202729 Dec 20260
7 OAK APAPRTMENT
TAKHATSINH PRAVINSINH RANA
Kharghar30 Apr 202731 Dec 20260
AAKASH HEIGHTS
AAKASH LIFESPACES
Chinchavali Shelin30 Apr 202731 Dec 20260
AARSH BHANUDAS
POONAM BHANUDAS MOKAL
Pushpak New30 Apr 202730 Jun 20240
Alankara Paradise
Kaavish Developers
Pushpak (Dapoli)30 Apr 202731 Dec 20260
Amber Apartment CHS
ROYAL ENTERPRISES
Panvel30 Apr 202731 Dec 20260
Amulyam
Space India Builders & Developer
Pale Budruk30 Apr 202731 Dec 20250
ANAND PARK
NARENDRA SOPAN DAHITANKAR
Neral30 Apr 202731 Oct 20190
ANIRUDDHA POOJA
ANIRUDDHA BUILDCON
Panvel30 Apr 202731 Dec 20261
ANKIT FIONA PHASE 2
MAHESH SUHAS PADALKAR
Bhuwaneshwar30 Apr 202730 Jun 20210
ANUSAYA RESIDENCY
RAMNARAYAN PHOOLCHANDRA PATHAK
Node Pushpak30 Apr 202731 Dec 20260
Apramit
PRIDE DEVELOPERS
Karanjade30 Apr 202731 Dec 20260
ARHAM
IYS PROPERTIES LLP
Pen30 Apr 202731 Dec 20260
ARYAN RESIDENCY
ARYAN PROPERTIES & INFRASTRUCTURE COMPANY
Raviprakash Nagar30 Apr 202730 Apr 20240
Ashwini Apartment
Kuldeepsingh Amarsingh Bhalothia
Kharghar30 Apr 202731 Dec 20240
ATHARVA SANKALP
SANKALP GROUP
Village Dapoli Node Pushpak30 Apr 202731 Dec 20260
AVANTIKA AURA
RIDDHI DEVELOPER
Dronagiri30 Apr 202731 Dec 20260
Avighna
Shinde and Vichare Ventures
Vahal, Pushpak30 Apr 202731 Dec 20260
BALIBAUG REKREASI
Pushpam Infra LLP
Kawir30 Apr 202731 Dec 20250
BANUBAI RESIDENCY
SAMINDRA BALAKRISHNA THAKUR
Pushpak30 Apr 202731 Dec 20260
Bellim Residency
Mohd Khalid Mohd Iqbal Shaikh
Mamdapur Village30 Apr 202731 Dec 20260
Beverly Hills
Rudram Infra Projects Private Limited
Karjat S.O (Raigarh(MH))30 Apr 202730 Dec 20261
BHAGWATI BELLEZA
M/S BHAGWATI VENTURES
Ulwe30 Apr 202731 Mar 20260
BHIDE RESIDENCY
GOPIKRISHNA CONSTRCUTION
Near Jogeshwari Temple30 Apr 202731 Dec 20260
BLUE HEAVEN
VARADVINAYAK DEVELOPERS
Village Palaspe30 Apr 202731 Dec 20260
Bombay Chalet
Bombay Shiva Plus LLP
Dronagiri, Uran30 Apr 202731 Dec 20260
BRIGHT ENCLAVE
BRIGHT BUILDCON
Khopoli30 Apr 202731 Mar 20240
CENTURY DREAMS
MUKESH PREMJI PATEL
Roadpali, Kalamboli30 Apr 202731 Dec 20260
Chaitanya Pride
Dipak Annaso Patil
Vadghar, Pushpak Node30 Apr 202731 Dec 20260
CHAITANYA RESIDENCY
DHANAJI SAMPAT KATKAR
Ulwe30 Apr 202731 Dec 20260
Chander Niwas
Shree Surya Developers
Panvel30 Apr 202731 Dec 20260
Cluster A
Shibam Associates
Neral30 Apr 20279 Dec 20230
DHARTI CORNER
DHARTI BUILDCON
Pushpak Nagar30 Apr 202731 Dec 20260
DHRUV RESIDENCY PLATINUM
KAMLESH DEVIDAS DHRUV
Vangani West30 Apr 202731 Dec 20250
Diya Trinity
Diya Life Spaces
Pushpak- Vahal30 Apr 202731 Dec 20250
EKDANTA PLAZA
Ekdanta Realtors
Pandurang Wadi30 Apr 202730 Dec 20200
ELCARIM ENCLAVE
ELCARIM DEVELOPERS AND PROPERTIES PRIVATE LIMITED
Mamdapur30 Apr 202731 Dec 20260
ELEGANT PHASE - I
DGAINS BHOOMI NIRMAAN LIMITED
Hirewadi30 Apr 202730 Dec 20230
ELITE HOUSE
FORTUNE INFRA DEVELOPERS
Mamadapur30 Apr 202712 Feb 20240
ELYSIAN
DEVAM VENTURES
Kharghar30 Apr 202731 Dec 20260
EMPIRE HEIGHTS
EMPIRE BUILDCON
Pushpak- Vadghar30 Apr 202731 Dec 20250
ETERNIA SPACE PHASE II
PLANET SPACE
Karjat30 Apr 202730 Dec 20232
FRIENDS ARCADE
FRIENDS DEVELOPERS
Neral30 Apr 202730 Dec 20230
Gajvakra Heights
Gajvakra Realty Private Limited
Mauje Mudre Budruk ,Karjat30 Apr 202731 Dec 20240
GALAXY 7
GALAXY GROUP OF COMPANY
Koyna Vele30 Apr 202731 Dec 20260
GANESHA GREENS
CINCO BUILTCO LLP
Pushpak30 Apr 202730 Jun 20260
Ganga Kutir
Trillion Infra
Pushpak Wahal30 Apr 202731 May 20260
Guru Krupa Heights
Noviya Infra Private Limited
Kombadbhuje ULWE30 Apr 202731 Mar 20260
Hill View
Saffron Developers
Ulwe30 Apr 202731 Dec 20260
Honey Homes Co-Operative Housing Society Limited
Honey Homes Co.Op.HSG.Society Ltd
Kharghar30 Apr 202731 Dec 20260
HOUSAI
PRASHANT DASHRATH MHATRE
Ulwe30 Apr 202730 Sep 20220
Hrishikesh Elite
Hrishikesh Group
Vahal- Pushpak Node30 Apr 202731 Dec 20260
IMPERIAL CROWN
DYNAMIC ENTERPRISES
Rasayani30 Apr 202730 Dec 20250
Indraprashth
Suresh LILADHAR Toprani
Dasturi Naka30 Apr 202730 Jun 20190
Infragate Palace
Sharda Infra
Dapoli -Pushpak Node30 Apr 202731 Dec 20260
Infragate Taj
Sharda Infra
Vadghar, Panvel30 Apr 202731 Dec 20260
J. K. Paradise
J. K. Infracon
Navi Mumbai30 Apr 202731 Dec 20260
JAGDAMBA RESIDENCY
OMNATH LAXMAN ULVEKAR
Village Dharnacamp And Village Rohinjan30 Apr 202731 Dec 20260
JAI HERITAGE
WINGS BUILDCON
Chambarkhind30 Apr 202731 Dec 20240
JAI TULJABHAVANI SAHAKARI GRUHANIRMAN SANSTHA LTD
ANNARAYA MADIVALAPPA SHEELAVANT
Mahad30 Apr 202730 Nov 20230
Joy Villa Phase-I
SADANAND LAXMANRAO PATIL
Chive Sudhagad30 Apr 202731 Dec 20260
JUPITER ARIHANT
ARJUN ASHOK TARACHANDANI
Pushpak Vahal Navi Mumbai30 Apr 202731 Dec 20250
KALINDI ELITE
KALINDI REALTORS PRIVATE LIMITED
Pen30 Apr 202731 Dec 20260
Kalpataru Aria - Phase D
Arena Orchards Private Limited (Kalpataru)
Karjat30 Apr 202731 Dec 20262
KENISHA RESORT RESIDENCES - CLUSTER R1 TO R13 AND S1A TO S2B
KPIN REAL ESTATE VENTURES
Sudhagad,Pavsalwadi30 Apr 202731 Dec 20260
KRISHNA AVENUE
BHANU GROUP
Ulwe30 Apr 202731 Dec 20260
Krishna Bliss
Krishna Infra
Pushpak Node30 Apr 202731 Dec 20260
KRISHNA CORNER
Krishna Builders and Developers
Pushpak Nagar30 Apr 202731 Dec 20260
Krishna Veer
Veer Realty
Pushpak30 Apr 202731 Dec 20260
LANDMARK HERITAGE
Icon Builders & Developers
Umroli30 Apr 202725 Dec 20231
LATITUDE-STATUS REDEFINED
FLEXTON LIFESPACES PRIVATE LIMITED
Patalganga30 Apr 202731 Dec 20250
LUXE-28
Pushpam Infra LLP
Vilalge Kashele30 Apr 202731 Dec 20261
Magnolia Cluster 1
Wadhwa Construction and Infrastructure Private Limited
Wise city30 Apr 202730 Dec 20263
Magnolia Cluster 2
Wadhwa Construction and Infrastructure Private Limited
Wise City30 Apr 202730 Dec 20260
Manzil Amor
Manzil Construction and Engineering Private Limited
Dronagiri30 Apr 202731 Dec 20260
MILLENNIUM URBANIA
MILLENNIUM GROUP
Kalamboli30 Apr 202731 Dec 20260
MOHAN PLAZA
SAIRAJ ENTERPRISES
Ulwe30 Apr 202731 Dec 20260
MOUNT VILLE
M/S SAMVID LIFE SPACES
Lokgram30 Apr 202731 Mar 20197
MULLA RESIDENCY
Zafar Mohd Rashid Mulla
Neral30 Apr 202731 Dec 20260
Mumbai Ajinkyans Co -Operative Housing Society Limited
Mumbai Ajinkyans Co Operative Housing Society Limited
Kharghar30 Apr 202731 Dec 20260
NAVANKUR CO-OPERATIVE HOUSING SOCIETY LTD.
KEDAR BUILDCON PRIVATE LIMITED
Old Panvel30 Apr 202731 Mar 20260
NEXUS PEACE
NEXUS INFRA
Panvel30 Apr 202731 Dec 20260
NIKHIL PARK
GURUDEV DEVELOPERS
Pashane30 Apr 202731 Dec 20260
Niki Tower 2
MS BUILT HEIGHT LLP
Panvel30 Apr 202731 Dec 20260
Nilaya
FOURTHSTREET CONSULTANCY LLP
Santacruz West30 Apr 202731 Dec 20260
Nisarg Aura
TPV Lifespace LLP
Kharghar30 Apr 202731 Dec 20260
Olympeo Retreat - Phase 2
PARADISO REALTY SOLUTIONS LLP
Olympeo Retreat, Borivali - Sugve30 Apr 202731 Dec 20260
OM SHAKTI ENCLAVE
OM SHAKTI ENTERPRISES
Dronagiri30 Apr 202730 Oct 20240
ORCHID VILLA
VILLA REALTOR
Dronagiri30 Apr 202730 Dec 20220
PARIJAT CHS
Priyal Realty
Panvel30 Apr 202731 Dec 20260
PARVATI HERITAGE
R D LIFESPACE
Kharghar30 Apr 202730 Jun 20260
PAYAL KALP
V K INFRA
Pushpak Nagar Dapoli30 Apr 202731 Dec 20260
Plot No -2,Sector-39,Mansarovar Railway Station
CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED
Mansarovar30 Apr 202731 Dec 20250
Pote Pallacio
PRAKASH GAJANAN POTE
Kharghar30 Apr 202731 Dec 20260
PRAARAMBH SADANIKA
S.B. REALTORS
Kolhare Neral30 Apr 202731 Dec 20250
PRAKASH SADAN
VARAD VINAYAK CONSTRUCTIONS
Pushpak Nagar30 Apr 202731 Dec 20260
Pratapnagar
PYRAMID DEVELOPERS
Panvel30 Apr 202731 Dec 20260
PRITHVI AARNA
PRITHVI MULTIPROJECTS LLP
Panvel30 Apr 202731 Dec 20260
RADIANT CORNER
RADIANT INFRA
Panvel30 Apr 202731 Dec 20260
RAGHUNATH
Aayushi Corporation
KAMOTHE30 Apr 202731 Dec 20260
REDDYS PRIDE
M R REALTY
Panvel30 Apr 202731 Dec 20260
ROYAL COMPLEX
ROYAL DEVELOPERS
Taloje Majkur30 Apr 202730 Jun 20240
Rudraksh One
Rudraksh Builders
Pushpak- Vahal30 Apr 202731 Dec 20250
SAI AMBER RESIDENCY
WALMIK RAGHUNATH KHAIRNAR
Panvel30 Apr 202731 Dec 20260
SAI BLISS
HEZAL AND NAVYA INFRA LLP
Pushpak30 Apr 202731 Dec 20260
SAI GANESH
SAI GANESH REALITY
Panvel30 Apr 202731 Dec 20260
SAI KRUPA
EMERALD GROUP BUILDERS AND DEVELOPERS
Panvel30 Apr 202731 Dec 20260
SAI NEEVANT
SUREKHA TUKARAM DUDHE
karanjade30 Apr 202731 Dec 20260
Sai Pearl
Jay Gurudev Construction
Ulwe30 Apr 202731 Dec 20261
SAI PRATHAMESH
VAIJANTI ANIL MHATRE
Pushpak Node30 Apr 202731 Dec 20260
SAI SAMARTH
SANDHYA SACHIN SHAH
Node - Pushpak30 Apr 202731 Dec 20260
Sai Shrushti
Ashtavinayak Infratech
Pushpak, Panvel30 Apr 202731 Dec 20250
SAI SUNCITY PHASE 1
Chariot Properties LLP
Ghot30 Apr 202730 Dec 20261
Saichaitanya
BHOSALE BUILDCON
Pushpak New30 Apr 202731 Dec 20230
SAKHA HEIGHTS
SAKHA LIFESPACE LLP
Dronagiri30 Apr 202731 Dec 20250
Samarth
Neelkanth Associates
Old Panvel30 Apr 202730 Jun 20260
SANDHYA SADAN
SUJIT JANARDHAN MHATRE
Pushpak Wahal30 Apr 202730 Jun 20240
SARA CITY
SARA REALITY
Taloja30 Apr 202731 Dec 20260
SARA CORNER
SARA REALITY
Taloja30 Apr 202731 Dec 20260
Satyam Trident
Satyam Infracon Private Limited
Vadghar30 Apr 202731 Dec 20260
SATYAM TRINITY TOWERS
SATYAM INFRA REALTY LLP
Kharghar30 Apr 202731 Dec 20262
Savitri Enclave
Savitri Builders and Developer
Pushpak30 Apr 202731 Dec 20250
SHALIMAR GALAXY
MOHAMMED SALIM AKBAR HUSSAIN SHAIKH
Neral30 Apr 202731 Dec 20190
SHIV ELITE
PREMJI DOSHA VAVIYA
Pushpak Node30 Apr 202731 Dec 20260
Shiv Emerald
Shivkrupa Builders & Developers
Karanjade30 Apr 202731 Dec 20250
SHIV GANESH
HEZAL AND NAVYA INFRA LLP
Pushpak30 Apr 202731 Dec 20260
SHIV SHANKAR RESIDENCY
SURESH SHIVSHANKAR SHARMA
Taloja30 Apr 202730 Dec 20230
SHREE EKDANTA RESIDENCY
MILESTONE CONSTRUCTION
Panvel30 Apr 202731 Dec 20260
SHREE SAMARTH KRUPA C WING
KRISHNA RAMCHANDRA KADAM AND GANESH TUKARAM KADAM
Poladpur30 Apr 202731 Dec 20230
Shree Samartha Homes
Varun Pandit Tandel
Pushpak Node30 Apr 202731 Dec 20230
SHREE SIDDHI RESIDENCY
SHREE SAI HOMES BUILDERS AND DEVELOPERS
Ulwe30 Apr 202731 Oct 20210
SHREE SIDDHIVINAYAK RESIDENCY
MANGALMAY REALTIES
Pen30 Apr 202731 Dec 20260
SHREEKRUPA HEIGHTS
MADHAV VILLA DEVELOPERS LLP
dronagiri30 Apr 202730 Dec 20240
SHREEPATI REGALIA
SHREEPATI GROUP
Pushpak Node30 Apr 202731 Dec 20260
SHRI GANESH KRUPA
SHREE GANESH BUILDERS & DEVELOPERS
Pushpak30 Apr 202730 Jun 20230
Siddhivinayak Apartment
ROYAL REALTY
Koyana Velhe30 Apr 202730 Jun 20260
Sirvi Hilltop
Sirvi Infra
Pushpak, Vadghar30 Apr 202731 Dec 20260
SKY EXOTICA
SKY CITY DEVELOPERS
Dronagiri30 Apr 202731 Dec 20260
Sky Natraj
Natraj Buildcon
Dronagiri30 Apr 202731 Dec 20250
SPACE GREENS
Space India Builders & Developer
Dundre and Dundrai30 Apr 202731 Dec 20260
SUKH SHANTI RESIDENTIAL PROJECT
SRS DEVELOPERS
Alibag30 Apr 202731 Dec 20260
SUN CITY
JMJ PROJECTS
Panvel30 Apr 202730 Dec 20243
SUNNY HOUSING
KIRAN DILIP CHAVAN
Neral30 Apr 202731 Dec 20260
SWAMI KIMAYA
GALAXY ENTERPRISES
Dhamote30 Apr 202730 Dec 20210
SWAMI MAHIMA
Shree Samarth Developers
Dhamote30 Apr 202731 Dec 20243
Swami Sadan
Anil Baburao Achrekar
Neral30 Apr 202731 Dec 20250
SWASTIK SILVER
PRADNYESH SANJAY KAMBLE
Pushpak30 Apr 202731 Dec 20260
THE GREEN ORCHID PHASE III
SHAKTI DEVELOPERS
Shelu. Karjet30 Apr 202730 Dec 20260
Tower 4, The Highlands, Godrej City, Panvel
CAROA PROPERTIES LLP (Godrej)
Ongc Complexpanvel30 Apr 202731 Dec 20260
TULIP
WALMIK RAGHUNATH KHAIRNAR
Panvel30 Apr 202730 Dec 20220
Unique Aura
Unique Builders and Developers
Pushpak30 Apr 202731 Dec 20260
VAIKUNTH BLISS
DIVYESH DILIPBHAI NAKRANI
Ulawe30 Apr 202731 Dec 20260
VARAD VINAYAK
Suresh Devram Chaudhari
New Panvel East30 Apr 202730 Dec 20260
VARDAAN HEIGHTS
DINESH RAJKUMAR ANAJE
Pushpak30 Apr 202731 Mar 20230
VATSALYA RESIDENCY BUILDING -2
SADANAND WAMAN PATIL
Alibaug30 Apr 202731 Dec 20260
Venkatesha Dream Palace
Venkatesha Dream Homes Realty
Panvel30 Apr 202731 Dec 20260
Venkatesha Heights
Manoj Jaysing Dongare
Dapoli -Pushpak Node30 Apr 202731 Dec 20260
VIGHNAHARTA RESIDENCY
SHREE SWAMI SAMRTH ENTERPRISES
Node Pushpak Navi Mumbai Panvel30 Apr 202731 Dec 20260
VISHWA APARTMENTS
RATNMALA RAMESH KHANVILKAR
Utekhol30 Apr 202731 Dec 20260
Vista Harmony
Divine Group
Panvel30 Apr 202731 Dec 20260
Vista Heights
Mahendra Tambaram Patel
Ulwe30 Apr 202731 Oct 20251
Vrundavan I
MEGHA ENTERPRISES
Old Panvel30 Apr 202731 Dec 20260
Vyom Prime Residency
Dinesh Manikrao Gaikwad
Wahal30 Apr 202730 Mar 20240
Welcome Harbour
Vijay Vasdev Bathija
Panvel30 Apr 202731 Dec 20260
White Falcon
SPS HEIGHTS LLP
Pushpak Node, Dapoli30 Apr 202731 Dec 20260
Wing B Shivam Prajapati Complex
Manoj Ramanand Prajapati
Near Pen Railway Station30 Apr 202730 Jun 20260
Wise City, South Block Phase I, Plot RZ8 Building 2 Wing B3
Wadhwa Construction and Infrastructure Private Limited
Wadhwa Wise City30 Apr 202730 Dec 20264
Wise City, South Block Phase I, Plot RZ8 Building 5 Wing D3
Wadhwa Construction and Infrastructure Private Limited
Wadhwa Wise City30 Apr 202730 Dec 20265
Wise City, South Block Phase I, Plot RZ8, Building 3 Wing C3
Wadhwa Construction and Infrastructure Private Limited
Wadhwa Wise City30 Apr 202730 Dec 20261
Wise City, South Block Phase I, Plot RZ8, Building 5 Wing D4
Wadhwa Construction and Infrastructure Private Limited
Wadhwa Wisecity30 Apr 202730 Dec 20265
Wise City, South Block, Phase I,Plot RZ8 Building 4 Wing F2
Wadhwa Construction and Infrastructure Private Limited
Wadhwa Wise City30 Apr 202730 Dec 20263
Yogakshema Residency Phase-I
Superb Maa Infra and Housing LLP
Giravale30 Apr 202731 May 20260
ZAINAB HEIGHTS
SHALIN DEVELOPERS
Mamdapur30 Apr 202731 Dec 20260
GAVAND PLAZA
GAVAND PLAZA
Anandnagar20 May 202720 Jan 20270
SHRI MANGALMURTHI SAHAKARI GRUH NIRMAN SANSTHA MARYADIT
Shri Mangalmurthi Sahakari Gruhnirman Sanstha Maryadit
Panvel30 May 202730 Sep 20250
LAXMI VILLA
SHREESUNDER DEVELOPERS
Ulwe31 May 202731 Jan 20270
MAZAGON DOCK MANDAR CO-OP. HSG.SOC.LTD.
MAZAGON DOCK MANDAR CO-OP HSG SOC LTD
New Panvel West31 May 202727 Jul 20240
OVI ENCLAVE
STATUS REALTOR
Chinchavli-Shekin, Lowjee, Khopoli31 May 202731 May 20240
Shree Kumaran Residency
ELUMALAI RAMASWAMY CINYA VANYEER
Panvel31 May 202731 Jan 20270
SHREE SAI SHAMBU
SAMEER LALCHAND MHATRE
Nirman Nagari31 May 2027same0
Shree Parshwanath Residency
OM SAI CONSTRUCTION
Neral9 Jun 20279 Feb 20270
Blossom Homes I
Feroze Ahamed Shaikh
Marol30 Jun 202731 Jan 20210
City Of Music Phase I
Nirvana Leisure Realty
Khopoli30 Jun 202730 Oct 20207
Crystal Co-Operative Housing Society Limited
Devki Constructions
Panvel30 Jun 202731 May 20260
DREAM DIGIT
SAINATH MOTOR BODY BUILDERS
Navi Mumbai30 Jun 202730 Jun 20260
KRISHNA ONE
KUBER LAXMI BUILDERS AND DEVELOPERS
Karanjade30 Jun 2027same0
Om Co Operative Housings Society Ltd
Om Co Operative Housings Society Ltd
New Panvel East30 Jun 202731 Dec 20250
RATHODS
Dharmendra Rathod
Taloja - Majkur30 Jun 202729 Jan 20220
SKYWAY ASTER
SKYWAY DEVELOPERS
Node- Pushpak30 Jun 2027same0
SWAMI AASHRAY
STRUCTURA REALTY
Bandivali30 Jun 202730 Jun 20260
VRINDAVAN CHANDAR HEIGHTS
VRINDAVAN DEVELOPERS
Navi Mumbai1 Jul 20271 Mar 20270
NEELKANTH ASPIRE
NEELKANTH PROPERTIES & DEVELOPERS
Panvel20 Jul 202720 Mar 20270
VEDIC GARDEN
CREATIVE PROPTECH PRIVATE LIMITED
Panvel20 Jul 202720 Mar 20270
HAPPY HOMES
RATNESHWAR DEVELOPERS
Panvel29 Jul 202730 Mar 20260
Adhiraj Samyama Tower 1C
Adhiraj Constructions Private Limited
Taloja A.V.31 Jul 202731 Jul 20235
Adhiraj Samyama Tower 1D
Adhiraj Constructions Private Limited
Taloja A.V.31 Jul 202731 Jul 20235
ALIYA PARK
UNITY CONSTRUCTION
Mamdapur31 Jul 202731 Dec 20230
ANAND AARADHYA
AARADHYA DEVELOPERS
Neral31 Jul 202731 Mar 20270
ASCONS GARNET
Ascons Assets India Private Limited
Pushpak Nagar31 Jul 202731 Mar 20270
Balaji Pride - Phase I
EMKAYEN REALTY PVT LTD.
Near Flyover31 Jul 202731 Mar 20261
BHAGWATI ELYSIA - II
BHAGWATI LIFESCAPES LLP
Pushpaknagar31 Jul 202731 Mar 20260
BHOSALE BLUEBELL
BHOSALE INFRASTRUCTURE
Pushpak new31 Jul 202730 Jun 20230
DELTA GREENS
SHREENATHJI ENTERPRISES
Pushpak Node Dapoli31 Jul 202731 Mar 20270
Ellora Emerald
Ellora Asian Infraprojects LLP
Rohinjan -Panvel31 Jul 202731 Mar 20270
GALAXY AURA
RAMESH GOMA GHARAT
Pushpak31 Jul 202715 Dec 20250
GIRIVIHAR RESIDENCY
GIRIVIHAR DEVELOPERS
Karjat31 Jul 202731 Mar 20271
Harmony Residency
Harmony Realtors
Dronagiri31 Jul 202731 Mar 20260
HD PRIDE
HD BUILDERS & DEVELOPERS
Taloja31 Jul 202731 Mar 20270
Heetraj Heights
Yamutai Balaji Vichare
Near Railway Station31 Jul 202731 Mar 20250
Hills Paradise
Bhuvanesh Dhondibhau Jagdale
Panvel31 Jul 202731 Mar 20270
Jindal Enclave
Jindal Builders and Developers
Kasbe31 Jul 202731 Mar 20270
Jindal Legacy
Jindal Builders and Developers
Sai Nagar31 Jul 202731 Mar 20270
KAILASH COMPLEX PHASE 2
BRAMHA CONSTRUCTIONS
Mamdapur31 Jul 202731 Mar 20270
MALHAR HEIGHTS
MALHAR ENTERPRISES
Neral Registration Office31 Jul 202730 Mar 20230
Maruti Galaxy
Maruti Infra Developers
Panvel31 Jul 202730 Sep 20250
Mauli Audumbar
VM and Associates
Gangal Ali31 Jul 202731 Mar 20270
MAZAGON DOCK NIVARA CO-OP. HSG. SOC. LTD.
MAZAGON DOCK NIVARA CO-OP HSG SOC LTD
New Panvel West31 Jul 202730 Sep 20240
NEW JADHAV APARTMENT
RIDDHI DEVELOPERS
Talkar Nagar31 Jul 202731 Mar 20270
OM SAI LEELA
DASHRATH NANA GHULE
Shedung31 Jul 202731 Mar 20270
Paraskunj
PUNIT ENTERPRISES
Panvel31 Jul 202731 Mar 20260
Pillars Exotica
Riddhi Siddhi Developer
Pushpak Node, Vahal31 Jul 202731 Mar 20270
PRAMUKH PRIDE
PRAMUKH DEVELOPERS
Kharghar31 Jul 202731 Mar 20270
PRIME ROSE
AK HITECH ASSOCIATES
Navi Mumbai31 Jul 202731 Mar 20270
ROYAL RESIDENCY
Royal Enterprises
Takai31 Jul 202730 Mar 20240
SAGAR SARGAM RESIDENCY
Shree Tulsi Developes
Halivali Karjat31 Jul 202730 Dec 20240
Sai Darshan
RAVI KIRAN ENTERPRISES
Ulwe – Pushpak31 Jul 202731 Mar 20270
SAI PRESTIGE
SAI ATHARVA DEVELOPERS
Node - Pushpak31 Jul 202731 Mar 20271
Shanti Lake View
Padmavati Developers
Village Neral, Tal Karjat, Dist Raigad31 Jul 202731 Mar 20270
SHREE SAI CORNER
SHREE GANESH BUILDERS AND DEVELOPERS
Panvel31 Jul 202730 Dec 20230
SHREEJI DIVINE
SHREEJI VENTURES LIFESPACES LLP
Taloja A.V.31 Jul 202731 Mar 20270
SHREEPATI KALASH
SATPANTH CORP
Pushpak31 Jul 202731 Mar 20270
SIDDHIVINAYAK EKDANT
KIRAN NARAYAN PAWAR
Vadghar31 Jul 202731 Mar 20270
Siddhivinayak Heights
Art Vision Builders and Developers
Karjat31 Jul 202731 Mar 20250
SIDDHIVINAYAK VIGHNAHARTA
SIDDHIVINAYAK BUILDERS AND DEVELOPERS
Pushpak31 Jul 202731 Mar 20270
SNEHPRABHA RESIDENCY
DHANLAXMI DEVELOPERS
Roha31 Jul 202731 Mar 20270
SSV Elite
SSV BUILDERS
Panvel31 Jul 202731 Mar 20270
SUZAIN PLAZA
S N DEVELOPERS
NERAL Mamdapur Karjat31 Jul 202731 Dec 20250
TARUN PLANTATIONS COMPANY
TARUN PLANTATIONS COMPANY
Pen31 Jul 202730 Mar 20220
TRULIFE
HNH-HD JV
Karjat31 Jul 202731 Dec 20250
White Mist
ICON REALTY
Ulwe31 Jul 202731 Mar 20270
YUVARNA RESIDENCY
BHARAT MANGILAL JAIN
Pen31 Jul 202731 Mar 20270
ADITYA RESIDENCY
ADITYA PRAVIN BUILDERS AND DEVELOPER PRIVATE LIMITED
Panvel30 Aug 202730 Apr 20270
Amrutwel Co-Operative Housing Society Limited
SWAROOP DEVELOPERS
Near Prant Office Panvel30 Aug 202730 Apr 20270
ARYAN CORNER
G R K INFRA DEVELOPMENTS
Dapoli30 Aug 202715 Aug 20260
Bhiva Tower
YASH DEVELOPERS UNIT OF VIKRANT V RAIKAR HUF
Navi Mumbai30 Aug 202730 Apr 20250
Gurudarshan Residency
Bhoomi Space Realtors and Developers
Karanjade - Panvel30 Aug 202730 Apr 20270
KUBER HERITAGE
GNM GROUP
Panvel30 Aug 202730 Apr 20270
Vastu Morya
Vastushilp Constructions
Panvel30 Aug 202730 Apr 20260
SHEETAL PARK
LMG ENTERPRISES
Village Akurli31 Aug 202730 Dec 20222
Plot No 1 Sec-8A, Kharkopar West
CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED
Near Railway Station1 Sep 20271 May 20270
AAI RESIDENCY
GUNWANT BHAGAWAN GOWARI
Vadghar Pushpak30 Sep 202730 Jun 20260
BALAJI VISTA
VARSHA BUILDCON
Navi Mumbai30 Sep 202731 May 20270
BALAJI ZOWIE
RELIABLE REALTIES
Village Panchanand Taloja30 Sep 202731 May 20270
CENTURY HEIGHTS
PRABHU VIRJI PATEL
Kalamboli30 Sep 202730 Sep 20260
MAULI
MANAS GROUP
New Panvel30 Sep 202731 May 20270
MAULI PLAZA
MAULI DEVELOPERS
MIDC Mahad30 Sep 202731 May 20270
Orchid Castle
PRIYAL PROPERTIES
Panvel30 Sep 202731 May 20270
RIDDHI SIDDHI PARVATI
RIDDHI SIDDHI MEGA STRUCTURE PRIVATE LIMITED
Pushpak30 Sep 202731 May 20270
Sahakar Co Operative Housing Society
Punit Reality
Panvel30 Sep 202731 May 20260
SAI ANNAPURNA
GNS INFRA
Node-Pushpak30 Sep 202731 May 20270
SAI DHANAJI
KUSUM DHANAJI MHATRE
Wahal30 Sep 202731 May 20270
SAI KRUPA
K T REALTY
Navimumbai30 Sep 20271 Oct 20241
Saras Emerald
Arya Realty
Dapoli30 Sep 202731 May 20270
Shree Radha Krishna Residency
SHREE RADHA ENTERPRISES
Chendhare30 Sep 202731 May 20270
THE SELECT AT THE SANCTUARY P1
LCORP REAL ESTATE LLP
Tembhare Karjat Raigad30 Sep 202731 May 20270
VIJAYSHREE APARTMENT
RITESH FUTARMAL DOSHI
Near Jogeshwari Temple30 Sep 2027same0
ZILLION TOWER ONE
RAJAL INFRA LLP
Dronagiri30 Sep 202731 May 20270
Pushp Vasundhara
Hari Om Builders and Developers
Poyanje1 Oct 20271 Jun 20270
Heramba Residency
Bishwamitra Rampravesh Sah
Pushpak Node -Panvel5 Oct 20275 Jun 20270
RAMESHWARI APARTMENT
VASTU DEVELOPERS
Roha18 Oct 202718 Jun 20270
SWAGAT VILLAGE
NAYAN INFRASTRUCTURE
Karjat29 Oct 202730 Jun 20231
21 ENCLAVE
Pushpam Infra LLP
Kashele30 Oct 202731 Dec 20250
A Z LANDMARK
A Z REALTY
Karjat30 Oct 202730 Jun 20230
ADINATH REVA
SHREE RIDDHI SIDDHI CONSTRUCTIONS
Pushpak Node, Vahal30 Oct 202730 Jun 20270
Ameya Arcade
Pushpam Infrastructure Developers
Panvel30 Oct 202731 Dec 20190
ARAMUS RUDRA
GURUKRUPA PRIDE
Kharghar30 Oct 202730 Jun 20270
Athos -1
Prime Peak Realty Private Limited
Pushpak30 Oct 202730 Jun 20260
Balaji Evara
Konkan Shrusti Infra Developers LLP
Panvel30 Oct 202730 Jun 20270
BLISS SOLITAIRE APARTMENT
AHAMEDSHARIEF LALUSAHEB SAYED
Dhamote Phata30 Oct 202731 Mar 20260
Century Tower
Century Enterprises
Ulwe30 Oct 202730 Jun 20270
Divine Paradise
Rushikesh Bhaguji Zore
Pushpak- Vahal30 Oct 202730 Jun 20260
Future Amrut
Future Buildcon
Wangani30 Oct 202730 Jun 20270
Ganushet Keni Heritage
Dinesh Manohar Keni
Taloja30 Oct 202730 Jun 20260
GREEN VALLEY
ICON DEVELOPERS
Mamdapur30 Oct 202731 Mar 20260
GURUDARSHAN PRIDE
GURUDARSHAN REALTORS
Pen30 Oct 202731 Dec 20250
GURUKRUPA ONE
GURUKRUPA REALTY
Kasal Khand30 Oct 202731 Dec 20250
Hari Darshan
Hari Construction
behind Satyanarayan Residency Pen30 Oct 202730 Jun 20270
Hari Priya
Shree Priyakanthji Realtors LLP
Pushpak, Dapoli30 Oct 202730 Jun 20270
Ideal Palace
Infinity Enterprises
Panvel30 Oct 202731 Dec 20250
JANKI NIWAS
DWINETRA DEVELOPERS
Alibag30 Oct 202730 Jun 20270
KRISHNA KUNJ
KRISHNA DEVELOPERS
Wahal30 Oct 202730 Jun 20270
MAN SAROJ PLAZA
NILESH MANGILAL JAIN
Nagothane30 Oct 202731 Mar 20250
MAPLE 07
BHOOMI & DHARTI ASSOCIATES
Karanjade30 Oct 202730 Jun 20270
Nakshatra Heights
Sharvari Enterprises
Ziral Ali30 Oct 202730 Jun 20260
Ocean Heights
H S Construction
Old Panvel30 Oct 202731 Dec 20240
Patel Park
A K Infinia Realtors
Ulwe30 Oct 202730 Jun 20270
PRIME AVENUE
DEVRAJ BUILDERS & DEVELOPERS
Panvel30 Oct 202730 Jun 20270
RE CASA
R S Realties
Bherav30 Oct 202730 Jun 20270
Regents Park Kharghar
METRO SATYAM DEVELOPERS
Rohinjan30 Oct 202730 Jun 20273
RHYTHM PLANET
SKY HOME DEVELOPERS
Pushpak Wahal30 Oct 202731 Dec 20250
RIYASAT ROYALCREST
Riyasat Infra Developers Private Limited
Vavandhal30 Oct 202730 Jun 20270
ROCKGOLD RUBY
ROCKGOLD INFRA LLP
Pushpak New30 Oct 202730 Dec 20220
S. K. RESIDENCY
S. K. REALTY
Ulwe30 Oct 202730 Jun 20270
SATYANATH
Sai Smaran infra and Developers
Dahiwali Taref Need30 Oct 202731 Jan 20236
Shree Ashtavinayak
Infiniti Developers
Devad30 Oct 202730 Jun 20270
SHREE GANESH RESIDENCY
ARTH REALTORS
Diksal Gavthan30 Oct 202730 Jun 20240
Shree Sadguru Krupa Mandavkar Complex
Shree Ratnadeep Developers
Nagothane30 Oct 202730 Jun 20260
Shree Vastu Symphony
Shree Vastupurti Associates
Vihighar30 Oct 202730 Sep 20230
SHREEJI CLOUD
SHREEJI LIFESPACES INFRASTRUCTURE
Ulwe30 Oct 202730 Jun 20260
Shreepati Amara
M/s Rudra Lifespaces
Panvel30 Oct 202730 Jun 20270
Siddhivinayak Heights
Dream World Developers
Pushpak node, Panvel30 Oct 202731 Dec 20260
Suki-Nihon-Phase 2
NIMESH KIRTI CHHATBAR
Bamangaon, Bagmala30 Oct 202731 Dec 20240
VILLA PALACIA
KHODAL REALCON LLP
Bokadvira30 Oct 202730 Jun 20270
Shiv Laxmi Heights
Jalgaonkar And Sons Pvt. Ltd
Lal Bahadur Shastri Nagar31 Oct 2027same0
Swastik Regalia
Ms Shree Enterprises
Kalamboli15 Nov 202715 Jul 20270
VAISHNAVI EMPERIA
RK GROUP OF INFRA
Dronagiri Uran29 Nov 202730 Dec 20242
AAIJI GALAXY
AAIJI DEVELOPERS
Pushpak Node30 Nov 202731 Jul 20270
ABIDA MANSION
AYUB ISHAQUE MOHAMMED KHAN
Mamdapur30 Nov 202731 Dec 20250
Kaustubh
Vijay Jadhav Kadu
Taloja A.V.30 Nov 202731 Jul 20270
LAKHANIS ORCHID WOODS
LAKHANI CONSTRUCTIONS LLP
Khopoli30 Nov 202731 Jul 202315
Plot No. 11 Sector-8 New Panvel West Bus Terminus
CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED
New Panvel West30 Nov 202730 Jun 20250
Plot No. 19 Sector-14 Kharghar Bus Terminus
CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED
Kharghar30 Nov 202730 Jun 20250
PUNIT IMPERIA
PUNIT REALTY
Kharghar30 Nov 202731 Jul 20270
Royal Heights
Ayesha Enterprises
Taloja30 Nov 202731 Jul 20270
SAGARIKA CO OP HSG SOCIETY LTD
SAGARIKA CO OP HSG SOCIETY LTD
New Panvel West30 Nov 20275 Aug 20242
Sapphire Infra
M/S SAPPHIRE INFRA
Khopoli30 Nov 202731 Jul 20250
SHRI APARTMENT
SANTOSH K GHARAT
Vadghar, Node-Pushpak30 Nov 202731 Jul 20270
Vanashri Vandan
Ashiana Buildcon
Alibag30 Nov 202731 Jul 20270
VILLA SPRING
KHODAL REALCON LLP
Dronagiri30 Nov 202731 Jul 20270
Yamuna Niwas
M/s Vighnaharta Properties
Pushpak Node30 Nov 202731 Jul 20270
SHELTON CHS
JALARAM AND ASSOCIATES
Near HOC Colony13 Dec 202713 Aug 20270
Arham One
Avyu Buildcon Private Limited
Panvel24 Dec 202724 Aug 20270
ARIHANT ASPIRE PHASE I
ARIHANT ABODE LIMITED
Panvel30 Dec 202730 Dec 202610
Gurukul Residency
Jagruti Mangesh Mhatre
Near Private Highschool30 Dec 202730 Aug 20270
SUNDARVAN NINES
F ND H CONSTRUCTIONS LLP
Pen30 Dec 2027same0
7 KOLGAON-PHASE-1
SATELLITE DEVELOPERS PVT LTD
Kolgaon31 Dec 202731 Aug 20250
Advika Hill City-1
Shirish Khivraj Gadiya
Khalapur31 Dec 202726 Aug 20260
Amrut Palace
Shree Ganesh Enterprises
Dapoli, Pushpak Nagar31 Dec 2027same0
Anand Nagar Commericial building
Anubhavshri Realty Pvt. Ltd.
Kalina31 Dec 202730 Dec 20210
ARISE ARCADE
ARISE DEVELOPERS
roha31 Dec 202730 Jun 20210
ASCENT FORTUNE PHASE 1
ASCENT REALTY
Dahivali Tarfe Need31 Dec 202731 Dec 20230
BHAVESHWAR RUDRA
RUDRA INFRA
Pushpak Node31 Dec 202731 Dec 20260
BRAMHA HERITAGE
SHREE BRAMHA ENTERPRISES
Central Park Road31 Dec 202731 Dec 20240
CELESTE VILLAS
BUILD MARQUE REALTY LLP
Karjat S.O (Raigarh(MH))31 Dec 202731 Oct 20250
CROWN
BHASIN PROPERTIES AND DEVELOPERS PVT LTD
Mauje Khandad31 Dec 202730 Dec 20223
Gami Bianca
LAL GEBI INFRA PRIVATE LIMITED
Dronagiri31 Dec 2027same1
HILLCREST
ERDAMOR REALTY LLP
Panvel31 Dec 2027same0
IRIS VIEW
DHARMISHT KULWANT BANSAL
Panvel31 Dec 2027same0
LA Avenue
AURUS PRORORA LLP
Ghot31 Dec 2027same0
MANGALMURTI NITIN ICON
MANGALMURTI LIFESPACES
Pushpak Vadghar31 Dec 2027same0
MILLENNIUM FLORA
MILLENNIUM INFRA
New Panvel West31 Dec 202731 Aug 20260
Nirvana Bougainvilla
Kishor Otarmal Jain
Usale31 Dec 202731 Dec 20252
Plot No.-1 Sector -39 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED
Taloja31 Dec 202731 Dec 20250
Sai Imperia
YJNJ INFRA LLP
Pushpak31 Dec 2027same0
SAI MORESHWAR
SPACE LAND DEVELOPERS
Neral East Talika- Karjat Dist Raigad31 Dec 202731 Dec 20196
SAICCHA PARK
KASHEENATH LOTNKAR
Panvel31 Dec 202730 Jun 20230
Samrat Residency
Tejas Rajendra Mashalkar
Pushpak Wahal31 Dec 2027same0
SHAH KINGDOM PHASE V E WING
SHAH GROUP BUILDERS LTD
Kharghar31 Dec 202730 Dec 20232
SHIVESH DAMODAR
SHIVESH DEVELOPERS LLP
Panvel31 Dec 202731 Aug 20270
Shree Prasad
Shree Sai Enterprises
Vadghar, Pushpak Node31 Dec 2027same0
SHREE SADGURU PARK
SAFAL DEVELOPERS
Pen31 Dec 202731 Aug 20270
Surya Nath Niwas
Akhand Realtors
Pushpak31 Dec 2027same0
TAPASYA-MANASVI HEIGHTS
VCA SKY PROPERTIES
Pushpak Wahal31 Dec 202731 Aug 20270
Tricity Crest
Tricity Realty LLP
Panvel31 Dec 2027same0

Other years in Raigad: 2026 (140) · 2028 (351) · 2029 (310) · 2030 (219) · 2031 (122)

Source: GharKundli’s check of MahaRERA records. More projects appear as GharKundli reads them.